Block 0666, lot 030
1661 Pine St
- City’s use
- Multi-Family Residential
- Built
- 1997
- Units
- 250
- Building
- 524,271 sq ft
- Lot
- 46,170 sq ft
- Zoning
- RC4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit1045-remove and replace(e)kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switchDetails
unit1045-remove and replace(e)kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switch | $86,500 |
| Sep 10, 2026 | In progress issued Sep 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit1019-remove and replace (e) kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switchDetails
unit1019-remove and replace (e) kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switch | $72,000 |
| Aug 14, 2026 | In progress issued Sep 2026 | 1661 Pine St | Mc Carthy Building Companies Inc | removal & patchback of drywall for installation of in-wall fire alarm infrastructure. drywall to be patched back in kind. no modifications to (e) wall type or layout. fire alarm work carried under separate pa#202310168673.Details
removal & patchback of drywall for installation of in-wall fire alarm infrastructure. drywall to be patched back in kind. no modifications to (e) wall type or layout. fire alarm work carried under separate pa#202310168673. | $702,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 618: remove and replace kitchen cabinets, vanity cabinets in kind, replace electrical sub panel 125 amps, install new ceramic tiles and plumbing fixtures in kind. no wall moving. 1 bathroom and 1 kitchen remodel. no tub conversions.Details
unit 618: remove and replace kitchen cabinets, vanity cabinets in kind, replace electrical sub panel 125 amps, install new ceramic tiles and plumbing fixtures in kind. no wall moving. 1 bathroom and 1 kitchen remodel. no tub conversions. | $75,000 |
| Jun 18, 2026 | Completed final sign-off Aug 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 315 - remodel bath in-kind. new plumbing fixtures in-kind kitchen remodel in-kind. replace existing panel w/new 125 amp panel. new cabinets & tile in-kindDetails
unit 315 - remodel bath in-kind. new plumbing fixtures in-kind kitchen remodel in-kind. replace existing panel w/new 125 amp panel. new cabinets & tile in-kind | $72,000 |
| May 29, 2026 | Completed final sign-off Aug 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 1014: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 1 bath remodel in kind. kitchen remodel in kind. (no work in sleeping area)Details
unit 1014: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 1 bath remodel in kind. kitchen remodel in kind. (no work in sleeping area) | $72,000 |
| May 29, 2026 | Completed final sign-off Sep 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 1013: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 2 baths remodel in kind. kitchen remodel in kind. (no work in sleeping area)Details
unit 1013: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 2 baths remodel in kind. kitchen remodel in kind. (no work in sleeping area) | $92,000 |
| May 5, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 512: 1 kitchen and 1 bathroom remodel, new kitchen cabinets, replace existing subpanel 125 amps. install new ceramic tiles, new shower valves in bathroom. no wall moving.Details
unit 512: 1 kitchen and 1 bathroom remodel, new kitchen cabinets, replace existing subpanel 125 amps. install new ceramic tiles, new shower valves in bathroom. no wall moving. | $72,000 |
| Apr 13, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 316: remove and replace existing kitchen and vanity cabinets in kind. electric panel to be replaced w 125 amp panel. new ceramic tile and plumbing fixtures. no wall changes. 1 bath remodel in kind. kitchen remodel in kind.Details
unit 316: remove and replace existing kitchen and vanity cabinets in kind. electric panel to be replaced w 125 amp panel. new ceramic tile and plumbing fixtures. no wall changes. 1 bath remodel in kind. kitchen remodel in kind. | $82,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | #1341: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 2.5 bath remodel in kind. kitchen remodel in kind.Details
#1341: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 2.5 bath remodel in kind. kitchen remodel in kind. | $89,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | #327: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 1.5 bath remodel in kind. kitchen remodel in kind.Details
#327: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 1.5 bath remodel in kind. kitchen remodel in kind. | $70,000 |
| Jan 23, 2026 | Completed final sign-off Apr 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 933: remove and replace kitchen and vanity cabinets in kind, replace electrical panel with 125 amp panel, install new tiles and plumbing fixtures in bathrooms. 1 bathroom and 1 kitchen remodel. no change in plumbing fixture count.Details
unit 933: remove and replace kitchen and vanity cabinets in kind, replace electrical panel with 125 amp panel, install new tiles and plumbing fixtures in bathrooms. 1 bathroom and 1 kitchen remodel. no change in plumbing fixture count. | $89,000 |
| Jan 23, 2026 | Completed final sign-off Apr 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 1136: remove and replace kitchen and vanity cabinets, in kind, existing electrical panel to be replaced 125 amps. install new tiles and plumbing fixtures, bathroom, no wall moving, 2 bath remodels and 1 kitchen remodel.Details
unit 1136: remove and replace kitchen and vanity cabinets, in kind, existing electrical panel to be replaced 125 amps. install new tiles and plumbing fixtures, bathroom, no wall moving, 2 bath remodels and 1 kitchen remodel. | $89,000 |
| Dec 8, 2025 | Completed final sign-off Feb 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit # 1034: remove (e) kitchen + vanity cabs, replace in kind. replace (e) elec panel w/ new 125 amp panel. install new ceramic tile + plumbing fixtures. no wall moving. replace (e) shower w/ new ceramic tile shower. one kitchen remodel in kind. all (e) accessiblity features to remain.Details
unit # 1034: remove (e) kitchen + vanity cabs, replace in kind. replace (e) elec panel w/ new 125 amp panel. install new ceramic tile + plumbing fixtures. no wall moving. replace (e) shower w/ new ceramic tile shower. one kitchen remodel in kind. all (e) accessiblity features to remain. | $84,900 |
| Nov 13, 2025 | Expired or cancelled withdrawn Dec 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit# 1034: kitchen remodel with cabinets replaced inkind & bathroom remodel- tub to shower, install ceramic tile & plumbing fixtures. changing electrical panel to 125amp.Details
unit# 1034: kitchen remodel with cabinets replaced inkind & bathroom remodel- tub to shower, install ceramic tile & plumbing fixtures. changing electrical panel to 125amp. | $84,000 |
| Sep 24, 2025 | Completed final sign-off Mar 2026 | 1661 Pine St | Tech Home Inc | units al 6, al 7, al 8, al 9, and mezzanine lobby: water leak caused carpet demo, drywall demo, and insullation demo. to rebuild drywall hang and tape, insullation, prime, and paint, floor and baseboard, kitchen, office, storage room, salon, massage room.Details
units al 6, al 7, al 8, al 9, and mezzanine lobby: water leak caused carpet demo, drywall demo, and insullation demo. to rebuild drywall hang and tape, insullation, prime, and paint, floor and baseboard, kitchen, office, storage room, salon, massage room. | $200,000 |
| Sep 23, 2025 | Completed final sign-off Jan 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | #646. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, 2.5 bath remodel in kind, kitchen remodel in kind. existing accessibilty features to be maintainedDetails
#646. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, 2.5 bath remodel in kind, kitchen remodel in kind. existing accessibilty features to be maintained | $89,000 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit #518: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind.Details
unit #518: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind. | $84,900 |
| Sep 23, 2025 | Expired or cancelled cancelled Jan 2026 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit #535: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind.Details
unit #535: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind. | $84,900 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | #531. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, one bath remodel in kind, kitchen remodel in kind. accessibility features to be maintainedDetails
#531. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, one bath remodel in kind, kitchen remodel in kind. accessibility features to be maintained | $84,900 |
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | apt 428: kitchen and bath remodel in kind. existing electrical panel to be replaced with 125 amp panel. intsall new ceramic tiles, plumbing fixtures. no walls being moved.Details
apt 428: kitchen and bath remodel in kind. existing electrical panel to be replaced with 125 amp panel. intsall new ceramic tiles, plumbing fixtures. no walls being moved. | $84,900 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 524; remove(e) kitchen and vanity cabinets. replace in kind. (e) electrical panel to be replaced with new 125amp panel. install new ceramic tile and plumbing fixtures. no walls moving.Details
unit 524; remove(e) kitchen and vanity cabinets. replace in kind. (e) electrical panel to be replaced with new 125amp panel. install new ceramic tile and plumbing fixtures. no walls moving. | $79,800 |
