Michael Harris
- Listed as
- architect, authorized agent-others, designer
- Firm
- Michael Harris Architecture
- Based in
- San Francisco
- On San Francisco permits
- Feb 2003 to Oct 2026
134 permits since 2000 (architect on 126 permits, authorized agent-others on 5 permits, designer on 3 permits): 92 completed, 12 in progress, 16 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 134.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 1270 Valencia St | R J M Properties | revision to pa #202411084703 pemit for mep,hvac, and lighting.Details
revision to pa #202411084703 pemit for mep,hvac, and lighting. | $1,000 |
| Sep 18, 2026 | Expired or cancelled withdrawn Oct 2026 | 1270 Valencia St | revision to pa #202411084703 to make existing east bathroom with shower to and all gender bathroom, with shower of an all gender bathroom with/out a shower, accessible. under original permit. the west bathroom will be an all gender accessible bathroom w/a shower.Details
revision to pa #202411084703 to make existing east bathroom with shower to and all gender bathroom, with shower of an all gender bathroom with/out a shower, accessible. under original permit. the west bathroom will be an all gender accessible bathroom w/a shower. | $1,000 | |
| Sep 18, 2026 | In progress issued Oct 2026 | 1680 Mission St | R J M Properties | remove metal siding that was placed where original windows were located and removed on the east elevation. place new window within existing openings. add glass doors to replace existing roll up door.Details
remove metal siding that was placed where original windows were located and removed on the east elevation. place new window within existing openings. add glass doors to replace existing roll up door. | $15,000 |
| Jul 23, 2026 | In progress issued Sep 2026 | 240 Carl St | Smb Construction | revision to pa#202307111838 & pa #202511210228. horizontal & additon 40 sf 1st & 2nd level. remove stair in garage. 1st flr: study to be storage. remodel 2nd floor kitchen, enlage opening, remove bathroom @ 2nd floor. remove posts below bay window, no increase window size from approved permit.Details
revision to pa#202307111838 & pa #202511210228. horizontal & additon 40 sf 1st & 2nd level. remove stair in garage. 1st flr: study to be storage. remodel 2nd floor kitchen, enlage opening, remove bathroom @ 2nd floor. remove posts below bay window, no increase window size from approved permit. | $30,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 15 Westgate Dr | J Construction Solutions | revision to permit 202507281716 to add deck over portion of 2nd floor. revise kitchen layout and revise special inspection.Details
revision to permit 202507281716 to add deck over portion of 2nd floor. revise kitchen layout and revise special inspection. | $25,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 125 Mallorca Wy | J Construction Solutions | add (n)_ roof deck not to exceed 500sf. create opening for door at (e) 3rd floor bedroom for access. replace (e) tiles of roof for entirey of (n) deck location.Details
add (n)_ roof deck not to exceed 500sf. create opening for door at (e) 3rd floor bedroom for access. replace (e) tiles of roof for entirey of (n) deck location. | $95,000 |
| Sep 16, 2025 | In progress issued Feb 2026 | 15 Westgate Dr | J Construction Solutions | 2-story horizontal addition in (e) light well south side enlarging kitchen & storage space below. horizontal addition at 3/f over a portion of 2nd story roof will accomodate rebuilding of (e) stair to be code compliant. (e) kitchen will be remodeled.Details
2-story horizontal addition in (e) light well south side enlarging kitchen & storage space below. horizontal addition at 3/f over a portion of 2nd story roof will accomodate rebuilding of (e) stair to be code compliant. (e) kitchen will be remodeled. | $300,000 |
| Mar 25, 2025 | In progress filed Mar 2025, not yet issued | 1830 Jackson St | unit "e" install alcohol burning appliances in existing vented fireplace.Details
unit "e" install alcohol burning appliances in existing vented fireplace. | $500 | |
| Feb 26, 2025 | Completed final sign-off Mar 2025 | 3150 18th St | to abate nov 202317343 by patching leak & repair sheet rock.not visable from street. 5sf of sheetrock repairDetails
to abate nov 202317343 by patching leak & repair sheet rock.not visable from street. 5sf of sheetrock repair | $300 | |
| Feb 10, 2025 | In progress issued Feb 2026 | 1270 Valencia St | R J M Properties | to comply w/ nov# 202305585 and planning #2023-002956enf, removing 5 (e) skylights, adding 21 skylights, add continuous dormers on the north/south sides of roof w/ clearstory windows. note (e) ridge to remain. make restrooms on 2/f accessible. remove non-permit cook, plumbing fixtures/appliances.Details
to comply w/ nov# 202305585 and planning #2023-002956enf, removing 5 (e) skylights, adding 21 skylights, add continuous dormers on the north/south sides of roof w/ clearstory windows. note (e) ridge to remain. make restrooms on 2/f accessible. remove non-permit cook, plumbing fixtures/appliances. | $150,000 |
| Jan 22, 2025 | In progress issued Feb 2025 | 655 Kansas St | unit 501-replace (e) deck that was removed in 2022 10x 15 ft (150 sf)Details
unit 501-replace (e) deck that was removed in 2022 10x 15 ft (150 sf) | $2,500 | |
