Fog City Roofiing Llc
- Based in
- Alameda
- On San Francisco permits
- Jan 2022 to May 2026
- Last 24 months
- 74 permits filed
115 permits since 2000: 104 completed, 7 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2022 | Never finaled issued Sep 2022, no final | 930 Montgomery St | roof deck waterproof system installation. 1 coat of sikalastic primer, 1 coat of sikalastic 710 base low voc @ 26 wm. 1 coat of sikalastic 736 texture @ 18 wmDetails
roof deck waterproof system installation. 1 coat of sikalastic primer, 1 coat of sikalastic 710 base low voc @ 26 wm. 1 coat of sikalastic 736 texture @ 18 wm | $20,000 |