| May 23, 2025 | Completed final sign-off Aug 2025 | 1661 Pine St | Peninsula Custom Construction Inc | unit #639 - remove and replace kitchen and bath in kind. replace (e) electrical with new 125 amp panel. remove and replace (e) light fixtures w/ recessed can lights. remove and replace (e) plumbing fixtures and tile at one bathroom.Details
unit #639 - remove and replace kitchen and bath in kind. replace (e) electrical with new 125 amp panel. remove and replace (e) light fixtures w/ recessed can lights. remove and replace (e) plumbing fixtures and tile at one bathroom. | $65,000 |
| May 23, 2025 | Completed final sign-off Aug 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 416. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom remodel in kind.Details
unit 416. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom remodel in kind. | $78,900 |
| May 23, 2025 | Completed final sign-off Jul 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 715. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom in kind.Details
unit 715. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom in kind. | $79,800 |
| Apr 21, 2025 | Completed final sign-off Jun 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 931 - remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic toilet plumbing fixtures. no walls moving.Details
unit 931 - remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic toilet plumbing fixtures. no walls moving. | $79,800 |
| Apr 14, 2025 | Completed final sign-off Jun 2025 | 1661 Pine St | Peninsula Custom Construction Inc | unit #733: remove and replace kitchen cabinets in kind. remove and replce plumbing fixtures and tile at one bath. remove and replace electric panel with new 125a panel. remove and replace ceiling light fixtures - replacing with new can lights.Details
unit #733: remove and replace kitchen cabinets in kind. remove and replce plumbing fixtures and tile at one bath. remove and replace electric panel with new 125a panel. remove and replace ceiling light fixtures - replacing with new can lights. | $60,000 |
| Apr 4, 2025 | Completed final sign-off Aug 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit #1023: remove kitchen & vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install ceramic tile & plumbing fixtures. no walls movingDetails
unit #1023: remove kitchen & vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install ceramic tile & plumbing fixtures. no walls moving | $89,000 |
| Mar 13, 2025 | Completed final sign-off May 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | apt #1018: remove kitchen and vanity cabinets replae in kind (e) electrical panel to be replaced with new 125 amp panel install new ceramic tile and plumbing fixtures no wall movingDetails
apt #1018: remove kitchen and vanity cabinets replae in kind (e) electrical panel to be replaced with new 125 amp panel install new ceramic tile and plumbing fixtures no wall moving | $72,400 |
| Mar 5, 2025 | Completed final sign-off May 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 528- remove kitchen and vanity cabinets, replace in kind (e) 125 amp subpanel. install (n) ceramic tile and plubming fixtures. no walls moving or layout changeDetails
unit 528- remove kitchen and vanity cabinets, replace in kind (e) 125 amp subpanel. install (n) ceramic tile and plubming fixtures. no walls moving or layout change | $83,200 |
| Feb 10, 2025 | Completed final sign-off Apr 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit #1035: remove & replace kitchen cabinets in kind both vanities to be replaced in kind (e) elec panel to be replaced w/new 125 amp panel, install new plumbing fixutres and ceramic tile. no walls movedDetails
unit #1035: remove & replace kitchen cabinets in kind both vanities to be replaced in kind (e) elec panel to be replaced w/new 125 amp panel, install new plumbing fixutres and ceramic tile. no walls moved | $83,000 |
| Feb 6, 2025 | Completed final sign-off Apr 2025 | 1661 Pine St | Peninsula Custom Construction Inc | unit #625: remove & replace kitchen cabinets in kind. remove & replace plumbing fixtures + tile @ 2 baths. remove & replace electrical panel w/ new 125 amp panel. remove ceiling light fixtures & replace w/ new can lights.Details
unit #625: remove & replace kitchen cabinets in kind. remove & replace plumbing fixtures + tile @ 2 baths. remove & replace electrical panel w/ new 125 amp panel. remove ceiling light fixtures & replace w/ new can lights. | $92,000 |
| Dec 26, 2024 | Completed final sign-off Mar 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit # 928 remove and replace in kind kitchen and vanity cabinets, (e) electrical panel to be replaced with new 125 amp panel install new plumbing fixtures and ceramic tile (no walls are moving).Details
unit # 928 remove and replace in kind kitchen and vanity cabinets, (e) electrical panel to be replaced with new 125 amp panel install new plumbing fixtures and ceramic tile (no walls are moving). | $81,000 |
| Nov 22, 2024 | Completed final sign-off Feb 2025 | 1661 Pine St | Peninsula Custom Construction Inc | units 342. repair and place kitchen cabinets in kind. repair and place plumbing fixtures and tile + 2 baths. repair and place electrical panel w/new 125a panels. repair and place ceiling lights fixture w/new can lights. all work in kind.Details
units 342. repair and place kitchen cabinets in kind. repair and place plumbing fixtures and tile + 2 baths. repair and place electrical panel w/new 125a panels. repair and place ceiling lights fixture w/new can lights. all work in kind. | $75,000 |
| Nov 18, 2024 | In progress issued Nov 2024 | 1661 Pine St | Peninsula Custom Construction Inc | 4th floor unit 423: remove and replace exising flooring with new hardwood. remove and replace electrical panel with new 125a. existing kitchen and bath to remain. no work in kithcen and bath, no changes in flooring level greater than 1/2", all electrical swithes and receptacles to remain in kindDetails
4th floor unit 423: remove and replace exising flooring with new hardwood. remove and replace electrical panel with new 125a. existing kitchen and bath to remain. no work in kithcen and bath, no changes in flooring level greater than 1/2", all electrical swithes and receptacles to remain in kind | $20,000 |
| Nov 18, 2024 | In progress filed Nov 2024, not yet issued | 1661 Pine St | Peninsula Custom Construction Inc | 3rd floor unit 342: remove and replace kitchen cabinets in kind. remove and replace plumbing fixtures and tiel at 2 baths. remove and replace electrical panel w/new 125a panel. remove and replace light fixtures replace with new cans.Details
3rd floor unit 342: remove and replace kitchen cabinets in kind. remove and replace plumbing fixtures and tiel at 2 baths. remove and replace electrical panel w/new 125a panel. remove and replace light fixtures replace with new cans. | $75,000 |
| Nov 15, 2024 | Completed final sign-off Apr 2025 | 1661 Pine St | Nelson T Lewis Const Co Inc. | 11th floor unit 1143: remove and replace kitchen cabinets in kind. remove and replace both vanities in kind. (e) electrical panel to be replaced with (n) 125amp panel. install new tile and plumbing fixtures at bathrooms. no wall demolition or construction.Details
11th floor unit 1143: remove and replace kitchen cabinets in kind. remove and replace both vanities in kind. (e) electrical panel to be replaced with (n) 125amp panel. install new tile and plumbing fixtures at bathrooms. no wall demolition or construction. | $88,000 |
| Nov 1, 2024 | Completed final sign-off May 2025 | 1661 Pine St | Peninsula Custom Construction Inc | unit 943: remove and replace kitchen in kind. remove and replace plumbing fixtures and tile at 1.5 baths. remove and replace electrical panel w/ new 125a panel. remove ceiling light fixtures and replace with can lights.Details
unit 943: remove and replace kitchen in kind. remove and replace plumbing fixtures and tile at 1.5 baths. remove and replace electrical panel w/ new 125a panel. remove ceiling light fixtures and replace with can lights. | $75,000 |
| Jun 14, 2024 | Completed final sign-off May 2025 | 1661 Pine St | Peninsula Custom Construction Inc | ##814: remove & replace kitchen cabinets in kind. remove & replace tile and plumbing fixtures at bath. remove and replace electricl panel with new 125 amp panel. remove & replace ceiling sheetrock for addition of can lights.Details
##814: remove & replace kitchen cabinets in kind. remove & replace tile and plumbing fixtures at bath. remove and replace electricl panel with new 125 amp panel. remove & replace ceiling sheetrock for addition of can lights. | $70,000 |
| May 20, 2024 | In progress issued May 2024 | 1661 Pine St | Peninsula Custom Construction Inc | unit 1023: remove and replace kitchen cabinets and vanities in kind. remove and replace tile and plumbing fixtures @ 2 baths. remove and replace electrical panel with new 125 amp panel. (no moving walls)Details
unit 1023: remove and replace kitchen cabinets and vanities in kind. remove and replace tile and plumbing fixtures @ 2 baths. remove and replace electrical panel with new 125 amp panel. (no moving walls) | $90,000 |
| May 10, 2024 | Completed final sign-off Sep 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | 6th fl- unit 632- replace kitchen cabinets in kind. replace 1 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel. no change to orignal floor plan layoutDetails
6th fl- unit 632- replace kitchen cabinets in kind. replace 1 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel. no change to orignal floor plan layout | $69,000 |