| Nov 7, 2024 | Completed final sign-off Sep 2025 | 1830 Jackson St | J Construction Solutions | unit# e on 2/f: remodel unit# e to include all flooring, elec, plumbing, sheetrock in all kitchen, bathrooms, bedrooms, living areas and studies. add one new bathroom. replace window in kind, not visible from prow.Details
unit# e on 2/f: remodel unit# e to include all flooring, elec, plumbing, sheetrock in all kitchen, bathrooms, bedrooms, living areas and studies. add one new bathroom. replace window in kind, not visible from prow. | $520,000 |
| Aug 15, 2024 | Completed final sign-off Sep 2024 | 1 Gladeview Wy | Peter Harris Construction Inc | to abate nov 202418320 for work already completed under different permit for configuration of stairs on rear deck to the lower level deckDetails
to abate nov 202418320 for work already completed under different permit for configuration of stairs on rear deck to the lower level deck | |
| Jun 25, 2024 | Completed final sign-off Aug 2024 | 4034 20th St | Peter Harris Construction Inc | revision to 202110019684 to change window configuration at kitchen on 3rd floor. non-structural revision to 3rd floor layout.Details
revision to 202110019684 to change window configuration at kitchen on 3rd floor. non-structural revision to 3rd floor layout. | |
| Nov 16, 2023 | In progress issued Nov 2023 | 4034 20th St | Peter Harris Construction Inc | bldg a amend pa 2021-1001-9684 with revised title 24 calculations. no change to buildingDetails
bldg a amend pa 2021-1001-9684 with revised title 24 calculations. no change to building | |
| Nov 16, 2023 | Completed final sign-off May 2024 | 4034 20th St | Peter Harris Construction Inc | amend pa 202110019688 (bldg b) with revised title 24 calculations, sheets t24.1 and t24.2. no chage to buildingDetails
amend pa 202110019688 (bldg b) with revised title 24 calculations, sheets t24.1 and t24.2. no chage to building | |
| Oct 31, 2023 | In progress filed Oct 2023, not yet issued | 5815 03rd St | remove non structural wall, open area of floor, replace finishes and light fixtures.Details
remove non structural wall, open area of floor, replace finishes and light fixtures. | $30,000 | |
| Oct 20, 2023 | Completed final sign-off Feb 2024 | 655 Kansas St | Muldoon Construction Inc | unit 501: to comply with nov# 202314581. remove deck that was installed on roof of 4th fl without a permit and permit existing sliding door installed without permit. add guardrail at door.Details
unit 501: to comply with nov# 202314581. remove deck that was installed on roof of 4th fl without a permit and permit existing sliding door installed without permit. add guardrail at door. | $5,000 |
| Oct 5, 2023 | Completed final sign-off Oct 2024 | 1606 Jones St | R J M Properties | to comply with dbi internal audit nov 202306395 where work was done under canceled permit #201812067678. this permit to legalize one adu at basement level with one bedroom per state adu ordinanceDetails
to comply with dbi internal audit nov 202306395 where work was done under canceled permit #201812067678. this permit to legalize one adu at basement level with one bedroom per state adu ordinance | $25,000 |
| Aug 2, 2023 | Completed final sign-off Aug 2023 | 655 Kansas St | Muldoon Construction Inc | to comply with his nov#202309736 to legalize door installed in third floor hallway leading to balcony of apt 305 (installed without permit).Details
to comply with his nov#202309736 to legalize door installed in third floor hallway leading to balcony of apt 305 (installed without permit). | $1,800 |
| Jul 24, 2023 | Expired or cancelled withdrawn Aug 2024 | 55 Ulloa St | addition of 3rd floor with bathroom, bedroom, and study. new stair from 1st to 3rd story. remodel existing kitchen and 1st floor.Details
addition of 3rd floor with bathroom, bedroom, and study. new stair from 1st to 3rd story. remodel existing kitchen and 1st floor. | $385,000 | |
| Jul 11, 2023 | In progress issued Apr 2025 | 240 Carl St | De Brus Construction Inc | vertical addition. to comply with nov 202037711. dmg foundation caused by work at adj prop., (e) foundation will be replaced by adding a basement lv. two units on 3rd lv will be combined w/ 1 of the units relocated to basement lv. 1st fl remodel. rebuilt 50% of (e) rear stair in-kind.Details
vertical addition. to comply with nov 202037711. dmg foundation caused by work at adj prop., (e) foundation will be replaced by adding a basement lv. two units on 3rd lv will be combined w/ 1 of the units relocated to basement lv. 1st fl remodel. rebuilt 50% of (e) rear stair in-kind. | $467,564 |
| May 5, 2023 | Never finaled issued Jul 2023, no final | 120 Seneca Av | revise bpa#202107265080, extent 1/f & 2/f approx 5'6" to within 30' of rear property line @ 2/f, rear balconies on original permit are removed, sliding doors replaced by windows, 3/f balcony is removed & roof of additiona is deck sim to roof, all other work shown on permit 202107265080 in unchanged.Details
revise bpa#202107265080, extent 1/f & 2/f approx 5'6" to within 30' of rear property line @ 2/f, rear balconies on original permit are removed, sliding doors replaced by windows, 3/f balcony is removed & roof of additiona is deck sim to roof, all other work shown on permit 202107265080 in unchanged. | ||
| Feb 24, 2023 | Completed final sign-off May 2023 | 698 Bush St | G M Building And Construction Inc | #501. revison to pa# 202302021227. renovate entire apt, remove all plaster. remove non structural wall.Details
#501. revison to pa# 202302021227. renovate entire apt, remove all plaster. remove non structural wall. | $1,000 |
