Nelson T Lewis Const Co Inc.
- Based in
- Hayward
- On San Francisco permits
- Jan 2010 to Sep 2026
- Last 24 months
- 34 permits filed
143 permits since 2000: 133 completed, 3 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 143.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 1661 Pine St | unit1045-remove and replace(e)kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switchDetails
unit1045-remove and replace(e)kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switch | $86,500 |
| Sep 10, 2026 | In progress issued Sep 2026 | 1661 Pine St | unit1019-remove and replace (e) kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switchDetails
unit1019-remove and replace (e) kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switch | $72,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 1661 Pine St | unit 618: remove and replace kitchen cabinets, vanity cabinets in kind, replace electrical sub panel 125 amps, install new ceramic tiles and plumbing fixtures in kind. no wall moving. 1 bathroom and 1 kitchen remodel. no tub conversions.Details
unit 618: remove and replace kitchen cabinets, vanity cabinets in kind, replace electrical sub panel 125 amps, install new ceramic tiles and plumbing fixtures in kind. no wall moving. 1 bathroom and 1 kitchen remodel. no tub conversions. | $75,000 |
| Jun 18, 2026 | Completed final sign-off Aug 2026 | 1661 Pine St | unit 315 - remodel bath in-kind. new plumbing fixtures in-kind kitchen remodel in-kind. replace existing panel w/new 125 amp panel. new cabinets & tile in-kindDetails
unit 315 - remodel bath in-kind. new plumbing fixtures in-kind kitchen remodel in-kind. replace existing panel w/new 125 amp panel. new cabinets & tile in-kind | $72,000 |
| May 29, 2026 | Completed final sign-off Aug 2026 | 1661 Pine St | unit 1014: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 1 bath remodel in kind. kitchen remodel in kind. (no work in sleeping area)Details
unit 1014: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 1 bath remodel in kind. kitchen remodel in kind. (no work in sleeping area) | $72,000 |
| May 29, 2026 | Completed final sign-off Sep 2026 | 1661 Pine St | unit 1013: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 2 baths remodel in kind. kitchen remodel in kind. (no work in sleeping area)Details
unit 1013: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 2 baths remodel in kind. kitchen remodel in kind. (no work in sleeping area) | $92,000 |
| May 5, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | unit 512: 1 kitchen and 1 bathroom remodel, new kitchen cabinets, replace existing subpanel 125 amps. install new ceramic tiles, new shower valves in bathroom. no wall moving.Details
unit 512: 1 kitchen and 1 bathroom remodel, new kitchen cabinets, replace existing subpanel 125 amps. install new ceramic tiles, new shower valves in bathroom. no wall moving. | $72,000 |
| Apr 17, 2026 | Completed final sign-off May 2026 | 3400 Laguna St | to obtain final inspection for work approved under pa# 202303224143. all work is complete.Details
to obtain final inspection for work approved under pa# 202303224143. all work is complete. | |
| Apr 13, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | unit 316: remove and replace existing kitchen and vanity cabinets in kind. electric panel to be replaced w 125 amp panel. new ceramic tile and plumbing fixtures. no wall changes. 1 bath remodel in kind. kitchen remodel in kind.Details
unit 316: remove and replace existing kitchen and vanity cabinets in kind. electric panel to be replaced w 125 amp panel. new ceramic tile and plumbing fixtures. no wall changes. 1 bath remodel in kind. kitchen remodel in kind. | $82,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | #1341: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 2.5 bath remodel in kind. kitchen remodel in kind.Details
#1341: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 2.5 bath remodel in kind. kitchen remodel in kind. | $89,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | #327: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 1.5 bath remodel in kind. kitchen remodel in kind.Details
#327: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 1.5 bath remodel in kind. kitchen remodel in kind. | $70,000 |
| Jan 23, 2026 | Completed final sign-off Apr 2026 | 1661 Pine St | unit 933: remove and replace kitchen and vanity cabinets in kind, replace electrical panel with 125 amp panel, install new tiles and plumbing fixtures in bathrooms. 1 bathroom and 1 kitchen remodel. no change in plumbing fixture count.Details
unit 933: remove and replace kitchen and vanity cabinets in kind, replace electrical panel with 125 amp panel, install new tiles and plumbing fixtures in bathrooms. 1 bathroom and 1 kitchen remodel. no change in plumbing fixture count. | $89,000 |
