- Oct 2019 to Dec 2025
6 permits since 2000 (engineer on 6 permits): 3 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- City Building Inc. (2), Dome Construction Corp, Urban West Construction Inc
- Architects
- Paul Cooper (2), Carolyn Kiernat, David Hall, David Hecht
- Engineers
- Aditya Paranjape, Asmi Khoury, Harold Pintes, Jacqueline K. Lingweiluk, Jesus B Cabellon Jr, John Mcdonald, Maryann T. Phipps
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 4
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2025 | In progress filed Dec 2025, not yet issued | 833 Mission St | elevator modernization of 6 tration elevators &1-6. upgrade new machines, new microprocessor based controllers, digital landing equipment, new guide rolles, new equipment in elevator machine room, and new 2-way emergency vidio and text based communication system.Details
elevator modernization of 6 tration elevators &1-6. upgrade new machines, new microprocessor based controllers, digital landing equipment, new guide rolles, new equipment in elevator machine room, and new 2-way emergency vidio and text based communication system. | $1,985,000 | |
| Oct 22, 2025 | In progress filed Oct 2025, not yet issued | 433 Kearny St | elevator modernization of two traction elevator 1 & 2. refurbish hoistway machines, new door operator, new spring roller guides, new normal and terminal switches. new travel cables etc.Details
elevator modernization of two traction elevator 1 & 2. refurbish hoistway machines, new door operator, new spring roller guides, new normal and terminal switches. new travel cables etc. | $2,300,000 | |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 398 Eddy St | Urban West Construction Inc | level 1: phase (1) - new accessible opening between (2) spaces, includes new stair, new lift.Details
level 1: phase (1) - new accessible opening between (2) spaces, includes new stair, new lift. | $250,000 |
| Jun 30, 2022 | Completed final sign-off Jan 2025 | 750 Florida St | Dome Construction Corp | alteration to (e) structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferred: fire protection, life safety. ** ~encrypt&yes **Details
alteration to (e) structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferred: fire protection, life safety. ** ~encrypt&yes ** | $4,800,000 |
| Dec 7, 2020 | Completed final sign-off Apr 2021 | 1890 Sutter St | City Building Inc. | emergency permit to perform dry rot remediation at all corners and west side platform. install footings for new post at north cornersDetails
emergency permit to perform dry rot remediation at all corners and west side platform. install footings for new post at north corners | $20,000 |
| Oct 23, 2019 | Never finaled issued Jan 2020, no final | 582 Market St | City Building Inc. | elevator modernization. 13th fl elevator machine room demolished & reconstructed to align to 13th fl. (n) machine room walls and doors. new elevator equipment & controlsDetails
elevator modernization. 13th fl elevator machine room demolished & reconstructed to align to 13th fl. (n) machine room walls and doors. new elevator equipment & controls | $228,237 |