| May 20, 2022 | Completed final sign-off May 2024 | 4034 20th St | Peter Harris Construction Inc | bldg b: revision to pa# 202110019688. structural details.Details
bldg b: revision to pa# 202110019688. structural details. | |
| May 20, 2022 | Completed final sign-off Aug 2024 | 4034 20th St | Peter Harris Construction Inc | bldg a: revision to pa# 202110019684. structural details and relocation of half bath on 3rd fl.Details
bldg a: revision to pa# 202110019684. structural details and relocation of half bath on 3rd fl. | |
| Apr 19, 2022 | Completed final sign-off May 2022 | 4042 20th St | Peter Harris Construction Inc | revision to 202011179006. omit kitchen remodel, remove deck @ 2nd flDetails
revision to 202011179006. omit kitchen remodel, remove deck @ 2nd fl | |
| Apr 19, 2022 | Completed final sign-off May 2022 | 4042 20th St | Peter Harris Construction Inc | revision to 202006128494. omit fence @ front property lineDetails
revision to 202006128494. omit fence @ front property line | |
| Apr 14, 2022 | Completed final sign-off Feb 2026 | 4040 20th St | Peter Harris Construction Inc | demo type 5, single story, private garage structure.Details
demo type 5, single story, private garage structure. | $10,000 |
| Apr 14, 2022 | Completed final sign-off Feb 2026 | 4040 20th St | Peter Harris Construction Inc | sb9 application: construct new 3 story over 1 basement, type 5, two family dwelling per sb9(senate bill 9). upper unit with 3 bedroom 2.5 bathrooms & roof deck. 2nd unit: 2 bedroom and 2 bathrooms.Details
sb9 application: construct new 3 story over 1 basement, type 5, two family dwelling per sb9(senate bill 9). upper unit with 3 bedroom 2.5 bathrooms & roof deck. 2nd unit: 2 bedroom and 2 bathrooms. | $757,609 |
| Mar 23, 2022 | Expired or cancelled cancelled Jan 2026 | 4040 20th St | remove (e) slab on grade & footings, lower grade. replace slab on grade and footings. replace garage door w/in (e) openings.Details
remove (e) slab on grade & footings, lower grade. replace slab on grade and footings. replace garage door w/in (e) openings. | $50,000 | |
| Feb 15, 2022 | Completed final sign-off Jul 2022 | 789 Carolina St | P-T Group Inc | install new fire sprinkler system at ground floor. new adu per nfpa 13. connect to existing fire service. install new backflow preventer (total sprinklers 11). ref 201006104263 (underground/meter existing)Details
install new fire sprinkler system at ground floor. new adu per nfpa 13. connect to existing fire service. install new backflow preventer (total sprinklers 11). ref 201006104263 (underground/meter existing) | $6,006 |
| Nov 12, 2021 | Completed final sign-off Apr 2023 | 1830 Jackson St | Muldoon Construction Inc | unit i: revision to pa# 202106182776. add additional 78 sqft to unit i. revise layout of bath & bed #1. revise layout to bed #2.Details
unit i: revision to pa# 202106182776. add additional 78 sqft to unit i. revise layout of bath & bed #1. revise layout to bed #2. | $1,000 |
| Nov 1, 2021 | Completed final sign-off May 2024 | 4034 20th St | Peter Harris Construction Inc | addition of a new accessory dwelling unit (4034b) within new single family home. new sfh construction under separate permit #202110019688. no exterior work proposed. site permit: noDetails
addition of a new accessory dwelling unit (4034b) within new single family home. new sfh construction under separate permit #202110019688. no exterior work proposed. site permit: no | $385,171 |
| Oct 1, 2021 | Completed final sign-off Aug 2024 | 4034 20th St | Peter Harris Construction Inc | bldg a: construction of new 3-story over basement, type vb, single family dwelling (with adu to be under separate permit). demo permit under pa# 202104269349.Details
bldg a: construction of new 3-story over basement, type vb, single family dwelling (with adu to be under separate permit). demo permit under pa# 202104269349. | $600,347 |
| Oct 1, 2021 | Completed final sign-off May 2024 | 4034 20th St | Peter Harris Construction Inc | bldg b: construction of new 3-story over basement, type vb, single family dwelling (with adu to be under separate permit). demo permit under pa# 202104269349.Details
bldg b: construction of new 3-story over basement, type vb, single family dwelling (with adu to be under separate permit). demo permit under pa# 202104269349. | $504,566 |
| Jul 26, 2021 | Never finaled issued Mar 2023, no final | 120 Seneca Av | sb9 - add 3-story adddition at rear of an (e) house. (e) unit will occupy 2nd & 3rd floor of the addition as well as roof deck. addition to unit #1 is approx. 1095 sqft & contains 3 bedroom, 3 bathroom, stair & roof deck. 2nd unit per sb9 of 1190 sqft added to 1st floor. 722 sqft of new constructionDetails
sb9 - add 3-story adddition at rear of an (e) house. (e) unit will occupy 2nd & 3rd floor of the addition as well as roof deck. addition to unit #1 is approx. 1095 sqft & contains 3 bedroom, 3 bathroom, stair & roof deck. 2nd unit per sb9 of 1190 sqft added to 1st floor. 722 sqft of new construction | $350,000 | |
| Jun 18, 2021 | Completed final sign-off Apr 2023 | 1830 Jackson St | Muldoon Construction Inc | unit i: remodel/enlargement by incorporating (e) storage space, addition of (1) bathroom & (1) bedroom, remodel (e) bathroom & (e) kitchen, replace two windows facing court.Details
unit i: remodel/enlargement by incorporating (e) storage space, addition of (1) bathroom & (1) bedroom, remodel (e) bathroom & (e) kitchen, replace two windows facing court. | $200,000 |