| Jan 23, 2026 | Completed final sign-off Apr 2026 | 1661 Pine St | unit 1136: remove and replace kitchen and vanity cabinets, in kind, existing electrical panel to be replaced 125 amps. install new tiles and plumbing fixtures, bathroom, no wall moving, 2 bath remodels and 1 kitchen remodel.Details
unit 1136: remove and replace kitchen and vanity cabinets, in kind, existing electrical panel to be replaced 125 amps. install new tiles and plumbing fixtures, bathroom, no wall moving, 2 bath remodels and 1 kitchen remodel. | $89,000 |
| Dec 8, 2025 | Completed final sign-off Feb 2026 | 1661 Pine St | unit # 1034: remove (e) kitchen + vanity cabs, replace in kind. replace (e) elec panel w/ new 125 amp panel. install new ceramic tile + plumbing fixtures. no wall moving. replace (e) shower w/ new ceramic tile shower. one kitchen remodel in kind. all (e) accessiblity features to remain.Details
unit # 1034: remove (e) kitchen + vanity cabs, replace in kind. replace (e) elec panel w/ new 125 amp panel. install new ceramic tile + plumbing fixtures. no wall moving. replace (e) shower w/ new ceramic tile shower. one kitchen remodel in kind. all (e) accessiblity features to remain. | $84,900 |
| Nov 13, 2025 | Expired or cancelled withdrawn Dec 2025 | 1661 Pine St | unit# 1034: kitchen remodel with cabinets replaced inkind & bathroom remodel- tub to shower, install ceramic tile & plumbing fixtures. changing electrical panel to 125amp.Details
unit# 1034: kitchen remodel with cabinets replaced inkind & bathroom remodel- tub to shower, install ceramic tile & plumbing fixtures. changing electrical panel to 125amp. | $84,000 |
| Nov 10, 2025 | Completed final sign-off Feb 2026 | 3400 Laguna St | 4th/fl: units 405(p) & 406(p): two studio unit(s): combine into a one bedroom unit. conversion of bathroom into kichenette. no exterior work.Details
4th/fl: units 405(p) & 406(p): two studio unit(s): combine into a one bedroom unit. conversion of bathroom into kichenette. no exterior work. | $75,000 |
| Sep 23, 2025 | Completed final sign-off Jan 2026 | 1661 Pine St | #646. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, 2.5 bath remodel in kind, kitchen remodel in kind. existing accessibilty features to be maintainedDetails
#646. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, 2.5 bath remodel in kind, kitchen remodel in kind. existing accessibilty features to be maintained | $89,000 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 1661 Pine St | unit #518: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind.Details
unit #518: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind. | $84,900 |
| Sep 23, 2025 | Expired or cancelled cancelled Jan 2026 | 1661 Pine St | unit #535: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind.Details
unit #535: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind. | $84,900 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 1661 Pine St | #531. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, one bath remodel in kind, kitchen remodel in kind. accessibility features to be maintainedDetails
#531. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, one bath remodel in kind, kitchen remodel in kind. accessibility features to be maintained | $84,900 |
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 1661 Pine St | apt 428: kitchen and bath remodel in kind. existing electrical panel to be replaced with 125 amp panel. intsall new ceramic tiles, plumbing fixtures. no walls being moved.Details
apt 428: kitchen and bath remodel in kind. existing electrical panel to be replaced with 125 amp panel. intsall new ceramic tiles, plumbing fixtures. no walls being moved. | $84,900 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 1661 Pine St | unit 524; remove(e) kitchen and vanity cabinets. replace in kind. (e) electrical panel to be replaced with new 125amp panel. install new ceramic tile and plumbing fixtures. no walls moving.Details
unit 524; remove(e) kitchen and vanity cabinets. replace in kind. (e) electrical panel to be replaced with new 125amp panel. install new ceramic tile and plumbing fixtures. no walls moving. | $79,800 |
| Jul 9, 2025 | Completed final sign-off Jan 2026 | 3400 Laguna St | 2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change.Details
2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change. | $80,000 |
| Jun 20, 2025 | Completed final sign-off Sep 2025 | 3400 Laguna St | 3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work.Details
3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work. | $107,160 |
| May 23, 2025 | Completed final sign-off Aug 2025 | 1661 Pine St | unit 416. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom remodel in kind.Details
unit 416. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom remodel in kind. | $78,900 |
| May 23, 2025 | Completed final sign-off Jul 2025 | 1661 Pine St | unit 715. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom in kind.Details
unit 715. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom in kind. | $79,800 |