| May 10, 2024 | Completed final sign-off Dec 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | 7th fl- unit 746- replace kitchen cabinets in kind. replace bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanelDetails
7th fl- unit 746- replace kitchen cabinets in kind. replace bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel | $89,000 |
| May 10, 2024 | Completed final sign-off Dec 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | 8th fl- unit 845- replace kitchen cabinets in kind. replace 2 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel no change to original floor plan layoutDetails
8th fl- unit 845- replace kitchen cabinets in kind. replace 2 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel no change to original floor plan layout | $91,000 |
| May 10, 2024 | Completed final sign-off Jul 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | 5th fl- unit 525- replace kitchen cabinets in kind. replace two bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanelDetails
5th fl- unit 525- replace kitchen cabinets in kind. replace two bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel | $76,000 |
| Apr 23, 2024 | Completed final sign-off Jan 2025 | 1661 Pine St | Peninsula Custom Construction Inc | unit 1342: remove and replace cabinets in kind., remove and replace plumbing fixtures and tile at 2 baths., remove and replace electrical panel with new 125 amp panel., remove and replace ceiling light fixtures and replace with new can lights.Details
unit 1342: remove and replace cabinets in kind., remove and replace plumbing fixtures and tile at 2 baths., remove and replace electrical panel with new 125 amp panel., remove and replace ceiling light fixtures and replace with new can lights. | $90,000 |
| Apr 5, 2024 | Completed final sign-off Jul 2024 | 1661 Pine St | Peninsula Custom Construction Inc | kitchen & bathrroom remodel: r&r kitchen cabinets in kind. tile and plumbing fixtures at bathroom. ceiling sheetrock at ceilings for addition of can lights with approx. 350 sf. no new wall & no (e)wall relocation. new lighting for kitchen & bathroom remodel shall comply with cec 150.0(k)3 & (k)5.Details
kitchen & bathrroom remodel: r&r kitchen cabinets in kind. tile and plumbing fixtures at bathroom. ceiling sheetrock at ceilings for addition of can lights with approx. 350 sf. no new wall & no (e)wall relocation. new lighting for kitchen & bathroom remodel shall comply with cec 150.0(k)3 & (k)5. | $70,000 |
| Mar 5, 2024 | Completed final sign-off May 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | 4th floor: apt #424: remove and replace in kind kitchen cabinets. extg electrical panel, replace with new 125 amp panel. install new tile and plumbing fixtures. no walls are moved. bathroom tile replacement (existing toilet and vanity to remain)Details
4th floor: apt #424: remove and replace in kind kitchen cabinets. extg electrical panel, replace with new 125 amp panel. install new tile and plumbing fixtures. no walls are moved. bathroom tile replacement (existing toilet and vanity to remain) | $73,000 |
| Feb 8, 2024 | Completed final sign-off Apr 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | 10th fl. unit 1010: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving)Details
10th fl. unit 1010: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving) | $69,000 |
| Feb 8, 2024 | Completed final sign-off Jun 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | 10th fl. unit 1027: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving)Details
10th fl. unit 1027: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving) | $84,000 |
| Jan 30, 2024 | Completed final sign-off May 2024 | 1661 Pine St | Peninsula Custom Construction Inc | unit#: 945; remove and replace kitchen cabinets and vanities in-kind remove and replace tile and plumbing fixtures at 2 baths remove and replace electrical panel with new 125 amp panel remove and replace ceiling sheetrock at ceiling for addition of can lights.Details
unit#: 945; remove and replace kitchen cabinets and vanities in-kind remove and replace tile and plumbing fixtures at 2 baths remove and replace electrical panel with new 125 amp panel remove and replace ceiling sheetrock at ceiling for addition of can lights. | $90,000 |
| Jan 30, 2024 | Completed final sign-off May 2024 | 1661 Pine St | Peninsula Custom Construction Inc | unit 736; remove and replace kitchen cabinets and vanities in-kind remove and replace tile and plumbing fixtures at 2 baths remove and replace electrical panel with new 125 amp panel remove and replace ceiling sheetrock at ceiling for addition of can lights.Details
unit 736; remove and replace kitchen cabinets and vanities in-kind remove and replace tile and plumbing fixtures at 2 baths remove and replace electrical panel with new 125 amp panel remove and replace ceiling sheetrock at ceiling for addition of can lights. | $90,000 |
| Dec 21, 2023 | Completed final sign-off Oct 2024 | 1661 Pine St | Johnson Controls Fire | garage lvl 4: modernization elevator 7 & 8. fa modification to add 2 control relays.Details
garage lvl 4: modernization elevator 7 & 8. fa modification to add 2 control relays. | $1,000 |
| Dec 12, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | Peninsula Custom Construction Inc | unit 517: r&r kitchen cabinets and vanities in kind: r&r tile and plumbing fixtures @ two baths: r&r electrical panel w/ new 125amp panel: r&r ceiling sheetrock @ ceilings for addition of 12 can lightsDetails
unit 517: r&r kitchen cabinets and vanities in kind: r&r tile and plumbing fixtures @ two baths: r&r electrical panel w/ new 125amp panel: r&r ceiling sheetrock @ ceilings for addition of 12 can lights | $90,000 |
| Dec 12, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | Peninsula Custom Construction Inc | for unit#: 745; remove and replace kitchen cabinets and vanity in kind, remove and replace tile and plumbing at one bath. remove and replace electrical panel w/new 125 and panel, remove and replace ceiling sheetrock at ceilings for addition of 12 can lightsDetails
for unit#: 745; remove and replace kitchen cabinets and vanity in kind, remove and replace tile and plumbing at one bath. remove and replace electrical panel w/new 125 and panel, remove and replace ceiling sheetrock at ceilings for addition of 12 can lights | $75,000 |
| Dec 12, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | Peninsula Custom Construction Inc | unit 744: r&r kitchen cabinets and vanities in kind: r&r tile and plumbing fixtures @ two baths: r&r electrical panel w/ new 125amp panel: r&r ceiling sheetrock @ ceilings for addition of 12 can lightsDetails
unit 744: r&r kitchen cabinets and vanities in kind: r&r tile and plumbing fixtures @ two baths: r&r electrical panel w/ new 125amp panel: r&r ceiling sheetrock @ ceilings for addition of 12 can lights | $90,000 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 1028: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 1028: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $81,000 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 523: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 523: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $68,500 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 734: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 734: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $69,200 |
| Nov 7, 2023 | Completed final sign-off Feb 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 510: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixturs at bathroom. no wall moving or structural work.Details
unit 510: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixturs at bathroom. no wall moving or structural work. | $41,500 |
| Nov 7, 2023 | Completed final sign-off Feb 2024 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit 331: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixtures at bathroom. no wall moving or structural work.Details
unit 331: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixtures at bathroom. no wall moving or structural work. | $41,500 |
| Nov 1, 2023 | Completed final sign-off Feb 2024 | 1661 Pine St | Peninsula Custom Construction Inc | #513: remove & replace kitchen cabinets and vanities in kind. remove and replace plumbing fixtures at 2 bathrooms. (kitchen and 2 bathrooms remodel).Details
#513: remove & replace kitchen cabinets and vanities in kind. remove and replace plumbing fixtures at 2 bathrooms. (kitchen and 2 bathrooms remodel). | $84,000 |
| Oct 16, 2023 | In progress issued May 2025 | 1661 Pine St | Siemens Industry, Inc. | 1st floor: upgrade the (e) fire alarm system. all panels will be rpelace, as well as all initiating devices and notification devices in the dwelling units, new speakers are added at the dwelling unit sleeping areas. 2800 devices and 14 panels being replce at (e) locations.Details
1st floor: upgrade the (e) fire alarm system. all panels will be rpelace, as well as all initiating devices and notification devices in the dwelling units, new speakers are added at the dwelling unit sleeping areas. 2800 devices and 14 panels being replce at (e) locations. | $1,300,000 |
| Aug 17, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | Peninsula Custom Construction Inc | #346: r&r kitchen cabinets and vanities in kind, r&r tile and plumbing fixtures at 1 bath, r&r electrical panel with new 125 amp panel.Details
#346: r&r kitchen cabinets and vanities in kind, r&r tile and plumbing fixtures at 1 bath, r&r electrical panel with new 125 amp panel. | $45,000 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 837: r&r kitchen cabinets and vanities in kind: r&r tile and plumbing fixture@ 1 bath: r&r electrical panel w/ new 125amp panel: r&r ceiling sheetrock @ two ceilings for addition of 12 can lightsDetails