| Jun 14, 2021 | Completed final sign-off May 2022 | 4042 20th St | Seth Bernstein | revision to 202006128494 enlarge approved adu relocate kitchen to expanded area. rough in for future bedroomDetails
revision to 202006128494 enlarge approved adu relocate kitchen to expanded area. rough in for future bedroom | $10,000 |
| Apr 26, 2021 | Completed final sign-off Apr 2022 | 4034 20th St | Peter Harris Construction Inc | demolition of a type 5 2 story r-2 apartmentDetails
demolition of a type 5 2 story r-2 apartment | $25,000 |
| Nov 17, 2020 | Completed final sign-off May 2022 | 4042 20th St | Seth Bernstein | replace front stairs in kind. remodel kitchen. remodel bathrooms on 2nd & 3rd fl. add bathroom on 3rd fl. remove fireplace. replace windows (not visible from street). increase openiing between living & dining room. relocate laundry. adu at gnd fl under pa 202006128494.Details
replace front stairs in kind. remodel kitchen. remodel bathrooms on 2nd & 3rd fl. add bathroom on 3rd fl. remove fireplace. replace windows (not visible from street). increase openiing between living & dining room. relocate laundry. adu at gnd fl under pa 202006128494. | $50,000 |
| Nov 16, 2020 | Completed final sign-off Aug 2021 | 1837 Oak St | Casman Construction Inc | revision to app#201711295016. relocate the boilerDetails
revision to app#201711295016. relocate the boiler | $10,000 |
| Sep 23, 2020 | Completed final sign-off Dec 2021 | 101 Sanchez St | Muldoon Construction Inc | remodel apt 785. remove wall at kitchen, add wall to create study, add lav at toilet roomDetails
remodel apt 785. remove wall at kitchen, add wall to create study, add lav at toilet room | $100,000 |
| Sep 23, 2020 | Completed final sign-off Sep 2021 | 1830 Jackson St | Muldoon Construction Inc | remodel apt b: replace kitchen and bath fixtures and finishes. add half bath. remove wall between living and dining rooms. replace windows in kind. not visible from street. add laundry room. remodel closet.Details
remodel apt b: replace kitchen and bath fixtures and finishes. add half bath. remove wall between living and dining rooms. replace windows in kind. not visible from street. add laundry room. remodel closet. | $150,000 |
| Jun 26, 2020 | Completed final sign-off Sep 2020 | 655 Kansas St | Doherty Restoration, Inc. | add interior wall to create bedroom, replace kitchen appliance and cabinets. replace bathroom fixtures and add 2 skylights.Details
add interior wall to create bedroom, replace kitchen appliance and cabinets. replace bathroom fixtures and add 2 skylights. | $30,000 |
| Jun 12, 2020 | Completed final sign-off May 2022 | 4042 20th St | Peter Harris Construction Inc, Seth Bernstein | add adu per ordinance 95-17 at ground level with one bedroom and one bathroom. replace windows at front and back, add entry door. eliminate interior stair. add 6' metal fence and gate at property line 80% open. rebuild existing front stairs. relocate gas and electric meters.Details
add adu per ordinance 95-17 at ground level with one bedroom and one bathroom. replace windows at front and back, add entry door. eliminate interior stair. add 6' metal fence and gate at property line 80% open. rebuild existing front stairs. relocate gas and electric meters. | $80,000 |
| Mar 12, 2020 | Completed final sign-off Jan 2021 | 3360 20th St | R J M Properties | ti add private office and unisex bathroom and counter with sink & dishwasher.Details
ti add private office and unisex bathroom and counter with sink & dishwasher. | $25,000 |
| Dec 6, 2019 | Completed final sign-off Aug 2022 | 3150 18th St | change of use of 34 workshops from f-1 to b (personal service) pursuant to planning code sec. 192. no work under this permit. note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5.Details
change of use of 34 workshops from f-1 to b (personal service) pursuant to planning code sec. 192. no work under this permit. note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5. | ||
| Dec 6, 2019 | Completed final sign-off Sep 2022 | 3150 18th St | change of use of 17 workshops from f-1 to b (office use) pursuant to planning code sec. 192. no work under this permit. note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5.Details
change of use of 17 workshops from f-1 to b (office use) pursuant to planning code sec. 192. no work under this permit. note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5. | ||
| Dec 6, 2019 | Completed final sign-off Sep 2022 | 3150 18th St | change of use of 25 workshops from f-1 to b (health service) pursuant to planning code sec. 192. no work under this permit. note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5.Details
change of use of 25 workshops from f-1 to b (health service) pursuant to planning code sec. 192. no work under this permit. note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5. | ||
| Dec 6, 2019 | Never finaled filed Dec 2019, never issued | 3150 18th St | change of use of 5,000 sq ft from f-1 to b (health service). note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5.Details
change of use of 5,000 sq ft from f-1 to b (health service). note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5. | ||
| Dec 6, 2019 | Completed final sign-off Sep 2022 | 3150 18th St | change of use of (14) worshops from f-1 to b (massage facilities) pursuant to planning code sec 192. note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5.Details