| Apr 21, 2025 | Completed final sign-off Jun 2025 | 1661 Pine St | unit 931 - remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic toilet plumbing fixtures. no walls moving.Details
unit 931 - remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic toilet plumbing fixtures. no walls moving. | $79,800 |
| Apr 4, 2025 | Completed final sign-off Aug 2025 | 1661 Pine St | unit #1023: remove kitchen & vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install ceramic tile & plumbing fixtures. no walls movingDetails
unit #1023: remove kitchen & vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install ceramic tile & plumbing fixtures. no walls moving | $89,000 |
| Mar 13, 2025 | Completed final sign-off May 2025 | 1661 Pine St | apt #1018: remove kitchen and vanity cabinets replae in kind (e) electrical panel to be replaced with new 125 amp panel install new ceramic tile and plumbing fixtures no wall movingDetails
apt #1018: remove kitchen and vanity cabinets replae in kind (e) electrical panel to be replaced with new 125 amp panel install new ceramic tile and plumbing fixtures no wall moving | $72,400 |
| Mar 5, 2025 | Completed final sign-off May 2025 | 1661 Pine St | unit 528- remove kitchen and vanity cabinets, replace in kind (e) 125 amp subpanel. install (n) ceramic tile and plubming fixtures. no walls moving or layout changeDetails
unit 528- remove kitchen and vanity cabinets, replace in kind (e) 125 amp subpanel. install (n) ceramic tile and plubming fixtures. no walls moving or layout change | $83,200 |
| Feb 10, 2025 | Completed final sign-off Apr 2025 | 1661 Pine St | unit #1035: remove & replace kitchen cabinets in kind both vanities to be replaced in kind (e) elec panel to be replaced w/new 125 amp panel, install new plumbing fixutres and ceramic tile. no walls movedDetails
unit #1035: remove & replace kitchen cabinets in kind both vanities to be replaced in kind (e) elec panel to be replaced w/new 125 amp panel, install new plumbing fixutres and ceramic tile. no walls moved | $83,000 |
| Dec 26, 2024 | Completed final sign-off Mar 2025 | 1661 Pine St | unit # 928 remove and replace in kind kitchen and vanity cabinets, (e) electrical panel to be replaced with new 125 amp panel install new plumbing fixtures and ceramic tile (no walls are moving).Details
unit # 928 remove and replace in kind kitchen and vanity cabinets, (e) electrical panel to be replaced with new 125 amp panel install new plumbing fixtures and ceramic tile (no walls are moving). | $81,000 |
| Nov 15, 2024 | Completed final sign-off Apr 2025 | 1661 Pine St | 11th floor unit 1143: remove and replace kitchen cabinets in kind. remove and replace both vanities in kind. (e) electrical panel to be replaced with (n) 125amp panel. install new tile and plumbing fixtures at bathrooms. no wall demolition or construction.Details
11th floor unit 1143: remove and replace kitchen cabinets in kind. remove and replace both vanities in kind. (e) electrical panel to be replaced with (n) 125amp panel. install new tile and plumbing fixtures at bathrooms. no wall demolition or construction. | $88,000 |
| Oct 22, 2024 | Completed final sign-off Jun 2025 | 3400 Laguna St | 4/fl- ref 202405313387- plumbing and electrical workDetails
4/fl- ref 202405313387- plumbing and electrical work | $44,600 |
| Aug 12, 2024 | Completed final sign-off May 2026 | 3400 Laguna St | revision to pa # 2023-0322-4143 changing the (e) elevator cab & scissor gate doors; tracks, hardware. coordinate extent of demo with new replacement cab. basements, 1st, 2nd & 3rd flDetails
revision to pa # 2023-0322-4143 changing the (e) elevator cab & scissor gate doors; tracks, hardware. coordinate extent of demo with new replacement cab. basements, 1st, 2nd & 3rd fl | $150,000 |
| May 31, 2024 | Completed final sign-off Jun 2025 | 3400 Laguna St | unit 423: remodel of (e) independent living unit into a laundry room. (n) lighting, casewood, finishes, fixtures, washing machine plumbing connections. electrical dryer power receptacles & exhaust ducts through the roof.Details
unit 423: remodel of (e) independent living unit into a laundry room. (n) lighting, casewood, finishes, fixtures, washing machine plumbing connections. electrical dryer power receptacles & exhaust ducts through the roof. | $61,250 |
| May 24, 2024 | Completed final sign-off Jan 2025 | 3400 Laguna St | 3rd fl, unit 327 remodel & expansion of (e) bath; remodel of (e) closet and cosmetic renotations of living area. work includes new lights, casework, finishes and fixturesDetails
3rd fl, unit 327 remodel & expansion of (e) bath; remodel of (e) closet and cosmetic renotations of living area. work includes new lights, casework, finishes and fixtures | $62,500 |
| May 23, 2024 | Completed final sign-off Jan 2025 | 3400 Laguna St | unit 213: remodel & expansion of e) bath. remodel of e) closet & cosmetic renovation of living area including new lighting, casework, finishes & fixturesDetails
