Back to bathroom remodel contractors
Cannon General Contracting Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Jun 2025
- Last 24 months
- 1 permit filed
20 permits since 2000: 14 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 314 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2025 | Completed final sign-off Aug 2025 | 11 Perego Tr | all work in unit #4: 1 bathroom remodel, remove and replace all plumbing fixtures, cabinet, countertop and tile.Details
all work in unit #4: 1 bathroom remodel, remove and replace all plumbing fixtures, cabinet, countertop and tile. | $25,000 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 1100 Sacramento St | unit 106: bathroom remodel: replace valves, tiles, cabinets, countertop and surface mount light fixtures.Details
unit 106: bathroom remodel: replace valves, tiles, cabinets, countertop and surface mount light fixtures. | $25,000 |
| Feb 17, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | unit 846: kitchen remodel, replace floor thru out, bathroom fixtures, electrical lighting. sheetrock and paintings, tile.Details
unit 846: kitchen remodel, replace floor thru out, bathroom fixtures, electrical lighting. sheetrock and paintings, tile. | $125,000 |
| Nov 28, 2018 | Completed final sign-off Sep 2025 | 145 Buchanan St | remodel (e) kitchen (150 sq. ft.) & (e) (2) bathrooms (30 sq. ft./20 sq. ft. respectively)Details
remodel (e) kitchen (150 sq. ft.) & (e) (2) bathrooms (30 sq. ft./20 sq. ft. respectively) | $80,000 |
| Oct 26, 2018 | Completed final sign-off Mar 2021 | 740 Rhode Island St | add two adu's on ground level. studios w/ one kitchen & one bath each per ord# 162-16.Details
add two adu's on ground level. studios w/ one kitchen & one bath each per ord# 162-16. | $175,000 |
| Jul 18, 2018 | Completed final sign-off Dec 2018 | 5160 Diamond Heights Bl | remodel of (e) bathroom. no framing or structural changes.Details
remodel of (e) bathroom. no framing or structural changes. | $38,000 |
| Apr 3, 2018 | Completed final sign-off Feb 2019 | 720 Stockton St | no walls moved, removed, added, infilled, all layouts to remain, remodel of two bath rooms (guest/master) fixtures not to move. remodel of kitchen all appliances to stay in same location. sand refinish hardwood/paint electricalDetails
no walls moved, removed, added, infilled, all layouts to remain, remodel of two bath rooms (guest/master) fixtures not to move. remodel of kitchen all appliances to stay in same location. sand refinish hardwood/paint electrical | $155,000 |
| Apr 25, 2017 | Never finaled issued Apr 2017, no final | 955 Green St | unit #3: bathroom remodel, re-arrange tub, paint, and electric upgrades. refinish hardwood floors in unitDetails
unit #3: bathroom remodel, re-arrange tub, paint, and electric upgrades. refinish hardwood floors in unit | $85,000 |
| Aug 18, 2016 | Completed final sign-off Apr 2018 | 600 Stanyan St | #108 -scope includes remodel kitchen/living room and new partitions at 2nd flr. 4 new windows @ sideyard,1 new door & window @ courtyard & add crawl space on 1st floor with new partitions bedrooms, bathrooms, heating & electrical. nw spiral stair connects both levels internally. egress unaffected.Details
#108 -scope includes remodel kitchen/living room and new partitions at 2nd flr. 4 new windows @ sideyard,1 new door & window @ courtyard & add crawl space on 1st floor with new partitions bedrooms, bathrooms, heating & electrical. nw spiral stair connects both levels internally. egress unaffected. | $75,000 |
| Oct 20, 2015 | Expired or cancelled expired Mar 2026 | 600 Stanyan St | add 3(n)dwelling units @ ground fl (per ord #30-15). add 10(n)windows @ east elevation & 4 @ west elevation (street facing). each unit to include bathrooms, kitchen, washer/dryer & relocation of walls. soft story permit #201407221816. sprinklers and alarms under separate permit. ** maher: n/a **Details
add 3(n)dwelling units @ ground fl (per ord #30-15). add 10(n)windows @ east elevation & 4 @ west elevation (street facing). each unit to include bathrooms, kitchen, washer/dryer & relocation of walls. soft story permit #201407221816. sprinklers and alarms under separate permit. ** maher: n/a ** | $300,000 |