change of use of (14) worshops from f-1 to b (massage facilities) pursuant to planning code sec 192. note: change of use and/or occupancy shall comply w/2016 cbc, chapter-5. | ||
| Dec 3, 2019 | Completed final sign-off Mar 2020 | 101 Sanchez St | West Peak Construction | #105: interior remodel, kitchen, bathroom, add closet & open wall. install washer & dryer.Details
#105: interior remodel, kitchen, bathroom, add closet & open wall. install washer & dryer. | $50,000 |
| Oct 17, 2019 | Completed final sign-off Jan 2021 | 1830 Jackson St | Muldoon Construction Inc | replace windows, in kind. not visible from street only. interior remodel including 3 kitchens & 9 bathrooms. int walls added. new heating system. fire alarm under sep permit. street visible windows under pa 201910174874.Details
replace windows, in kind. not visible from street only. interior remodel including 3 kitchens & 9 bathrooms. int walls added. new heating system. fire alarm under sep permit. street visible windows under pa 201910174874. | $450,000 |
| Aug 27, 2019 | Completed final sign-off Nov 2019 | 240 Chattanooga St | Flanagan Construction | revision to app#201607071765 r-5 no change of material, only configuration of ground level front windows and extend portion of wall at entry.Details
revision to app#201607071765 r-5 no change of material, only configuration of ground level front windows and extend portion of wall at entry. | |
| Jun 14, 2019 | Never finaled filed Jun 2019, never issued | 1801 Haight St | erect a new 4 story bldg with 1 basment with 7 dwelling apartment and commercial type 5aDetails
erect a new 4 story bldg with 1 basment with 7 dwelling apartment and commercial type 5a | $1,000,000 | |
| Jun 12, 2019 | Expired or cancelled withdrawn Sep 2022 | 3150 18th St | administrative permit. memorialize pa#2007/0430/9994,changing workspaces from b to f1(finaled under bpa# 2008/011/52552).originally constructed under bpa# 2004/0521/4487 and permit t.i. work to create a work space from portion of commercial space to ground flDetails
administrative permit. memorialize pa#2007/0430/9994,changing workspaces from b to f1(finaled under bpa# 2008/011/52552).originally constructed under bpa# 2004/0521/4487 and permit t.i. work to create a work space from portion of commercial space to ground fl | ||
| May 17, 2019 | Expired or cancelled cancelled Nov 2022 | 2199 Pacific Av | add one adu w/ one bedroom. remove parking spaces in garage per ordinance 162-16.Details
add one adu w/ one bedroom. remove parking spaces in garage per ordinance 162-16. | $150,000 | |
| Mar 28, 2019 | Completed final sign-off Dec 2019 | 240 Chattanooga St | Speedy Construction Inc | add (1) adu. studio with (1) bathroom per ord #162-16. (6) adus added under appln #201607671765Details
add (1) adu. studio with (1) bathroom per ord #162-16. (6) adus added under appln #201607671765 | $75,000 |
| Mar 11, 2019 | Completed final sign-off Sep 2022 | 789 Carolina St | G M Building And Construction Inc, Aaron Hirschfeld | add adu per ordinance 162-16 studio on ground levelDetails
add adu per ordinance 162-16 studio on ground level | $80,000 |
| Oct 31, 2018 | Expired or cancelled cancelled Jan 2026 | 1606 Jones St | revision to app#201802141248. ab05 to install sprinklers instead of 45 min. protected opening. n/a for maherDetails
revision to app#201802141248. ab05 to install sprinklers instead of 45 min. protected opening. n/a for maher | ||
| Oct 31, 2018 | Completed final sign-off Dec 2019 | 240 Chattanooga St | Mendez-Ortiz Contractors | revision to app#201607071765. add bedroom and 1/2 bath to unit #34Details
revision to app#201607071765. add bedroom and 1/2 bath to unit #34 | $30,000 |
| Oct 26, 2018 | Completed final sign-off Mar 2021 | 740 Rhode Island St | Cannon General Contracting Inc | add two adu's on ground level. studios w/ one kitchen & one bath each per ord# 162-16.Details
add two adu's on ground level. studios w/ one kitchen & one bath each per ord# 162-16. | $175,000 |
| Oct 17, 2018 | Completed final sign-off Jan 2020 | 655 Kansas St | Doherty Restoration, Inc. | add new adu, one new bath and kitchen at ground floor, per ordinance 162-16 (4 adu's under #201703010446)Details
add new adu, one new bath and kitchen at ground floor, per ordinance 162-16 (4 adu's under #201703010446) | $50,000 |
| Oct 12, 2018 | Completed final sign-off May 2019 | 655 Kansas St | Doherty Restoration, Inc. | revision to app#201703010446 r1 adu occupancy to add construction details per building inspector.Details
revision to app#201703010446 r1 adu occupancy to add construction details per building inspector. | |
| Sep 24, 2018 | Completed final sign-off Jun 2019 | 3169 California St | revision to building permit #2018/0105/7962 within existing space to add bathroom and create bedroom.Details
revision to building permit #2018/0105/7962 within existing space to add bathroom and create bedroom. | $15,000 | |
| Apr 13, 2018 | Expired or cancelled cancelled Oct 2022 | 2345 Larkin St | add (3) bedroom, (3) bathroom adu per ordinance no. 162-16. add windows to north, south, west elevations. no work visible from larkin st. structural work done under #2017-0915-8355.Details
add (3) bedroom, (3) bathroom adu per ordinance no. 162-16. add windows to north, south, west elevations. no work visible from larkin st. structural work done under #2017-0915-8355. | $150,000 | |