unit 213: remodel & expansion of e) bath. remodel of e) closet & cosmetic renovation of living area including new lighting, casework, finishes & fixtures | $64,500 |
| May 10, 2024 | Completed final sign-off Sep 2024 | 1661 Pine St | 6th fl- unit 632- replace kitchen cabinets in kind. replace 1 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel. no change to orignal floor plan layoutDetails
6th fl- unit 632- replace kitchen cabinets in kind. replace 1 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel. no change to orignal floor plan layout | $69,000 |
| May 10, 2024 | Completed final sign-off Dec 2024 | 1661 Pine St | 7th fl- unit 746- replace kitchen cabinets in kind. replace bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanelDetails
7th fl- unit 746- replace kitchen cabinets in kind. replace bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel | $89,000 |
| May 10, 2024 | Completed final sign-off Dec 2024 | 1661 Pine St | 8th fl- unit 845- replace kitchen cabinets in kind. replace 2 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel no change to original floor plan layoutDetails
8th fl- unit 845- replace kitchen cabinets in kind. replace 2 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel no change to original floor plan layout | $91,000 |
| May 10, 2024 | Completed final sign-off Jul 2024 | 1661 Pine St | 5th fl- unit 525- replace kitchen cabinets in kind. replace two bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanelDetails
5th fl- unit 525- replace kitchen cabinets in kind. replace two bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel | $76,000 |
| Mar 5, 2024 | Completed final sign-off May 2024 | 1661 Pine St | 4th floor: apt #424: remove and replace in kind kitchen cabinets. extg electrical panel, replace with new 125 amp panel. install new tile and plumbing fixtures. no walls are moved. bathroom tile replacement (existing toilet and vanity to remain)Details
4th floor: apt #424: remove and replace in kind kitchen cabinets. extg electrical panel, replace with new 125 amp panel. install new tile and plumbing fixtures. no walls are moved. bathroom tile replacement (existing toilet and vanity to remain) | $73,000 |
| Feb 8, 2024 | Completed final sign-off Jun 2024 | 1661 Pine St | 10th fl. unit 1027: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving)Details
10th fl. unit 1027: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving) | $84,000 |
| Feb 8, 2024 | Completed final sign-off Apr 2024 | 1661 Pine St | 10th fl. unit 1010: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving)Details
10th fl. unit 1010: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving) | $69,000 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | unit 1028: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 1028: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $81,000 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | unit 523: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 523: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $68,500 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | unit 734: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 734: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $69,200 |
| Nov 7, 2023 | Completed final sign-off Feb 2024 | 1661 Pine St | unit 510: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixturs at bathroom. no wall moving or structural work.Details
unit 510: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixturs at bathroom. no wall moving or structural work. | $41,500 |
| Nov 7, 2023 | Completed final sign-off Feb 2024 | 1661 Pine St | unit 331: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixtures at bathroom. no wall moving or structural work.Details
unit 331: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixtures at bathroom. no wall moving or structural work. | $41,500 |
| Sep 12, 2023 | Completed final sign-off Nov 2023 | 3400 Laguna St | 3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures.Details
3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures. | $78,000 |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1661 Pine St | unit # 725 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 725 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $88,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | unit # 438 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 438 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $76,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | unit # 436 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 436 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $72,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | unit # 538 (5th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 538 (5th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $76,000 |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1661 Pine St | unit # 737 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 737 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $88,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | unit # 1033 (10th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 1033 (10th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $69,000 |