unit 837: r&r kitchen cabinets and vanities in kind: r&r tile and plumbing fixture@ 1 bath: r&r electrical panel w/ new 125amp panel: r&r ceiling sheetrock @ two ceilings for addition of 12 can lights | $45,000 |
| Aug 17, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 328: r&r kitchen cabinets and vanities in kind: r&r tile and plumbing fixtures @ 2 baths: r&r electrical panel w/ new 125amp panelDetails
unit 328: r&r kitchen cabinets and vanities in kind: r&r tile and plumbing fixtures @ 2 baths: r&r electrical panel w/ new 125amp panel | $80,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit # 514: remove and replace kitchen cabinets, vanities in kind, install new tile and plumbing fixtures at one bathroom, replace (e) electrical panel with new 125 amp panel remove and replace ceiling sheet rock at two ceilings for addition of 16 can lightsDetails
unit # 514: remove and replace kitchen cabinets, vanities in kind, install new tile and plumbing fixtures at one bathroom, replace (e) electrical panel with new 125 amp panel remove and replace ceiling sheet rock at two ceilings for addition of 16 can lights | $60,000 |
| Jul 25, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit # 1211: remove and replace cabinets, vanities inkind, install new tile and plumbing fixtures at two bathrooms, replace (e) electrical with new 125 amp panel. remodel kitchen + two baths.Details
unit # 1211: remove and replace cabinets, vanities inkind, install new tile and plumbing fixtures at two bathrooms, replace (e) electrical with new 125 amp panel. remodel kitchen + two baths. | $80,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 816: r&r kitchen cabinets and vanities in kind- install new tiles and plumbing fixtures @ one bathroom. replace existing electrical panel w/new 125amp panel- r&r ceiling sheetrock @ two ceilings for addition of 16 can lights. no moving walls.Details
unit 816: r&r kitchen cabinets and vanities in kind- install new tiles and plumbing fixtures @ one bathroom. replace existing electrical panel w/new 125amp panel- r&r ceiling sheetrock @ two ceilings for addition of 16 can lights. no moving walls. | $60,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 516: r&r kitchen cabinets and vanities in kind- install new tiles and plumbing fixtures @ one bathroom. replace existing electrical panel w/new 125amp panel- r&r ceiling sheetrock @ two ceilings for addition of 16 can lights. no moving walls.Details
unit 516: r&r kitchen cabinets and vanities in kind- install new tiles and plumbing fixtures @ one bathroom. replace existing electrical panel w/new 125amp panel- r&r ceiling sheetrock @ two ceilings for addition of 16 can lights. no moving walls. | $60,000 |
| Jul 25, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 337# r&r kitchen cabinets and vanities in kind- install new tiles and plumbing fixtures @ one bathroom. replace existing electrical panel w/new 125amp panel- r&r ceiling sheetrock @ two ceilings for addition of 16 can lights. no moving walls.Details
unit 337# r&r kitchen cabinets and vanities in kind- install new tiles and plumbing fixtures @ one bathroom. replace existing electrical panel w/new 125amp panel- r&r ceiling sheetrock @ two ceilings for addition of 16 can lights. no moving walls. | $60,000 |
| Jul 25, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 435: r&r kitchen cabinets and vanities in kind- instll new plumbing fixtures @ one bathroom. replace existing electrical panel w/new 125amp panel- r&r ceiling sheetrock @ two ceilings for addition of 16 can lights. no moving walls.Details
unit 435: r&r kitchen cabinets and vanities in kind- instll new plumbing fixtures @ one bathroom. replace existing electrical panel w/new 125amp panel- r&r ceiling sheetrock @ two ceilings for addition of 16 can lights. no moving walls. | $60,000 |
| Jul 14, 2023 | Completed final sign-off Sep 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 944: remove and replace kitchen cabinets and vanities in kind. replace existing electrical panel w/ new 125amp panel. install new tile and plumbing fixtures and two bathroomsDetails
unit 944: remove and replace kitchen cabinets and vanities in kind. replace existing electrical panel w/ new 125amp panel. install new tile and plumbing fixtures and two bathrooms | $55,000 |
| Jul 14, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit #519:remove and replace kitchen cabinets, vanities in kind. install new tile, plumbing fixtures in one bathroom. replace existing electrical panel w/ new 125amp panel. remove and replace ceiling sheetrock and two ceilings for addition of 16 can lights.Details
unit #519:remove and replace kitchen cabinets, vanities in kind. install new tile, plumbing fixtures in one bathroom. replace existing electrical panel w/ new 125amp panel. remove and replace ceiling sheetrock and two ceilings for addition of 16 can lights. | $45,000 |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit # 725 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 725 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $88,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit # 438 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 438 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $76,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit # 436 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 436 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $72,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit # 538 (5th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 538 (5th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $76,000 |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit # 737 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 737 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $88,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | Nelson T Lewis Const Co Inc. | unit # 1033 (10th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 1033 (10th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $69,000 |
| May 9, 2023 | Never finaled issued May 2023, no final | 1661 Pine St | Peninsula Custom Construction Inc | unit 1246: remove and replace kitchen cabinets and vanities in-kind. replace existing electrical panel with new 125 amp panel. install new tile and plumbing fixtures at two bathrooms.Details
unit 1246: remove and replace kitchen cabinets and vanities in-kind. replace existing electrical panel with new 125 amp panel. install new tile and plumbing fixtures at two bathrooms. | $60,000 |
| Mar 8, 2023 | Completed final sign-off May 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 738# remove and replace kitchen cabinets and vanities in kind. replace existing electrical panel w/ new 125 amp panel: install new tile and plumbing fixtures at two bathrooms.Details
unit 738# remove and replace kitchen cabinets and vanities in kind. replace existing electrical panel w/ new 125 amp panel: install new tile and plumbing fixtures at two bathrooms. | $60,000 |
| Mar 8, 2023 | Never finaled issued Mar 2023, no final | 1661 Pine St | Peninsula Custom Construction Inc | unit 1243# remove and replace kitchen cabinets and vanities in kind. replace existing electrical panel w/ new 125 amp panel: install new tile and plumbing fixtures at two bathrooms.Details
unit 1243# remove and replace kitchen cabinets and vanities in kind. replace existing electrical panel w/ new 125 amp panel: install new tile and plumbing fixtures at two bathrooms. | $60,000 |
| Feb 17, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | Cannon General Contracting Inc | unit 846: kitchen remodel, replace floor thru out, bathroom fixtures, electrical lighting. sheetrock and paintings, tile.Details
unit 846: kitchen remodel, replace floor thru out, bathroom fixtures, electrical lighting. sheetrock and paintings, tile. | $125,000 |
| Jan 13, 2023 | Never finaled issued Jan 2023, no final | 1661 Pine St | Therma Llc | install (1) new in-line ventilation fan, (2) intake ducts and grilles inlet louver, tabb balance ref pa# 2022-0331-1320Details
install (1) new in-line ventilation fan, (2) intake ducts and grilles inlet louver, tabb balance ref pa# 2022-0331-1320 | $21,000 |
| Jan 5, 2023 | Completed final sign-off Mar 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 415: new kitchen cabinets and vanity in kind. replace (e) electrical panel with new 100 amp panel. new tile and plumbing fixture at bathDetails
unit 415: new kitchen cabinets and vanity in kind. replace (e) electrical panel with new 100 amp panel. new tile and plumbing fixture at bath | $30,000 |
| Nov 22, 2022 | Completed final sign-off Aug 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit: #446: new kitchen & (2) bath remodel. new kitchen cabinets and vanities in kind. replace existing electrical panel with new 100 amp panel. install new tile and plumbing fixtures at two bathrooms.Details
unit: #446: new kitchen & (2) bath remodel. new kitchen cabinets and vanities in kind. replace existing electrical panel with new 100 amp panel. install new tile and plumbing fixtures at two bathrooms. | $30,000 |
| Nov 22, 2022 | Completed final sign-off Apr 2023 | 1661 Pine St | Peninsula Custom Construction Inc | #546. new kitchen cabinets and vanities in kind. replace existing electrical panel with new 100 amp panel. install new tile and plumbing fixtures at two bathrooms. non structural.Details
#546. new kitchen cabinets and vanities in kind. replace existing electrical panel with new 100 amp panel. install new tile and plumbing fixtures at two bathrooms. non structural. | $30,000 |