| Mar 30, 2018 | Never finaled issued Nov 2018, no final | 250 Tocoloma Av | add adu at 1st fl with one bath and one kitchen per ordinance 95-17. replace existing slab on grade. replace existing 3'retaining wall and footing in kind. comply with notice of violation #201647216Details
add adu at 1st fl with one bath and one kitchen per ordinance 95-17. replace existing slab on grade. replace existing 3'retaining wall and footing in kind. comply with notice of violation #201647216 | $50,000 | |
| Nov 29, 2017 | Completed final sign-off Aug 2021 | 1837 Oak St | Casman Construction Inc | add (2) ground level adu's per ordinance 162-16. add windows facing oak st & at lightwell. structural work under soft story permit #2017-0906-6957. sprinkler and fire alarm on deferred submittals.Details
add (2) ground level adu's per ordinance 162-16. add windows facing oak st & at lightwell. structural work under soft story permit #2017-0906-6957. sprinkler and fire alarm on deferred submittals. | $150,000 |
| Nov 28, 2017 | Completed final sign-off Jul 2020 | 2201 California St | Sean M O'reilly | add adu at g/f of approx. 375 sq.ft. per ordinance 162-16. add windows at (e) openings on california street. new unit and exit path to have sprinklers and fire alarm under seperate permit. soft story work under pa#201612094595Details
add adu at g/f of approx. 375 sq.ft. per ordinance 162-16. add windows at (e) openings on california street. new unit and exit path to have sprinklers and fire alarm under seperate permit. soft story work under pa#201612094595 | $50,000 |
| Oct 16, 2017 | Never finaled issued Oct 2018, no final | 240 Carl St | raise roof over (e) kitchen, remodel kitchen, extend building in north-east lower on 2/f & 3/f. reconfigure ground level stair at rear.Details
raise roof over (e) kitchen, remodel kitchen, extend building in north-east lower on 2/f & 3/f. reconfigure ground level stair at rear. | $75,000 | |
| Oct 5, 2017 | Completed final sign-off May 2019 | 101 Sanchez St | P Jordan Builders Inc | #109, 783, 797- interior remodeling. #797: remodel kitchen and bathroom. add wall to create study room. #783: remodel kitchen and bathroom, add new bathroom, remove wall and add beam. #109: remodel bathroom and kitchen, remove wall and add beamDetails
#109, 783, 797- interior remodeling. #797: remodel kitchen and bathroom. add wall to create study room. #783: remodel kitchen and bathroom, add new bathroom, remove wall and add beam. #109: remodel bathroom and kitchen, remove wall and add beam | $75,000 |
| Aug 21, 2017 | Never finaled issued Aug 2017, no final | 2764 Golden Gate Av | M H M Construction | interior remodel of existing kitchen, living rm, and bath to create new bedroom on street side. move wall to enlarge kitchen. no exterior work under this permitDetails
interior remodel of existing kitchen, living rm, and bath to create new bedroom on street side. move wall to enlarge kitchen. no exterior work under this permit | $30,000 |
| Apr 28, 2017 | Completed final sign-off Dec 2018 | 644 Natoma St | P Jordan Builders Inc | add (3) units under adu legislation on ground. each unit w/ kitchen & bath as per ord #162-16. (n) windows front & rear, (n) stair to lower level, refer to permit #201704194295Details
add (3) units under adu legislation on ground. each unit w/ kitchen & bath as per ord #162-16. (n) windows front & rear, (n) stair to lower level, refer to permit #201704194295 | $100,000 |
| Mar 1, 2017 | Completed final sign-off Apr 2018 | 600 Stanyan St | change designation of apartment #108 to as conforming from non-conforming unit. for administrative purposes only, no construction work. n/a for maher ordinance no.155-13Details
change designation of apartment #108 to as conforming from non-conforming unit. for administrative purposes only, no construction work. n/a for maher ordinance no.155-13 | ||
| Jan 17, 2017 | Completed final sign-off Aug 2026 | 5 Santa Rosa Av | Ac And Company, L H Gao Construction Inc. | create 3(n) dwelling units, conversion of(e) office & storage on 2/f to make 6-unit bldg. (n) windows on mission st. new roof deck. nfpa-13 sprinkler & voluntary alarm deferred. 3rd fl work w/o permit to be removed. ref pa#201703010437Details
create 3(n) dwelling units, conversion of(e) office & storage on 2/f to make 6-unit bldg. (n) windows on mission st. new roof deck. nfpa-13 sprinkler & voluntary alarm deferred. 3rd fl work w/o permit to be removed. ref pa#201703010437 | $100,000 |
| Nov 2, 2016 | Completed final sign-off Aug 2018 | 3053 Turk St | Stephenson Construction Co, Aaron Hirschfeld | removing 2 car garage to convert to one new dwelling unit (10 units total) as per ordinance 162-16 there will be 2 new windows facing the entry, 1 bath, 1 kitchen. revision to permit #2015-1218-5561 (7 to 10 units).Details
removing 2 car garage to convert to one new dwelling unit (10 units total) as per ordinance 162-16 there will be 2 new windows facing the entry, 1 bath, 1 kitchen. revision to permit #2015-1218-5561 (7 to 10 units). | $25,000 |
| Oct 14, 2016 | Completed final sign-off May 2019 | 101 Sanchez St | P Jordan Builders Inc | 3 new units at gound level. new windows at front and rear elevations. new excavation work at new units. adu w/ soft story 201608084468. ** maher: n/a **Details
3 new units at gound level. new windows at front and rear elevations. new excavation work at new units. adu w/ soft story 201608084468. ** maher: n/a ** | $50,000 |
