David Hall
- License
- C25630
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- The Design Partnership Llp
- On San Francisco permits
- Sep 2019 to Mar 2023
4 permits since 2000 (architect on 4 permits): 2 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- City Building Inc. (2), California Professional Builders Inc, Peninsula Custom Construction Inc
- Engineers
- Jesus B Cabellon Jr, Maureen Coffey, Shirling David Scott, Theodore Charles Grabowsky
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 3, 2023 | Completed final sign-off Jun 2023 | 515 Spruce St | City Building Inc. | revision to pa# 202107144350, remove unused showers and create 2 phot-therapy offices.Details
revision to pa# 202107144350, remove unused showers and create 2 phot-therapy offices. | $15,000 |
| Mar 31, 2022 | Completed final sign-off Jun 2023 | 1661 Pine St | Peninsula Custom Construction Inc | construction converts an (e) occupancy (not oshpd/hcai jurisdiction) office/leasing space to a hair salon for residents only. work occurs at an existing fully accessible space at the mezzanine level and is accessed via conforming elevators. show, partial-height wall and dek/casework are to be removeDetails
construction converts an (e) occupancy (not oshpd/hcai jurisdiction) office/leasing space to a hair salon for residents only. work occurs at an existing fully accessible space at the mezzanine level and is accessed via conforming elevators. show, partial-height wall and dek/casework are to be remove | $60,000 |
| Oct 23, 2019 | Never finaled issued Jan 2020, no final | 582 Market St | City Building Inc. | elevator modernization. 13th fl elevator machine room demolished & reconstructed to align to 13th fl. (n) machine room walls and doors. new elevator equipment & controlsDetails
elevator modernization. 13th fl elevator machine room demolished & reconstructed to align to 13th fl. (n) machine room walls and doors. new elevator equipment & controls | $228,237 |
| Sep 10, 2019 | Never finaled issued Apr 2023, no final | 1636 Armstrong Av | California Professional Builders Inc | erect a 1 story, no basement, no dwelling religious/institutional bldg. type bDetails
erect a 1 story, no basement, no dwelling religious/institutional bldg. type b | $1,200,000 |