| Mar 22, 2023 | Expired or cancelled expired May 2026 | 3400 Laguna St | replace existing passenger elevator manual cab and hoistway doors with auto sliding doors.Details
replace existing passenger elevator manual cab and hoistway doors with auto sliding doors. | $250,000 |
| Mar 10, 2023 | Completed final sign-off May 2023 | 3400 Laguna St | 1/f unit# 113: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area).Details
1/f unit# 113: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area). | $76,000 |
| Mar 10, 2023 | Completed final sign-off May 2023 | 3400 Laguna St | 1/f unit# 103: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area).Details
1/f unit# 103: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area). | $82,000 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 3400 Laguna St | 2/fl unit 246m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area.Details
2/fl unit 246m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area. | $80,100 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 3400 Laguna St | 3/fl unit 329m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area.Details
3/fl unit 329m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area. | $79,400 |
| Apr 21, 2022 | Completed final sign-off Aug 2022 | 3400 Laguna St | 4th flr: combination of (3) studio units to one (2) bedroom (2) bathroom, unit renovations addition of new kitchenette, cosmetic renovations of (n) lighting, casework, finished and fixtures.Details
4th flr: combination of (3) studio units to one (2) bedroom (2) bathroom, unit renovations addition of new kitchenette, cosmetic renovations of (n) lighting, casework, finished and fixtures. | $140,000 |
| Jan 22, 2021 | Never finaled filed Jan 2021, never issued | 445 Wawona St | alteration to 2nd floor west wing of (e) residential care facility (not licensed by gov't agency). scope includes interior renovation, minor window replacement, & related mech, electrical, & plumbing work. no change in use.Details
alteration to 2nd floor west wing of (e) residential care facility (not licensed by gov't agency). scope includes interior renovation, minor window replacement, & related mech, electrical, & plumbing work. no change in use. | $1,300,000 |
| Dec 28, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures.Details
unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures. | $38,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | 2nd fl, unit 224 assisted living unit - remodel and expansion of existing bath. remodel of existing closet & cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. no exterior workDetails
2nd fl, unit 224 assisted living unit - remodel and expansion of existing bath. remodel of existing closet & cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. no exterior work | $98,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | (unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work.Details
(unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work. | $60,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 3400 Laguna St | 2nd floor: suites 204,205,& 206: extg occupancy class r-2.1 property (no change of use) combining 3 studio units to one (1) 2 bedroom two bathroom unit. renovation includes addition of new kitchenette, cosmetic renovation of extg bath at unit 205, nw lighting, casework, finishes, and fixtures.Details
2nd floor: suites 204,205,& 206: extg occupancy class r-2.1 property (no change of use) combining 3 studio units to one (1) 2 bedroom two bathroom unit. renovation includes addition of new kitchenette, cosmetic renovation of extg bath at unit 205, nw lighting, casework, finishes, and fixtures. | $160,000 |
| Jul 7, 2020 | Completed final sign-off Nov 2020 | 3400 Laguna St | 4th floor: suites 403 & 404: extg occupancy class r-2.1 property (no change of use) combining units 403 & 404. cosmetic renovation of extg bathroom, and extg kitchenette at unit 403. remodel of extg bathroom at unit 403.remodel & expansion of extg bath, remodel expansion of closet at unit 404.Details
4th floor: suites 403 & 404: extg occupancy class r-2.1 property (no change of use) combining units 403 & 404. cosmetic renovation of extg bathroom, and extg kitchenette at unit 403. remodel of extg bathroom at unit 403.remodel & expansion of extg bath, remodel expansion of closet at unit 404. | $174,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 3400 Laguna St | 3rd floor: suites 307 & 308: extg occupancy class r-2.1 property (no change of use) combining 307 & 308 into a 2 bedroom, 1 & 1/2 bath unit. remodel of extg bedroom at unit 308. work includes nw lighting, casework, finishes, and fixtures.Details
