Permit GraphShortlistSan Francisco building permits since 2000

Block 0640, lot 016

2015 Sacramento St

City’s use
Multi-Family Residential
Built
1900
Stories
3
Units
11
Rooms
11 bedrooms, 11 bathrooms
Building
6,090 sq ft
Lot
3,438 sq ft
Zoning
RM2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

9 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 29, 2026In progress
issued Sep 2026
2015 Sacramento StCommercial Fire Protection Llcrevision to pa 202404301094 replace the panel communicator and pull stations and smoke detector from ground level to 2nd level lobby. remove 1 smoke, 1 pull from 2nd floor. remove annunciator from ground floor
Details
Permit
202609298765
Status
issued
Filed
Sep 29, 2026
Permit issued
Sep 29, 2026
Address
2015 Sacramento St

revision to pa 202404301094 replace the panel communicator and pull stations and smoke detector from ground level to 2nd level lobby. remove 1 smoke, 1 pull from 2nd floor. remove annunciator from ground floor

Open the permit page

Mar 31, 2025Completed
final sign-off May 2025
2015 Sacramento StFog City Roofiing Llcreroofing with hot works.
Details
Permit
202503313395
Status
complete
Filed
Mar 31, 2025
Permit issued
Mar 31, 2025
Final sign-off
May 9, 2025
Declared cost
$28,500
Address
2015 Sacramento St

reroofing with hot works.

Open the permit page

$28,500
May 7, 2024Completed
final sign-off Oct 2024
2015 Sacramento StAligned Technologies Llc Dba Aligned Devrevision to 202208170711. install 2 new steps at side yard rather than 3, install 1 step at unit 104 entry. coordinate with revised structural design.
Details
Permit
202405071616
Status
complete
Filed
May 7, 2024
Permit issued
May 14, 2024
Final sign-off
Oct 24, 2024
Address
2015 Sacramento St

revision to 202208170711. install 2 new steps at side yard rather than 3, install 1 step at unit 104 entry. coordinate with revised structural design.

Open the permit page

Apr 30, 2024In progress
issued May 2024
2015 Sacramento StCommercial Fire Protection Llcupgrade (e) fire alarm include manual pull stations & smoke detectors. (e) bells replace w/ horn/strobes. units to have 520hz low-frequency audibles installed. fire alarm control panel shall be monitored w/ starlink 24v call gms-sole path communication.
Details
Permit
202404301094
Status
issued
Filed
Apr 30, 2024
Permit issued
May 20, 2024
Declared cost
$39,000
Address
2015 Sacramento St

upgrade (e) fire alarm include manual pull stations & smoke detectors. (e) bells replace w/ horn/strobes. units to have 520hz low-frequency audibles installed. fire alarm control panel shall be monitored w/ starlink 24v call gms-sole path communication.

Open the permit page

$39,000
Aug 17, 2022Completed
final sign-off Oct 2024
2015 Sacramento StAligned Technologies Llc Dba Aligned Devunit 104: remodel of (e) ground floor unit 104. excavate 7in at g/f unit.
Details
Permit
202208170711
Status
complete
Filed
Aug 17, 2022
Permit issued
Jul 11, 2023
Final sign-off
Oct 24, 2024
Declared cost
$60,000
Address
2015 Sacramento St

unit 104: remodel of (e) ground floor unit 104. excavate 7in at g/f unit.

Open the permit page

$60,000
Jan 18, 2017Completed
final sign-off Jan 2017
2015 Sacramento StNabi Construction & Engineering Increvision to pa 2016-0429-6170 (soft story). relocate steel moment frame from grid line 2 to grid line 1.5
Details
Permit
201701187392
Status
complete
Filed
Jan 18, 2017
Permit issued
Jan 23, 2017
Final sign-off
Jan 24, 2017
Address
2015 Sacramento St

revision to pa 2016-0429-6170 (soft story). relocate steel moment frame from grid line 2 to grid line 1.5

Open the permit page

Apr 29, 2016Completed
final sign-off Jan 2017
2015 Sacramento StNabi Construction & Engineering Incsoft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4
Details
Permit
201604296170
Status
complete
Filed
Apr 29, 2016
Permit issued
Oct 21, 2016
Final sign-off
Jan 24, 2017
Declared cost
$90,000
Address
2015 Sacramento St

soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4

Open the permit page

$90,000
Dec 6, 2013Never finaled
issued Dec 2013, no final
2015 Sacramento Ststreet space
Details
Permit
M449147
Status
issued
Filed
Dec 6, 2013
Permit issued
Dec 6, 2013
Address
2015 Sacramento St

street space

Open the permit page

Dec 12, 2011Never finaled
issued Dec 2011, no final
2015 Sacramento Ststreetspace
Details
Permit
M292407
Status
issued
Filed
Dec 12, 2011
Permit issued
Dec 12, 2011
Address
2015 Sacramento St

streetspace

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Aligned Technologies Llc Dba Aligned Dev (2), Commercial Fire Protection Llc (2), Nabi Construction & Engineering Inc (2), Fog City Roofiing Llc
Architects
Serina Calhoun (2)
Engineers
Javed J. Tharavi, Juan Aleman-Hernandez, Siavash Sorousian

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.