| Nov 22, 2022 | Completed final sign-off Aug 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 311: new kitchen cabinets/vanities in-kind, replace (2)(e) electrical panels w/new 100 amp panels, install new tile/plumbing fixtures @ (2) bathroomsDetails
unit 311: new kitchen cabinets/vanities in-kind, replace (2)(e) electrical panels w/new 100 amp panels, install new tile/plumbing fixtures @ (2) bathrooms | $30,000 |
| Nov 22, 2022 | Completed final sign-off Feb 2024 | 1661 Pine St | Peninsula Custom Construction Inc | unit 644: one new kitchen cabinets/vanities in-kind, replace (e)electrical panel w/new 100 amp panels, install new tile/plumbing fixtures @ (2) bathroomsDetails
unit 644: one new kitchen cabinets/vanities in-kind, replace (e)electrical panel w/new 100 amp panels, install new tile/plumbing fixtures @ (2) bathrooms | $30,000 |
| Sep 13, 2022 | Completed final sign-off Jun 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 1144: new cabinets at vanity cabinets and countertops (kitchen): replace (e) electrical panel w/ new 100a panel: install new plumbing fixtures and tile at two bathrooms/ new pan: replace (e) outlets and switchesDetails
unit 1144: new cabinets at vanity cabinets and countertops (kitchen): replace (e) electrical panel w/ new 100a panel: install new plumbing fixtures and tile at two bathrooms/ new pan: replace (e) outlets and switches | $30,000 |
| Sep 13, 2022 | Completed final sign-off Jan 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 511: new cabinets at kitchen and 2 bathrooms: replace (e) eectrical panel with new 100a: install new plumbing fixtures and tile at two bathrooms and pans: replace (e) outlets and switchesDetails
unit 511: new cabinets at kitchen and 2 bathrooms: replace (e) eectrical panel with new 100a: install new plumbing fixtures and tile at two bathrooms and pans: replace (e) outlets and switches | $30,000 |
| Sep 2, 2022 | Completed final sign-off Nov 2022 | 1661 Pine St | Shield Fire Protection, Inc. | add fire sprinklers for elevator modernization project for elevators 7, 8, 9.Details
add fire sprinklers for elevator modernization project for elevators 7, 8, 9. | $10,000 |
| Aug 9, 2022 | Completed final sign-off Dec 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 617: new kitchen cabinets and vanities in kind: replace existing electrical panel w/ new 100amp panel: install new tile and plumbing fixture at two bathrooms.Details
unit 617: new kitchen cabinets and vanities in kind: replace existing electrical panel w/ new 100amp panel: install new tile and plumbing fixture at two bathrooms. | $30,000 |
| Aug 9, 2022 | Completed final sign-off Dec 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 726: new kitchen cabinets and vanities in kind: replace existing electrical panel w/ new 100amp panel: install new tile and plumbing fixture at two bathrooms.Details
unit 726: new kitchen cabinets and vanities in kind: replace existing electrical panel w/ new 100amp panel: install new tile and plumbing fixture at two bathrooms. | $30,000 |
| Jun 10, 2022 | Completed final sign-off Jun 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 1146: new kitchen cabinets and vanities in kind: replace existing electrical panel w/ new 100amp panel: install new tile and plumbing fixtures at two bathrooms. no new wall & no (e) wall relocation. new lighting shallomply w/cec 150.0(k)3 & (k)5. new sheet rock shall be 5/8" type x gyp board.Details
unit 1146: new kitchen cabinets and vanities in kind: replace existing electrical panel w/ new 100amp panel: install new tile and plumbing fixtures at two bathrooms. no new wall & no (e) wall relocation. new lighting shallomply w/cec 150.0(k)3 & (k)5. new sheet rock shall be 5/8" type x gyp board. | $30,000 |
| Jun 10, 2022 | Completed final sign-off Sep 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 527: new kitchen cabinets and vanities in kind: replace existing electrical panel w/new 100amp panel install new tile and plumbing fixtures at two bathrooms. no new wall & no existing wall relocation. new lighting shall comply w/cec 150.0 k(3) & (k)5. new shjeet rock shall be 5/8" type x gyp bdDetails
unit 527: new kitchen cabinets and vanities in kind: replace existing electrical panel w/new 100amp panel install new tile and plumbing fixtures at two bathrooms. no new wall & no existing wall relocation. new lighting shall comply w/cec 150.0 k(3) & (k)5. new shjeet rock shall be 5/8" type x gyp bd | $30,000 |
| May 11, 2022 | Completed final sign-off Jun 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 918: replace new kitchen cabinets and vanity in kind. replace existing electrical panel with new 100amp panel. install new tile and plumbing fixtures at one bathroom. no wall or layout changes.Details
unit 918: replace new kitchen cabinets and vanity in kind. replace existing electrical panel with new 100amp panel. install new tile and plumbing fixtures at one bathroom. no wall or layout changes. | $30,000 |
| May 11, 2022 | Completed final sign-off Dec 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 443: replace new kitchen cabinets and vanity cabinets in kind- replace existing 100a electrical panel with new 100a install new tile and plumbing fixtures at two bathrooms. no wall or layout changes.Details
unit 443: replace new kitchen cabinets and vanity cabinets in kind- replace existing 100a electrical panel with new 100a install new tile and plumbing fixtures at two bathrooms. no wall or layout changes. | $30,000 |
| Mar 31, 2022 | Completed final sign-off Jun 2023 | 1661 Pine St | Peninsula Custom Construction Inc | construction converts an (e) occupancy (not oshpd/hcai jurisdiction) office/leasing space to a hair salon for residents only. work occurs at an existing fully accessible space at the mezzanine level and is accessed via conforming elevators. show, partial-height wall and dek/casework are to be removeDetails
construction converts an (e) occupancy (not oshpd/hcai jurisdiction) office/leasing space to a hair salon for residents only. work occurs at an existing fully accessible space at the mezzanine level and is accessed via conforming elevators. show, partial-height wall and dek/casework are to be remove | $60,000 |
| Mar 10, 2022 | Completed final sign-off Jun 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 414: new kitchen cabinets in kind: replace existing electrical panel with new panel: new tile and cabinetry at bathroomDetails
unit 414: new kitchen cabinets in kind: replace existing electrical panel with new panel: new tile and cabinetry at bathroom | $30,000 |
| Mar 10, 2022 | Completed final sign-off Aug 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 610: new kitchen and vanity cabinets and countertops: new electrical panael w / new: new shower tile at bathroom: remodel in kndDetails
unit 610: new kitchen and vanity cabinets and countertops: new electrical panael w / new: new shower tile at bathroom: remodel in knd | $30,000 |
| Jan 18, 2022 | Completed final sign-off May 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 515. new kitchen and bathroom remodel in kind. replace (e) 100 a electrical panel with new 100 a.Details
unit 515. new kitchen and bathroom remodel in kind. replace (e) 100 a electrical panel with new 100 a. | $40,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 931: new kitchen and vanity cabinets. retile shower stall. install new 100a electrical panel. remodel in kind.Details
unit 931: new kitchen and vanity cabinets. retile shower stall. install new 100a electrical panel. remodel in kind. | $40,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 832: remodel kitchen and bathroom in kind: replace (e) 100a electrical panel with new 100a panelDetails
unit 832: remodel kitchen and bathroom in kind: replace (e) 100a electrical panel with new 100a panel | $40,000 |
| Jan 18, 2022 | Completed final sign-off Feb 2022 | 1661 Pine St | Peninsula Custom Construction Inc | unit 1011. new kitchen cabinets in kind. replace (e) 100a electrical panel with new 100a panel.Details
unit 1011. new kitchen cabinets in kind. replace (e) 100a electrical panel with new 100a panel. | $30,000 |
| Jan 18, 2022 | Completed final sign-off Jun 2023 | 1661 Pine St | Peninsula Custom Construction Inc | unit 1135: remodel kitchen and two bathrooms in kind- replace (e) 100a electrical panel with new 100aDetails
unit 1135: remodel kitchen and two bathrooms in kind- replace (e) 100a electrical panel with new 100a | $60,000 |
| Dec 9, 2021 | Never finaled issued Dec 2021, no final | 1661 Pine St | Martin Sign Co Inc. | fabrication and installation of evacuation maps for mezzanine level only. rev to pa202009295409.Details
fabrication and installation of evacuation maps for mezzanine level only. rev to pa202009295409. | |
| Sep 29, 2020 | Completed final sign-off Jan 2022 | 1661 Pine St | Martin Sign Co Inc. | fabrication and installation of evacuation mapsDetails
fabrication and installation of evacuation maps | $1,690 |
| Jun 11, 2020 | Never finaled issued Jun 2020, no final | 1661 Pine St | street spaceDetails
street space | ||
| Mar 6, 2020 | Never finaled issued Mar 2020, no final | 1661 Pine St | street spaceDetails
street space | ||
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 1661 Pine St | City Building Inc. | remove & replace (e) tile flooring, toilet(2) urinals (2) and 2 lavysinks. new frp wall panels throughout. g1 west mens bathroom. all walls and ceiling remain. repalce existing electrical devices replace existing recessed lights/led.Details