| Aug 18, 2016 | Completed final sign-off Apr 2018 | 600 Stanyan St | Cannon General Contracting Inc | #108 -scope includes remodel kitchen/living room and new partitions at 2nd flr. 4 new windows @ sideyard,1 new door & window @ courtyard & add crawl space on 1st floor with new partitions bedrooms, bathrooms, heating & electrical. nw spiral stair connects both levels internally. egress unaffected.Details
#108 -scope includes remodel kitchen/living room and new partitions at 2nd flr. 4 new windows @ sideyard,1 new door & window @ courtyard & add crawl space on 1st floor with new partitions bedrooms, bathrooms, heating & electrical. nw spiral stair connects both levels internally. egress unaffected. | $75,000 |
| Jul 7, 2016 | Completed final sign-off Dec 2019 | 240 Chattanooga St | Mendez-Ortiz Contractors | addition of 6 units under ord# 30-15 within the (e) building envelope. work include 6 kitchen & 10 bathroom. 11 bedrooms. soft story pa# 2016/06/09/9515.Details
addition of 6 units under ord# 30-15 within the (e) building envelope. work include 6 kitchen & 10 bathroom. 11 bedrooms. soft story pa# 2016/06/09/9515. | $750,000 |
| Mar 29, 2016 | Completed final sign-off Dec 2017 | 1500 Mcallister St | Lewis M Merlo Inc, Stephenson Construction Co | alter (e) lower passange way to include new gas room, elec/utilities room, trash room. locating sprinkler main & fire dept. hook-ups, new rated walls framing, excave & foundation work provided, exterior work is pg&e and fire dept. requirements. fire sprinklers to be nfpa 13r under seperate.Details
alter (e) lower passange way to include new gas room, elec/utilities room, trash room. locating sprinkler main & fire dept. hook-ups, new rated walls framing, excave & foundation work provided, exterior work is pg&e and fire dept. requirements. fire sprinklers to be nfpa 13r under seperate. | $50,000 |
| Mar 22, 2016 | Never finaled issued Apr 2016, no final | 716 Wisconsin St | Madero's Construction | revision to ref pa 2013 1107 1400: replace wood planters at front stairs with metal planters.Details
revision to ref pa 2013 1107 1400: replace wood planters at front stairs with metal planters. | $500 |
| Mar 3, 2016 | Completed final sign-off Aug 2017 | 1500 Mcallister St | Todd Morris Fire Protection Inc. | fully sprinkler 4 story building (residential) per nfpa 13 2013 including attic. dedicated underground included per nfpa 24 2013. referenced pa#2015-11-30-3685-addition of 1 unit, pa#2015-07-31-3037-repair fire damage.Details
fully sprinkler 4 story building (residential) per nfpa 13 2013 including attic. dedicated underground included per nfpa 24 2013. referenced pa#2015-11-30-3685-addition of 1 unit, pa#2015-07-31-3037-repair fire damage. | $100,000 |
| Feb 18, 2016 | Completed final sign-off May 2018 | 600 Stanyan St | Cannon's Gen. Constracting | work on 1/f only to include demo non bearing construction, add new corridor, close off (e) stair #1, alter stair #2, enclose (e) elec. between elec/storage and corridor, new exterior exit door and level landing, fire rated walls where indicated. n/a ordinance #155-13Details
work on 1/f only to include demo non bearing construction, add new corridor, close off (e) stair #1, alter stair #2, enclose (e) elec. between elec/storage and corridor, new exterior exit door and level landing, fire rated walls where indicated. n/a ordinance #155-13 | $40,000 |
| Feb 3, 2016 | Completed final sign-off Jun 2018 | 1445 Mason St | Doherty Restoration, Inc. | (with soft story ref pa# 201602038770): add 3 residential units at ground fl (per ord 30-15) include new partitions, bedrooms, bathroms, & kitchens. add 1 new window assembly at front east elevation; add new windows at rear of bld for new units. new rated corridor and stair. life safety deferredDetails
(with soft story ref pa# 201602038770): add 3 residential units at ground fl (per ord 30-15) include new partitions, bedrooms, bathroms, & kitchens. add 1 new window assembly at front east elevation; add new windows at rear of bld for new units. new rated corridor and stair. life safety deferred | $250,000 |
| Feb 3, 2016 | Completed final sign-off Mar 2018 | 1445 Mason St | soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. mandatory seismic retrofit at first floor of bld.Details
soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. mandatory seismic retrofit at first floor of bld. | $75,000 | |
| Feb 1, 2016 | Completed final sign-off Jun 2016 | 946 Ashbury St | revision to pa 2015-1030-1334 & 2015-0303-9844 - omitt west facing skylights, omit work under dormer and guardrail at front stair to remain as is.Details
revision to pa 2015-1030-1334 & 2015-0303-9844 - omitt west facing skylights, omit work under dormer and guardrail at front stair to remain as is. | ||
| Nov 4, 2015 | Expired or cancelled expired Sep 2017 | 101 Sanchez St | P Jordan Builders Inc | residential t.i. @ 3 apartments: #102 -1/f & #301 & 305- 3/f, interior work only. scope includes remodel of kitchens, bathrooms and minor relocation of interior partitions. n/a ordinance #155-13Details
residential t.i. @ 3 apartments: #102 -1/f & #301 & 305- 3/f, interior work only. scope includes remodel of kitchens, bathrooms and minor relocation of interior partitions. n/a ordinance #155-13 | $60,000 |
| Oct 30, 2015 | Completed final sign-off Jul 2016 | 946 Ashbury St | Peter Harris Construction Inc | interior remodeling at 3rd floor level including 2 skylights at family room(not visible from the street), 2 new windows at rear elevation, 1 new window at extg location at extg dormer at property line, move interior partitions and doors at 3rd floor.Details
