Cannon General Contracting Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Jun 2025
- Last 24 months
- 1 permit filed
20 permits since 2000: 14 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2025 | Completed final sign-off Aug 2025 | 11 Perego Tr | all work in unit #4: 1 bathroom remodel, remove and replace all plumbing fixtures, cabinet, countertop and tile.Details
all work in unit #4: 1 bathroom remodel, remove and replace all plumbing fixtures, cabinet, countertop and tile. | $25,000 |
| Mar 5, 2024 | Completed final sign-off Feb 2025 | 1640 Scott St | removal of steel trellises on the second and third floorDetails
removal of steel trellises on the second and third floor | $8,000 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 1100 Sacramento St | unit 106: bathroom remodel: replace valves, tiles, cabinets, countertop and surface mount light fixtures.Details
unit 106: bathroom remodel: replace valves, tiles, cabinets, countertop and surface mount light fixtures. | $25,000 |
| Feb 17, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | unit 846: kitchen remodel, replace floor thru out, bathroom fixtures, electrical lighting. sheetrock and paintings, tile.Details
unit 846: kitchen remodel, replace floor thru out, bathroom fixtures, electrical lighting. sheetrock and paintings, tile. | $125,000 |
| Feb 17, 2023 | Completed final sign-off Jun 2023 | 119 Wilmot St | water damage repair, relace cabinet, electrical fixture countertops, hardwood flooring. repair deck. sheet rock, doors, trim and paint. throughout house, repair in kind. no changes to walls, use of rooms.Details
water damage repair, relace cabinet, electrical fixture countertops, hardwood flooring. repair deck. sheet rock, doors, trim and paint. throughout house, repair in kind. no changes to walls, use of rooms. | $90,000 |
| Mar 10, 2022 | Completed final sign-off May 2022 | 1100 Sacramento St | apt 110: bathrooom remodel, demo, replace tile. plumbing and light fixtures, paint.Details
apt 110: bathrooom remodel, demo, replace tile. plumbing and light fixtures, paint. | $30,000 |
| Dec 17, 2021 | Completed final sign-off May 2022 | 187 16th Av | kitchen remodel, remove and replace counters, remove and replace cabinets, upgrade electrical and install new appliance.Details
kitchen remodel, remove and replace counters, remove and replace cabinets, upgrade electrical and install new appliance. | $10,000 |
| Oct 14, 2020 | Never finaled issued Oct 2020, no final | 1100 Sacramento St | unit #708: cosmetic work, new fireplace mantel adding two cabinets. replacement of countertop trim light fixturesDetails
unit #708: cosmetic work, new fireplace mantel adding two cabinets. replacement of countertop trim light fixtures | $50,000 |
| Mar 4, 2019 | Completed final sign-off Apr 2019 | 357 Tehama St | suite # 4: upgrade kitchen: new cabinets and counter top. no structural work under this permit. no change in floor plan layouts.Details
suite # 4: upgrade kitchen: new cabinets and counter top. no structural work under this permit. no change in floor plan layouts. | $16,500 |
| Nov 28, 2018 | Completed final sign-off Sep 2025 | 145 Buchanan St | remodel (e) kitchen (150 sq. ft.) & (e) (2) bathrooms (30 sq. ft./20 sq. ft. respectively)Details
remodel (e) kitchen (150 sq. ft.) & (e) (2) bathrooms (30 sq. ft./20 sq. ft. respectively) | $80,000 |
| Oct 26, 2018 | Completed final sign-off Mar 2021 | 740 Rhode Island St | add two adu's on ground level. studios w/ one kitchen & one bath each per ord# 162-16.Details
add two adu's on ground level. studios w/ one kitchen & one bath each per ord# 162-16. | $175,000 |
| Jul 18, 2018 | Completed final sign-off Dec 2018 | 5160 Diamond Heights Bl | remodel of (e) bathroom. no framing or structural changes.Details
remodel of (e) bathroom. no framing or structural changes. | $38,000 |
| Apr 9, 2018 | Never finaled issued Apr 2018, no final | 600 Stanyan St | revision to 201510200259 in bedroom of apt 001 omit add operable 45 min window of fusible link as rescue window. omit windows on east side if livingDetails
revision to 201510200259 in bedroom of apt 001 omit add operable 45 min window of fusible link as rescue window. omit windows on east side if living | |
| Apr 3, 2018 | Completed final sign-off Feb 2019 | 720 Stockton St | no walls moved, removed, added, infilled, all layouts to remain, remodel of two bath rooms (guest/master) fixtures not to move. remodel of kitchen all appliances to stay in same location. sand refinish hardwood/paint electricalDetails
no walls moved, removed, added, infilled, all layouts to remain, remodel of two bath rooms (guest/master) fixtures not to move. remodel of kitchen all appliances to stay in same location. sand refinish hardwood/paint electrical | $155,000 |
| Apr 25, 2017 | Never finaled issued Apr 2017, no final | 955 Green St | unit #3: bathroom remodel, re-arrange tub, paint, and electric upgrades. refinish hardwood floors in unitDetails
unit #3: bathroom remodel, re-arrange tub, paint, and electric upgrades. refinish hardwood floors in unit | $85,000 |
| Mar 29, 2017 | Never finaled issued Apr 2017, no final | 1351 Plymouth Av | kitchen remodel, dining nook and add skylight in hallwayDetails
kitchen remodel, dining nook and add skylight in hallway | $105,000 |
| Dec 16, 2016 | Completed final sign-off Apr 2019 | 200 Guerrero St | provide (2)(n) accessory dwelling units @ (e) covered parking ports @ 1st fl persuant to ord #162-16. provide ten (10)(n) class "i" bicycle parking spaces @ basement. (n) units & meter room to be sprinklered under separate permits.Details
provide (2)(n) accessory dwelling units @ (e) covered parking ports @ 1st fl persuant to ord #162-16. provide ten (10)(n) class "i" bicycle parking spaces @ basement. (n) units & meter room to be sprinklered under separate permits. | $150,000 |
| Nov 2, 2016 | Completed final sign-off Apr 2018 | 600 Stanyan St | foundation replacement - new grade beam maher naDetails
foundation replacement - new grade beam maher na | $15,000 |
| Aug 18, 2016 | Completed final sign-off Apr 2018 | 600 Stanyan St | #108 -scope includes remodel kitchen/living room and new partitions at 2nd flr. 4 new windows @ sideyard,1 new door & window @ courtyard & add crawl space on 1st floor with new partitions bedrooms, bathrooms, heating & electrical. nw spiral stair connects both levels internally. egress unaffected.Details
#108 -scope includes remodel kitchen/living room and new partitions at 2nd flr. 4 new windows @ sideyard,1 new door & window @ courtyard & add crawl space on 1st floor with new partitions bedrooms, bathrooms, heating & electrical. nw spiral stair connects both levels internally. egress unaffected. | $75,000 |
| Oct 20, 2015 | Expired or cancelled expired Mar 2026 | 600 Stanyan St | add 3(n)dwelling units @ ground fl (per ord #30-15). add 10(n)windows @ east elevation & 4 @ west elevation (street facing). each unit to include bathrooms, kitchen, washer/dryer & relocation of walls. soft story permit #201407221816. sprinklers and alarms under separate permit. ** maher: n/a **Details
add 3(n)dwelling units @ ground fl (per ord #30-15). add 10(n)windows @ east elevation & 4 @ west elevation (street facing). each unit to include bathrooms, kitchen, washer/dryer & relocation of walls. soft story permit #201407221816. sprinklers and alarms under separate permit. ** maher: n/a ** | $300,000 |