remove & replace (e) tile flooring, toilet(2) urinals (2) and 2 lavysinks. new frp wall panels throughout. g1 west mens bathroom. all walls and ceiling remain. repalce existing electrical devices replace existing recessed lights/led. | $50,000 |
| Mar 6, 2019 | Never finaled issued Mar 2019, no final | 1661 Pine St | City Building Inc. | remove and replace existing tile, flooring, toilets (3), urinal (1), and (2) shower pans. new frp wall panels throughout except showers. all walls & ceilings stay in same locations. remove and replace (4) sinks. replace existing electrical devices. upgrade existing recessed lighting to ledDetails
remove and replace existing tile, flooring, toilets (3), urinal (1), and (2) shower pans. new frp wall panels throughout except showers. all walls & ceilings stay in same locations. remove and replace (4) sinks. replace existing electrical devices. upgrade existing recessed lighting to led | $50,000 |
| Oct 18, 2017 | Completed final sign-off Apr 2018 | 1603 Pine St | Cahill Contractors Llc. | 1st fl: installation of a new light gauge framing to support (n) interior storefront w/o altering (e) fire rated plenum.Details
1st fl: installation of a new light gauge framing to support (n) interior storefront w/o altering (e) fire rated plenum. | $2,000 |
| Sep 1, 2017 | Expired or cancelled cancelled Apr 2018 | 1603 Pine St | Cahill Contractors Inc | installation of new max ht 20" planters @ ground level; they do not extend past the building; irrigation lines to planters; installation of new awning above entry; no signage on it; does not extend past the buildingDetails
installation of new max ht 20" planters @ ground level; they do not extend past the building; irrigation lines to planters; installation of new awning above entry; no signage on it; does not extend past the building | $2,000 |
| Aug 9, 2017 | Never finaled issued Aug 2017, no final | 1603 Pine St | street spaceDetails
street space | ||
| May 9, 2017 | Completed final sign-off Nov 2017 | 1603 Pine St | Westates Mechanical Corporation Inc | ref t.i. pa#201609026723: due to conversion of (e) g/f retail space to office area for marketing. relocation of fire sprinkler to new location (pendent). all (e) branchlines and main piping beyond area of work are to remain. north east corner room 101.Details
ref t.i. pa#201609026723: due to conversion of (e) g/f retail space to office area for marketing. relocation of fire sprinkler to new location (pendent). all (e) branchlines and main piping beyond area of work are to remain. north east corner room 101. | $14,000 |
| Mar 20, 2017 | Never finaled issued Apr 2017, no final | 1603 Pine St | Siemens Industry, Inc. | fire alarm work for the "sales office" remodel on floor 1; 1 new strobe and power supply will be added, as well as the relocation of 1 pull station, 5 speakers and 5 strobes. ref pa 2016-0902-6723. maher naDetails
fire alarm work for the "sales office" remodel on floor 1; 1 new strobe and power supply will be added, as well as the relocation of 1 pull station, 5 speakers and 5 strobes. ref pa 2016-0902-6723. maher na | $5,400 |
| Jan 26, 2017 | Completed final sign-off May 2017 | 1661 Pine St | City Building Inc. | unit #636. 2 baths & 1 kitchen remodel new cabinets & plumbing fixts throughout. 2 new shower pans. no walls removed or relocated. no lighting change. n/a for maher.Details
unit #636. 2 baths & 1 kitchen remodel new cabinets & plumbing fixts throughout. 2 new shower pans. no walls removed or relocated. no lighting change. n/a for maher. | $40,000 |
| Jan 26, 2017 | Never finaled issued Jan 2017, no final | 1661 Pine St | City Building Inc. | unit #528. 1 1/2 bath & 1 kitchen remodel new cabinets & plumbing fixts throughout. new shower pan. no walls removed or relocated. no lighting change. n/a for maher.Details
unit #528. 1 1/2 bath & 1 kitchen remodel new cabinets & plumbing fixts throughout. new shower pan. no walls removed or relocated. no lighting change. n/a for maher. | $30,000 |
| Nov 15, 2016 | Expired or cancelled expired Nov 2017 | 1661 Pine St | City Building Inc. | # 1144: amend 201610170507. change unit number 513 to unit # 1144. sam scope of work. n/a maherDetails
# 1144: amend 201610170507. change unit number 513 to unit # 1144. sam scope of work. n/a maher | |
| Oct 17, 2016 | Completed final sign-off Dec 2016 | 1661 Pine St | City Building Inc. | unit #1143: one bath remodel. new cabinets & plumbing fixtures throughout. one shower pan. no walls, window, or door removed or relocated.Details
unit #1143: one bath remodel. new cabinets & plumbing fixtures throughout. one shower pan. no walls, window, or door removed or relocated. | $12,000 |
| Oct 17, 2016 | Completed final sign-off Jan 2017 | 1661 Pine St | City Building Inc. | unit #426: two baths and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. two shower pans. no walls, window, or door removed or relocated.Details
unit #426: two baths and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. two shower pans. no walls, window, or door removed or relocated. | $21,000 |
| Oct 17, 2016 | Expired or cancelled expired Nov 2017 | 1661 Pine St | City Building Inc. | unit #513: one bath and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. no walls, window, or door removed or relocated.Details
unit #513: one bath and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. no walls, window, or door removed or relocated. | $18,000 |
| Oct 17, 2016 | Completed final sign-off Dec 2016 | 1661 Pine St | City Building Inc. | unit #526: one bath and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. one shower pan. no walls, windows, or door removed or relocated.Details
unit #526: one bath and 1 kitchen remodel. new cabinets & plumbing fixtures throughout. one shower pan. no walls, windows, or door removed or relocated. | $18,000 |
| Sep 2, 2016 | Never finaled issued May 2017, no final | 1603 Pine St | Cahill Contractors Llc. | ti construction & storefront renovation. change of use from retail to office. n/a for maher ordinance no 155-13.Details
ti construction & storefront renovation. change of use from retail to office. n/a for maher ordinance no 155-13. | $200,000 |
| Aug 30, 2016 | Completed final sign-off Oct 2016 | 1661 Pine St | City Building Inc. | unit # 935, 1 bath , 1 kitchen new cabinets & plumbing fixtures throughout, 1 shower pan no wall removed or relocatedDetails
unit # 935, 1 bath , 1 kitchen new cabinets & plumbing fixtures throughout, 1 shower pan no wall removed or relocated | $18,000 |
| Aug 30, 2016 | Expired or cancelled expired Nov 2017 | 1661 Pine St | City Building Inc. | unit # 513, 1 bath , 1 kitchen new cabinets & plumbing fixtures throughout, 1 shower pan no wall removed or relocatedDetails
unit # 513, 1 bath , 1 kitchen new cabinets & plumbing fixtures throughout, 1 shower pan no wall removed or relocated | $18,000 |
| Aug 1, 2016 | Completed final sign-off Jan 2017 | 1661 Pine St | City Building Inc. | #339: (1) bath/(1) kitchen remodel. new cabinet & plumbing fixtures throughout. new shower pan. no walls removed or relocated, no lighting change.Details
#339: (1) bath/(1) kitchen remodel. new cabinet & plumbing fixtures throughout. new shower pan. no walls removed or relocated, no lighting change. | $18,000 |
| Aug 1, 2016 | Completed final sign-off Sep 2016 | 1661 Pine St | City Building Inc. | #1023: (2) bath/(1) kitchen remodeling. new cabinet & plumbing fixtures throughout. new shower pan. no walls removed or relocated, no lighting change.Details
#1023: (2) bath/(1) kitchen remodeling. new cabinet & plumbing fixtures throughout. new shower pan. no walls removed or relocated, no lighting change. | $21,000 |
| Jun 15, 2016 | Completed final sign-off Sep 2016 | 1661 Pine St | City Building Inc. | unit 341: (2) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not requiredDetails
unit 341: (2) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not required | $25,000 |
| Jun 15, 2016 | Completed final sign-off Aug 2016 | 1661 Pine St | City Building Inc. | unit 716: (2) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not requiredDetails
unit 716: (2) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not required | $18,000 |
| Jun 15, 2016 | Completed final sign-off Sep 2016 | 1661 Pine St | City Building Inc. | unit 344: (1) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not required.Details
unit 344: (1) bath/(1) kitchen; new cabinets & plumbing fixtures throughout, (1) new shower pan, no walls removed/relocated; compliance with maher ordinance no 155-13 not required. | $18,000 |
| May 20, 2016 | Completed final sign-off Aug 2016 | 1603 Pine St | City Building Inc. | remove & bar ceiling drywall ceiling & partition walls; all fire rated assemblies to remain.Details
remove & bar ceiling drywall ceiling & partition walls; all fire rated assemblies to remain. | $7,000 |
| Mar 24, 2016 | Completed final sign-off Jul 2016 | 1661 Pine St | City Building Inc. | apt #837: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated.Details
apt #837: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off May 2016 | 1661 Pine St | City Building Inc. | apt #615: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated.Details
apt #615: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off Jun 2016 | 1661 Pine St | City Building Inc. | apt #833: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated.Details
apt #833: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off May 2016 | 1661 Pine St | City Building Inc. | apt #824: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated.Details
apt #824: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off Jun 2016 | 1661 Pine St | City Building Inc. | apt #844: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated.Details