interior remodeling at 3rd floor level including 2 skylights at family room(not visible from the street), 2 new windows at rear elevation, 1 new window at extg location at extg dormer at property line, move interior partitions and doors at 3rd floor. | $10,000 |
| Oct 20, 2015 | Expired or cancelled expired Mar 2026 | 600 Stanyan St | Cannon General Contracting Inc, Stephenson Construction Co | add 3(n)dwelling units @ ground fl (per ord #30-15). add 10(n)windows @ east elevation & 4 @ west elevation (street facing). each unit to include bathrooms, kitchen, washer/dryer & relocation of walls. soft story permit #201407221816. sprinklers and alarms under separate permit. ** maher: n/a **Details
add 3(n)dwelling units @ ground fl (per ord #30-15). add 10(n)windows @ east elevation & 4 @ west elevation (street facing). each unit to include bathrooms, kitchen, washer/dryer & relocation of walls. soft story permit #201407221816. sprinklers and alarms under separate permit. ** maher: n/a ** | $300,000 |
| Sep 17, 2015 | Completed final sign-off Apr 2017 | 317 Los Palmos Dr | Custom 6 Builders | 1/f: relocation of walls, new bedroom, bathroom and closets, new exterior deck and door assembly, new windows @ new bathroom. 2/f: remodel kitchen and add a window @ kitchen area.Details
1/f: relocation of walls, new bedroom, bathroom and closets, new exterior deck and door assembly, new windows @ new bathroom. 2/f: remodel kitchen and add a window @ kitchen area. | $120,000 |
| Jul 31, 2015 | Completed final sign-off Dec 2017 | 1500 Mcallister St | Stephenson Construction Co | interior remodel at extg residential bldg, including moving interior walls. adding bathrooms in units 901, 1502b, 1504a and 1504b. moving kitchen in 901. all other bathrooms and kitchens are replacing fixtures and finishes. no changes to egress or unit footprints. all exterior work previously approvDetails
interior remodel at extg residential bldg, including moving interior walls. adding bathrooms in units 901, 1502b, 1504a and 1504b. moving kitchen in 901. all other bathrooms and kitchens are replacing fixtures and finishes. no changes to egress or unit footprints. all exterior work previously approv | $175,000 |
| Jun 30, 2015 | Completed final sign-off Mar 2018 | 200 Arguello Bl | P Jordan Builders Inc | new dwelling unit @ ground floor per ordinance# 30-15. new unit will include a new bath, kitchen & bedroom. all new electrical, mechanical, plumbing & lighting. 4 bicycle parking spaces added (3 for 3 removed car parking space. 1 for new dwelling) 3 new street trees added & a planter strip along theDetails
new dwelling unit @ ground floor per ordinance# 30-15. new unit will include a new bath, kitchen & bedroom. all new electrical, mechanical, plumbing & lighting. 4 bicycle parking spaces added (3 for 3 removed car parking space. 1 for new dwelling) 3 new street trees added & a planter strip along the | $75,000 |
| Jun 4, 2015 | Never finaled issued Jun 2015, no final | 1100 Sacramento St | unit 602 6th fl remodel baths, kitchen and non structural interior partitions. replace all windows at 602 in kindDetails
unit 602 6th fl remodel baths, kitchen and non structural interior partitions. replace all windows at 602 in kind | $300,000 | |
| Mar 3, 2015 | Completed final sign-off Aug 2015 | 3047 Divisadero St | Cannon's Gen. Constracting | revision to pa# 2013 0920 7405 adding structural drawingsDetails
revision to pa# 2013 0920 7405 adding structural drawings | |
| Mar 3, 2015 | Completed final sign-off Jun 2016 | 946 Ashbury St | Peter Harris Construction Inc | scope of work includes widening extg driveway, replacing extg retaining walls, replace extg garage door, refinish extg stair and handrail, replace extg dormer window and replace windows at side of dormer.Details
scope of work includes widening extg driveway, replacing extg retaining walls, replace extg garage door, refinish extg stair and handrail, replace extg dormer window and replace windows at side of dormer. | $20,000 |
| Jan 23, 2015 | Completed final sign-off Mar 2016 | 16 Coventry Ct | rev. to pa#201412294557, relocate bath on 1/f, replace foundation on south side of bldg, replace garage slab- repair/replace stucco for dry rot, hydronic heating system- move door at existing bathroom.Details
rev. to pa#201412294557, relocate bath on 1/f, replace foundation on south side of bldg, replace garage slab- repair/replace stucco for dry rot, hydronic heating system- move door at existing bathroom. | ||
| Jun 16, 2014 | Completed final sign-off Jul 2014 | 16 Coventry Ct | Peter Harris Construction Inc | replace existing deck as existing. no change to footprint.Details
replace existing deck as existing. no change to footprint. | $5,000 |
| Jun 5, 2014 | Completed final sign-off Jun 2014 | 491 Haight St | correct notice of special restriction to application # 2012.04.17.8530. maher n/a.Details
correct notice of special restriction to application # 2012.04.17.8530. maher n/a. | ||
| May 23, 2014 | Expired or cancelled withdrawn Oct 2014 | 837 Geary St | legalize ground floor unit. remodel kitchen, bathroom. replace windows, move interior non bearing walls. previously 2 units 1st fl were combinedDetails
legalize ground floor unit. remodel kitchen, bathroom. replace windows, move interior non bearing walls. previously 2 units 1st fl were combined | $20,000 |