3rd floor: suites 307 & 308: extg occupancy class r-2.1 property (no change of use) combining 307 & 308 into a 2 bedroom, 1 & 1/2 bath unit. remodel of extg bedroom at unit 308. work includes nw lighting, casework, finishes, and fixtures. | $95,000 |
| Feb 18, 2020 | Completed final sign-off Jun 2020 | 3400 Laguna St | 2nd fl, unit 230 remodel & expansion of existing bath. remodel (e) closet & cosmetic renovation of living area. work includes (n) lighting, casework, finishes & fixtures sq ft area unit does not change interior onlyDetails
2nd fl, unit 230 remodel & expansion of existing bath. remodel (e) closet & cosmetic renovation of living area. work includes (n) lighting, casework, finishes & fixtures sq ft area unit does not change interior only | $20,000 |
| Oct 22, 2019 | Completed final sign-off Jan 2020 | 3400 Laguna St | apt 245: remodel of (e) bath remodel of (e) closet & cosmetic renovations of living area, work includes, new lighting, casework, finishes and fixtures. maher n/a.Details
apt 245: remodel of (e) bath remodel of (e) closet & cosmetic renovations of living area, work includes, new lighting, casework, finishes and fixtures. maher n/a. | $125,000 |
| Jul 8, 2019 | Completed final sign-off Sep 2019 | 3400 Laguna St | #405: remodel and expansion of existing bath. remodel of (e) closet and cosmetic renovations of living area. new lighting, casework, finishes & fixtures.Details
#405: remodel and expansion of existing bath. remodel of (e) closet and cosmetic renovations of living area. new lighting, casework, finishes & fixtures. | $5,000 |
| Jul 8, 2019 | Completed final sign-off Sep 2019 | 3400 Laguna St | #318: remodel of existing bath, remodel of existing closet & cosmetic renovations of living area, work includes new lighting, finishes & casework.Details
#318: remodel of existing bath, remodel of existing closet & cosmetic renovations of living area, work includes new lighting, finishes & casework. | $5,000 |
| Jun 6, 2019 | Completed final sign-off Jun 2019 | 3400 Laguna St | admin correction to record. units 319/320 combine into one unit. reduction of unit count correction. reference #201812118021.Details
admin correction to record. units 319/320 combine into one unit. reduction of unit count correction. reference #201812118021. | |
| Mar 14, 2019 | Completed final sign-off May 2019 | 3400 Laguna St | unit 420. remodel and expansion of (e) bath, remodel (e) closet and cosmetic renovations of living area, new lighting, casework, finishes and fixturesDetails
unit 420. remodel and expansion of (e) bath, remodel (e) closet and cosmetic renovations of living area, new lighting, casework, finishes and fixtures | $5,000 |
| Dec 11, 2018 | Completed final sign-off Apr 2019 | 3400 Laguna St | unit #409: remodel and expansion of extg bath, remodel of extg closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures.Details
unit #409: remodel and expansion of extg bath, remodel of extg closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. | $102,000 |
| Dec 11, 2018 | Completed final sign-off Jun 2019 | 3400 Laguna St | revision to app#201809170424(cottage) in lieu of new 6 3/4 x 15 gl beam, posts, and footings, provide new 2x12 and attach to extg 4x12. n/a for maherDetails
revision to app#201809170424(cottage) in lieu of new 6 3/4 x 15 gl beam, posts, and footings, provide new 2x12 and attach to extg 4x12. n/a for maher | |
| Dec 11, 2018 | Completed final sign-off Jun 2019 | 3400 Laguna St | unit #318/320: combine a 1 bedroom/1 bath and a studio unit into a 2 bedroom/2 bath unit. n/a for maherDetails
unit #318/320: combine a 1 bedroom/1 bath and a studio unit into a 2 bedroom/2 bath unit. n/a for maher | $28,000 |
| Nov 14, 2018 | Completed final sign-off Apr 2019 | 3400 Laguna St | revision to pa #20185300529 - change in restroom door swings.Details
revision to pa #20185300529 - change in restroom door swings. | |
| Sep 27, 2018 | Completed final sign-off Nov 2018 | 3400 Laguna St | unit 108. remodel and expansion of (e) bath. remodel of (e) closet and cosmetic renovations of living area w/ (n) lighting, casework finishes and fixtures. maher n/aDetails
unit 108. remodel and expansion of (e) bath. remodel of (e) closet and cosmetic renovations of living area w/ (n) lighting, casework finishes and fixtures. maher n/a | $98,000 |
| Sep 27, 2018 | Completed final sign-off Jan 2019 | 3400 Laguna St | unit 225. remodel of (e) bath and closet. cosmetic renovation of living area w/ (n) lighting, casework and finishes and fixtures. maher n/aDetails
unit 225. remodel of (e) bath and closet. cosmetic renovation of living area w/ (n) lighting, casework and finishes and fixtures. maher n/a | $125,000 |
| Sep 17, 2018 | Completed final sign-off Jun 2019 | 3400 Laguna St | interior renovation of (e) cottage building. removal & additional of non-structural partition walls. replacement of 1 exterior ramp & railing & replacement of (e) wood fence. maher n/a.Details
interior renovation of (e) cottage building. removal & additional of non-structural partition walls. replacement of 1 exterior ramp & railing & replacement of (e) wood fence. maher n/a. | $150,000 |