apt #844: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off Jun 2016 | 1661 Pine St | City Building Inc. | apt #810: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated.Details
apt #810: 1 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 1 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Mar 24, 2016 | Completed final sign-off Jul 2016 | 1661 Pine St | City Building Inc. | apt #1112: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated.Details
apt #1112: 2 bathroom & 1 kitchen: new cabinets & plumbing fixtures througout. 2 new shower pan. like for like. no walls removed or relocated. | $18,000 |
| Jan 20, 2016 | Completed final sign-off May 2016 | 1661 Pine St | City Building Inc. | apt 713: remodel 2 bathroms, 1 kitchen. new cabinets & plumbing fixtures throughout. 2 new shower pans.Details
apt 713: remodel 2 bathroms, 1 kitchen. new cabinets & plumbing fixtures throughout. 2 new shower pans. | $21,000 |
| Jan 20, 2016 | Completed final sign-off Nov 2016 | 1661 Pine St | City Building Inc. | apt 313: remodel 1 bathroms, 1 kitchen. new cabinets & plumbing fixtures throughout. 1 new shower pans.Details
apt 313: remodel 1 bathroms, 1 kitchen. new cabinets & plumbing fixtures throughout. 1 new shower pans. | $18,000 |
| Jan 20, 2016 | Completed final sign-off Feb 2016 | 1661 Pine St | City Building Inc. | apt 936: retile 2 bathrooms.Details
apt 936: retile 2 bathrooms. | $10,000 |
| Oct 16, 2015 | Completed final sign-off Nov 2016 | 1661 Pine St | City Building Inc. | unit #618: bath and kitchen remodel. new cabinets and plumbing fixtures throughout. new shower pan.Details
unit #618: bath and kitchen remodel. new cabinets and plumbing fixtures throughout. new shower pan. | $18,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 1661 Pine St | City Building Inc. | unit #826: two baths and one kitchen remodel. new cabinets and plumbing fixtures throughout. two new shower pans.Details
unit #826: two baths and one kitchen remodel. new cabinets and plumbing fixtures throughout. two new shower pans. | $21,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 1661 Pine St | City Building Inc. | unit #616: bathroom and kitchen remodel. new cabinets, plumbing fixtures throughout. new shower pan.Details
unit #616: bathroom and kitchen remodel. new cabinets, plumbing fixtures throughout. new shower pan. | $18,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 1661 Pine St | City Building Inc. | unit #626: bathroom and kitchen remodel. new cabinets and plumbing fixtures throughout. new shower pan.Details
unit #626: bathroom and kitchen remodel. new cabinets and plumbing fixtures throughout. new shower pan. | $18,000 |
| Sep 2, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | City Building Inc. | work in unit 835: new kitchen and bathroom cabinets (1 bath), new tile at bathroom, new plumbing fixtures throughout kitchen and bathDetails
work in unit 835: new kitchen and bathroom cabinets (1 bath), new tile at bathroom, new plumbing fixtures throughout kitchen and bath | $18,000 |
| Sep 2, 2015 | Never finaled issued Sep 2015, no final | 1661 Pine St | City Building Inc. | work in unit 1211: new bathroom cabinets (1 bath), new tile at bathroom, new plumbing fixtures.Details
work in unit 1211: new bathroom cabinets (1 bath), new tile at bathroom, new plumbing fixtures. | $9,000 |
| Aug 3, 2015 | Never finaled issued Aug 2015, no final | 1661 Pine St | City Building Inc. | revision to app 201502107951. flag pole to be installed with new base sleeve with extg flog pole. n/a for maher.Details
revision to app 201502107951. flag pole to be installed with new base sleeve with extg flog pole. n/a for maher. | $2,000 |
| Jul 13, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | City Building Inc. | unit #924. new kitchen & bathroom cabinets (1 bath). no wall modification. no structural work. n/a for maher.Details
unit #924. new kitchen & bathroom cabinets (1 bath). no wall modification. no structural work. n/a for maher. | $25,000 |
| Jul 13, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | City Building Inc. | unit #628. new kitchen & bathroom cabinets (2 baths). no wall modification. no structural work. n/a for maher.Details
unit #628. new kitchen & bathroom cabinets (2 baths). no wall modification. no structural work. n/a for maher. | $32,000 |
| Jul 13, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | City Building Inc. | unit #424. new kitchen & bathroom cabinets (1 bath). no wall modification. no structural work. n/a for maher.Details
unit #424. new kitchen & bathroom cabinets (1 bath). no wall modification. no structural work. n/a for maher. | $25,000 |
| Jun 23, 2015 | Completed final sign-off Aug 2015 | 1661 Pine St | City Building Inc. | unit 825 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 825 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & altered | $18,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | City Building Inc. | unit 1044 - new kitchen and bathroom cabinets (2); new tile at 2 bathrooms, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 1044 - new kitchen and bathroom cabinets (2); new tile at 2 bathrooms, new plumbing fixtures throughout. no wall to be removed & altered | $25,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | City Building Inc. | unit 723 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 723 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & altered | $18,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2015 | 1661 Pine St | City Building Inc. | unit 644 - new kitchen and bathroom cabinets (2.5); new tile at 2.5 bathrooms, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 644 - new kitchen and bathroom cabinets (2.5); new tile at 2.5 bathrooms, new plumbing fixtures throughout. no wall to be removed & altered | $28,000 |
| Jun 23, 2015 | Completed final sign-off Aug 2015 | 1661 Pine St | City Building Inc. | unit 533 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & alteredDetails
unit 533 - new kitchen and bathroom cabinets (1); new tile at 1 bathroom, new plumbing fixtures throughout. no wall to be removed & altered | $18,000 |
| May 15, 2015 | Completed final sign-off Aug 2015 | 1661 Pine St | City Building Inc. | work in unit 625: new kitchen and bathroom cabinets (2), new tile at two bathrooms, new plumbing fixtures throughout. no walls to be moved, all fire resistive asemblies to be maintained.Details
work in unit 625: new kitchen and bathroom cabinets (2), new tile at two bathrooms, new plumbing fixtures throughout. no walls to be moved, all fire resistive asemblies to be maintained. | $25,000 |
| May 15, 2015 | Completed final sign-off Jul 2015 | 1661 Pine St | City Building Inc. | work in unit #913: new kitchen and bathroom cabinets 92), new tile at two bathrooms, new plumbing fixtures throughout, no walls to be moved a,, fire resistive assemblies to be maintained.Details
work in unit #913: new kitchen and bathroom cabinets 92), new tile at two bathrooms, new plumbing fixtures throughout, no walls to be moved a,, fire resistive assemblies to be maintained. | $25,000 |
| Feb 10, 2015 | Never finaled issued Feb 2015, no final | 1661 Pine St | City Building Inc. | refurbish (2) total (e) flag poles. weld new steel base plates to posts. cut damaged threaded rod. install couplings and extend rodDetails
refurbish (2) total (e) flag poles. weld new steel base plates to posts. cut damaged threaded rod. install couplings and extend rod | $2,000 |
| Jan 15, 2015 | Completed final sign-off Mar 2015 | 1661 Pine St | City Building Inc. | #324: new kitchen & new bathroom cabinets, counter tops. new plumbing fixtures and tile throughout. one kitchen, one bathroom.Details
#324: new kitchen & new bathroom cabinets, counter tops. new plumbing fixtures and tile throughout. one kitchen, one bathroom. | $18,000 |
| Jan 15, 2015 | Completed final sign-off Feb 2015 | 1661 Pine St | City Building Inc. | #1034: new bathtub, rest of 2 bathroom to remain.Details
#1034: new bathtub, rest of 2 bathroom to remain. | $12,000 |
| Jan 15, 2015 | Completed final sign-off Jan 2015 | 1661 Pine St | City Building Inc. | #413: new kitchen and bath cabinets, new tile at bathrooms, new plumbing fixtures throughout. one kitchen, two bathrooms.Details
#413: new kitchen and bath cabinets, new tile at bathrooms, new plumbing fixtures throughout. one kitchen, two bathrooms. | $27,000 |
| Jan 15, 2015 | Completed final sign-off Feb 2015 | 1661 Pine St | City Building Inc. | #418: new bathroom tile and vanity counter top.Details
#418: new bathroom tile and vanity counter top. | $12,000 |
| Aug 1, 2014 | Completed final sign-off Sep 2014 | 1661 Pine St | City Building Inc. | #834- new kitchen & bathroom cabinets, new tile at 1 bathroom, new plumbing fixtures throughout. n/a to ordinance #155-13.Details
#834- new kitchen & bathroom cabinets, new tile at 1 bathroom, new plumbing fixtures throughout. n/a to ordinance #155-13. | $18,000 |
| Aug 1, 2014 | Never finaled issued Aug 2014, no final | 1661 Pine St | City Building Inc. | #428- new kitchen & bathroom cabinets, new tile at 2 bathrooms, new plumbing fixtures throughout. n/a to ordinance #155-13.Details
#428- new kitchen & bathroom cabinets, new tile at 2 bathrooms, new plumbing fixtures throughout. n/a to ordinance #155-13. | $27,000 |
| Aug 1, 2014 | Completed final sign-off Sep 2014 | 1661 Pine St | City Building Inc. | #544- new kitchen & bathroom cabinets, new tile at 2 bathrooms, new plumbing fixtures throughout. n/a to ordinance #155-13.Details
#544- new kitchen & bathroom cabinets, new tile at 2 bathrooms, new plumbing fixtures throughout. n/a to ordinance #155-13. | $27,000 |
