Block 1061, lot 039
422 Arguello Blvd
- City’s use
- Multi-Family Residential
- Built
- 1963
- Stories
- 2
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,246 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2021 | Completed final sign-off Oct 2021 | 422 Arguello Bl | Gil Construction & Assoc Inc. | remove and replace 3 windows and one sliding door with new white vinyl windows and lider. not visible from street. replace in kind.Details
remove and replace 3 windows and one sliding door with new white vinyl windows and lider. not visible from street. replace in kind. | $8,000 |
| Apr 22, 2021 | Completed final sign-off Jul 2022 | 422 Arguello Bl | Crime Watch Security Sys Llc | tenant improvement: upgrade existing fire alarm system to comply with sffc section 1103.7.6.1Details
tenant improvement: upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 | $10,000 |
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 422 Arguello Bl | street spaceDetails
street space | ||
| Oct 3, 2018 | Completed final sign-off Feb 2019 | 422 Arguello Bl | Gil Construction & Assoc Inc. | soft story seismic retrofit in accordance with sf ordinance 66-13, sfbc chapter 4d utilizing iebc a-4 methodology.Details
soft story seismic retrofit in accordance with sf ordinance 66-13, sfbc chapter 4d utilizing iebc a-4 methodology. | $42,000 |
| Jul 17, 2018 | Completed final sign-off Apr 2019 | 422 Arguello Bl | Gil Construction & Assoc Inc. | repairing & reconstructing the 1st fl main staircase & adj. part. walls damaged by car collision damage. comply w/nov #201873461. priority given to reconstr of main staircase to allow tenants to move back into bldg. displaced steel beam header above garage opening to be addressed/fixed future permitDetails
repairing & reconstructing the 1st fl main staircase & adj. part. walls damaged by car collision damage. comply w/nov #201873461. priority given to reconstr of main staircase to allow tenants to move back into bldg. displaced steel beam header above garage opening to be addressed/fixed future permit | $35,000 |
| Apr 3, 2017 | Never finaled issued Apr 2017, no final | 422 Arguello Bl | street space permitDetails
street space permit | ||
| Dec 20, 2016 | Completed final sign-off May 2017 | 422 Arguello Bl | Gil Construction & Assoc Inc. | replace 4 street facing windows in-kind and remove siding. refinish siding.in apts # 1 & 4Details
replace 4 street facing windows in-kind and remove siding. refinish siding.in apts # 1 & 4 | $4,500 |
| Nov 5, 2013 | Never finaled issued Nov 2013, no final | 422 Arguello Bl | A B C Window Contractors | unit #6: install 3 vinyl windows in kind into (e) frames, no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with sec cbc1026 for rescue. all windows will be double pane and have a u-factor of .30Details
unit #6: install 3 vinyl windows in kind into (e) frames, no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with sec cbc1026 for rescue. all windows will be double pane and have a u-factor of .30 | $2,795 |
| Dec 10, 2009 | Never finaled issued Dec 2009, no final | 422 Arguello Bl | Mr. Roofing, Inc. | reroofingDetails
reroofing | $13,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gil Construction & Assoc Inc. (4), A B C Window Contractors, Crime Watch Security Sys Llc, Mr. Roofing, Inc.
- Engineers
- Joshua Marrow, Joshua Marrow
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.