| Jul 11, 2018 | Completed final sign-off Sep 2018 | 3400 Laguna St | remodel of (e) bathroom. remodel of (e) closet and comsetic renvovations of living space. new lighting, casework, finished and fixtures.Details
remodel of (e) bathroom. remodel of (e) closet and comsetic renvovations of living space. new lighting, casework, finished and fixtures. | $80,000 |
| May 30, 2018 | Completed final sign-off Aug 2018 | 3400 Laguna St | unit 319: remodel of (e) bath. remodel of (e) closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. verify fire alarm complies with sffc 1103.7.6.1 maher naDetails
unit 319: remodel of (e) bath. remodel of (e) closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. verify fire alarm complies with sffc 1103.7.6.1 maher na | $80,000 |
| May 30, 2018 | Completed final sign-off Apr 2019 | 3400 Laguna St | renovation of 2 (e) restrooms, scope of work includes replacement of fixtures and fittings in kind and replacement of interior finishes maher naDetails
renovation of 2 (e) restrooms, scope of work includes replacement of fixtures and fittings in kind and replacement of interior finishes maher na | $50,000 |
| May 18, 2018 | Completed final sign-off Jul 2018 | 3400 Laguna St | remodel of existing bath, closet, cometic renovation at living area includes new elec. lighting, finishing plumbingDetails
remodel of existing bath, closet, cometic renovation at living area includes new elec. lighting, finishing plumbing | $80,000 |
| Feb 26, 2018 | Completed final sign-off May 2018 | 3400 Laguna St | unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures.Details
unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures. | $100,000 |
| Feb 26, 2018 | Completed final sign-off Apr 2018 | 3400 Laguna St | unit 419 remodel of extg bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures.Details
unit 419 remodel of extg bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures. | $75,000 |
| Feb 16, 2018 | Completed final sign-off Apr 2018 | 3400 Laguna St | unit #227- cosmetic renovation of living room & bathroom.Details
unit #227- cosmetic renovation of living room & bathroom. | $80,000 |
| Aug 31, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na.Details
unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na. | $120,000 |
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 3400 Laguna St | #120- remodel & expansion of (e) bath, remodel of (e) closet and cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13Details
#120- remodel & expansion of (e) bath, remodel of (e) closet and cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13 | $90,000 |
| Aug 17, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | #328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13Details
#328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13 | $120,000 |
| Jun 29, 2017 | Completed final sign-off Nov 2017 | 3400 Laguna St | unit 105: remodel and expand (e) bath. remodel e closet. cosmetic renovations at living area. work includes lighting, casework, finishes, fixturesDetails
unit 105: remodel and expand (e) bath. remodel e closet. cosmetic renovations at living area. work includes lighting, casework, finishes, fixtures | $200,000 |
| May 17, 2017 | Completed final sign-off Oct 2017 | 3400 Laguna St | unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307Details
unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307 | $100,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3400 Laguna St | unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer.Details
unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer. | $50,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3400 Laguna St | unit #241 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. n/a maherDetails
unit #241 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. n/a maher | $50,000 |
| Mar 31, 2017 | Completed final sign-off Jul 2017 | 3400 Laguna St | unit 109: remodel and expansion of extg bath. remodel closet. cosmetic renovation of living area. n/a for maher.Details
unit 109: remodel and expansion of extg bath. remodel closet. cosmetic renovation of living area. n/a for maher. | $40,000 |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 1400 Geary Bl | 7th flr: unit 7j - revision to 201612165232: cooktop and fan removed from project. mechanical removed. adding electrical. kitchenetter was moved creating a denDetails
7th flr: unit 7j - revision to 201612165232: cooktop and fan removed from project. mechanical removed. adding electrical. kitchenetter was moved creating a den | |
| Mar 15, 2017 | Completed final sign-off May 2017 | 1400 Geary Bl | 4th floor, unit 403 interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior workDetails
4th floor, unit 403 interior remodel, replace plumbing fixtures, install, shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work | $45,000 |