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 1661 Pine St | City Building Inc. | unit#318 - 1 kitchen 1 bath, unit#419 - 1 kitchen 1 bath, unit#918 - 1 kitchen 1 bath, unit#917 - 1 kitchen 1.5 bath. new kitchen and bath cabinets new tile at bathrooms. new plumbing fixtures throughout kitchen 100 sq ft, bath 40 sq ft.Details
unit#318 - 1 kitchen 1 bath, unit#419 - 1 kitchen 1 bath, unit#918 - 1 kitchen 1 bath, unit#917 - 1 kitchen 1.5 bath. new kitchen and bath cabinets new tile at bathrooms. new plumbing fixtures throughout kitchen 100 sq ft, bath 40 sq ft. | $124,064 |
| Feb 25, 2014 | Completed final sign-off Apr 2014 | 1661 Pine St | City Building Inc. | unit #645. new kitchen and bath cabinets, new tile at bathrooms. new plumbing fixtures throughout includes one kitchen 100 sq ft. two bathrooms 40 sq ft.Details
unit #645. new kitchen and bath cabinets, new tile at bathrooms. new plumbing fixtures throughout includes one kitchen 100 sq ft. two bathrooms 40 sq ft. | $31,016 |
| Oct 18, 2013 | Completed final sign-off Nov 2013 | 1661 Pine St | City Building Inc. | unit 1018: new kitchen & bathroom cabinets, new bathroom tile @ one bath.Details
unit 1018: new kitchen & bathroom cabinets, new bathroom tile @ one bath. | $18,000 |
| Oct 18, 2013 | Completed final sign-off Nov 2013 | 1661 Pine St | City Building Inc. | unit 316: new kitchen & bathroom cabinets, new bathroom tile @ one bathroom.Details
unit 316: new kitchen & bathroom cabinets, new bathroom tile @ one bathroom. | $18,000 |
| Oct 18, 2013 | Completed final sign-off Jan 2014 | 1661 Pine St | City Building Inc. | unit 915: new kitchen & bathroom cabinets, new bathroom tile @ one bath.Details
unit 915: new kitchen & bathroom cabinets, new bathroom tile @ one bath. | $18,000 |
| Oct 18, 2013 | Completed final sign-off Jan 2014 | 1661 Pine St | City Building Inc. | new kitchen & bathroom cabinets, new bathroom tile @ bathroom. units 631, 731 & 714 have one kitchen & one bathroom. units 928 & 638 have one kitchen & two bathrooms. total 5 kitches & 7 bathrooms.Details
new kitchen & bathroom cabinets, new bathroom tile @ bathroom. units 631, 731 & 714 have one kitchen & one bathroom. units 928 & 638 have one kitchen & two bathrooms. total 5 kitches & 7 bathrooms. | $108,000 |
| Aug 22, 2013 | Completed final sign-off Jan 2014 | 1661 Pine St | City Building Inc. | unit #836: new kitchen and bathroom cabinets and tile, with stone counter top, no lightingDetails
unit #836: new kitchen and bathroom cabinets and tile, with stone counter top, no lighting | $27,000 |
| Aug 22, 2013 | Completed final sign-off Aug 2013 | 1661 Pine St | City Building Inc. | unit #817: new kitchen and bath cabinets and tile, new stone countertop, no lightingDetails
unit #817: new kitchen and bath cabinets and tile, new stone countertop, no lighting | $27,000 |
| May 21, 2013 | Completed final sign-off Jan 2014 | 1661 Pine St | City Building Inc. | comply with co alarm per cbc-2010 section 420.4. (n) kitchen & bath cabinets. (n) tile at 2 bathrooms. no mechanical work.Details
comply with co alarm per cbc-2010 section 420.4. (n) kitchen & bath cabinets. (n) tile at 2 bathrooms. no mechanical work. | $18,000 |
| May 21, 2013 | Completed final sign-off May 2013 | 1661 Pine St | City Building Inc. | comply with cbc 2010 section 420.4 co alarm. (n) bathroom & kitchen cabinest. (n) title @ 2 bathrooms. no mechanical work.Details
comply with cbc 2010 section 420.4 co alarm. (n) bathroom & kitchen cabinest. (n) title @ 2 bathrooms. no mechanical work. | $18,000 |
| May 21, 2013 | Completed final sign-off Jan 2014 | 1661 Pine St | City Building Inc. | comply with co alarms per cbc-2010 section 420.4. (n) kitech & bath cabinets. (n) tile at 2.5 baths. no mech workDetails
comply with co alarms per cbc-2010 section 420.4. (n) kitech & bath cabinets. (n) tile at 2.5 baths. no mech work | $18,000 |
| May 21, 2013 | Completed final sign-off Jun 2013 | 1661 Pine St | City Building Inc. | comply with cbc 2010 section 470.4 co alarm. remove 8' tall x 10' wide water damage dry wall. install (n) stainless steel paneling. remove & reinstall two sinks & one greasetrap. no mechanical work.Details
comply with cbc 2010 section 470.4 co alarm. remove 8' tall x 10' wide water damage dry wall. install (n) stainless steel paneling. remove & reinstall two sinks & one greasetrap. no mechanical work. | $3,000 |
| Dec 6, 2012 | Never finaled issued Dec 2012, no final | 1661 Pine St | City Building Inc. | unit #646. (1) new kitchen and bath cabinets two new full bathrooms, one half bath.Details
unit #646. (1) new kitchen and bath cabinets two new full bathrooms, one half bath. | $18,000 |
| Dec 6, 2012 | Completed final sign-off Mar 2013 | 1661 Pine St | City Building Inc. | unit #1037: new one kitchen and bath cabinets, new finishes at 2 bathsDetails
unit #1037: new one kitchen and bath cabinets, new finishes at 2 baths | $18,000 |
| Dec 6, 2012 | Completed final sign-off Apr 2013 | 1661 Pine St | City Building Inc. | unit #417: new one kitchen and bath cabinets, new finishes at 2 new bathroomsDetails
unit #417: new one kitchen and bath cabinets, new finishes at 2 new bathrooms | $18,000 |
| Dec 6, 2012 | Completed final sign-off Jan 2013 | 1661 Pine St | City Building Inc. | unit #1138: new one kitchen and bath cabinets, new finishes at 2 bathroomsDetails
unit #1138: new one kitchen and bath cabinets, new finishes at 2 bathrooms | $18,000 |
| Dec 6, 2012 | Completed final sign-off Mar 2013 | 1661 Pine St | City Building Inc. | new kitchen and bath cabinets. new finishes at one bathroom each in unit 914, 831, 519, 916 & 815. 5 kitchens & 5 bathrooms.Details
new kitchen and bath cabinets. new finishes at one bathroom each in unit 914, 831, 519, 916 & 815. 5 kitchens & 5 bathrooms. | $88,000 |
| Oct 18, 2012 | Completed final sign-off May 2013 | 1661 Pine St | Peninsula Custom Construction Inc | new bath & kitchen cabinets, new tile at bathroomnin unit 646Details
new bath & kitchen cabinets, new tile at bathroomnin unit 646 | $27,000 |
| Oct 18, 2012 | Completed final sign-off Nov 2012 | 1661 Pine St | City Building Inc. | # 537: new kitchen and bath cabinets, new tile @ bathDetails
# 537: new kitchen and bath cabinets, new tile @ bath | $18,000 |
| Oct 18, 2012 | Completed final sign-off Nov 2012 | 1661 Pine St | Peninsula Custom Construction Inc | new kitchen & bath cabinets, new tile at bathroomDetails
new kitchen & bath cabinets, new tile at bathroom | $18,000 |
| Jul 31, 2012 | Expired or cancelled expired Aug 2013 | 1661 Pine St | City Building Inc. | # 1244: new kitchen and bath cabinets, new tile at bathsDetails
# 1244: new kitchen and bath cabinets, new tile at baths | $18,000 |
| Jul 31, 2012 | Expired or cancelled expired Aug 2013 | 1661 Pine St | City Building Inc. | #1113: remove kitchen and (2) bath cabinets, new tile at baths.Details
#1113: remove kitchen and (2) bath cabinets, new tile at baths. | $18,000 |
| Apr 24, 2012 | Completed final sign-off Jul 2012 | 1661 Pine St | City Building Inc. | replace 1 kitchen and 1 bath cabinets. new tile, new light fixtures to comply with cec 150k.Details
replace 1 kitchen and 1 bath cabinets. new tile, new light fixtures to comply with cec 150k. | $20,000 |
| Mar 29, 2012 | Completed final sign-off May 2012 | 1661 Pine St | City Building Inc. | abandon one extra bathroom vanity cabinets.(outside of bathroom) cap plumbing in wall. repalce one bathroom door unit#919Details
abandon one extra bathroom vanity cabinets.(outside of bathroom) cap plumbing in wall. repalce one bathroom door unit#919 | $2,000 |
| Mar 27, 2012 | Never finaled issued Mar 2012, no final | 1661 Pine St | street space permit.Details
street space permit. | ||
| Mar 27, 2012 | Completed final sign-off Apr 2012 | 1661 Pine St | Golden Gate Glass And Mirror Co Inc | replace glass overhead above pool - 36 pcs. not visible from street. in kind replacement of glass in (e) opening.Details
replace glass overhead above pool - 36 pcs. not visible from street. in kind replacement of glass in (e) opening. | $75,000 |
| Mar 27, 2012 | Expired or cancelled expired Aug 2013 | 1661 Pine St | City Building Inc. | to comply with complaint # 201204781. new kitchen and bath cabinet, new bath tile units # 738, 533, 639, 936 (all accessible features to remain)Details
to comply with complaint # 201204781. new kitchen and bath cabinet, new bath tile units # 738, 533, 639, 936 (all accessible features to remain) | $40,000 |
| Mar 27, 2012 | Completed final sign-off May 2012 | 1661 Pine St | City Building Inc. | remove single side-wall fire sprinkler from existing closet that is being demolished (remove closet doors); new kitchen and bathroom cabinets (2 baths) in unit 744Details
remove single side-wall fire sprinkler from existing closet that is being demolished (remove closet doors); new kitchen and bathroom cabinets (2 baths) in unit 744 | $18,000 |
| Jan 25, 2012 | Completed final sign-off Mar 2012 | 1661 Pine St | Signs America Inc Dba Sign A Rama | install 1 non illuminated projecting sign.Details
install 1 non illuminated projecting sign. | $500 |
| Oct 5, 2011 | Never finaled issued Oct 2011, no final | 1661 Pine St | street space permitDetails
street space permit | ||
| May 11, 2011 | Completed final sign-off Aug 2011 | 1661 Pine St | Malagic Construction | unit 1034: replace old kitchen cabinets with new. non structural. tile floor, bath new tileDetails
unit 1034: replace old kitchen cabinets with new. non structural. tile floor, bath new tile | $20,000 |
| Mar 22, 2011 | Never finaled issued Mar 2011, no final | 1661 Pine St | street space permitDetails
street space permit |