Back to bathroom remodel contractors
Nelson T Lewis Const Co Inc.
- Based in
- Hayward
- On San Francisco permits
- Jan 2010 to Sep 2026
- Last 24 months
- 34 permits filed
143 permits since 2000: 133 completed, 3 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
94 bathroom remodel permits: 87 completed, 3 in progress, 4 expired or cancelled. Typically 7 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 1661 Pine St | unit1045-remove and replace(e)kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switchDetails
unit1045-remove and replace(e)kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switch | $86,500 |
| Sep 10, 2026 | In progress issued Sep 2026 | 1661 Pine St | unit1019-remove and replace (e) kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switchDetails
unit1019-remove and replace (e) kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switch | $72,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 1661 Pine St | unit 618: remove and replace kitchen cabinets, vanity cabinets in kind, replace electrical sub panel 125 amps, install new ceramic tiles and plumbing fixtures in kind. no wall moving. 1 bathroom and 1 kitchen remodel. no tub conversions.Details
unit 618: remove and replace kitchen cabinets, vanity cabinets in kind, replace electrical sub panel 125 amps, install new ceramic tiles and plumbing fixtures in kind. no wall moving. 1 bathroom and 1 kitchen remodel. no tub conversions. | $75,000 |
| Jun 18, 2026 | Completed final sign-off Aug 2026 | 1661 Pine St | unit 315 - remodel bath in-kind. new plumbing fixtures in-kind kitchen remodel in-kind. replace existing panel w/new 125 amp panel. new cabinets & tile in-kindDetails
unit 315 - remodel bath in-kind. new plumbing fixtures in-kind kitchen remodel in-kind. replace existing panel w/new 125 amp panel. new cabinets & tile in-kind | $72,000 |
| May 29, 2026 | Completed final sign-off Aug 2026 | 1661 Pine St | unit 1014: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 1 bath remodel in kind. kitchen remodel in kind. (no work in sleeping area)Details
unit 1014: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 1 bath remodel in kind. kitchen remodel in kind. (no work in sleeping area) | $72,000 |
| May 29, 2026 | Completed final sign-off Sep 2026 | 1661 Pine St | unit 1013: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 2 baths remodel in kind. kitchen remodel in kind. (no work in sleeping area)Details
unit 1013: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 2 baths remodel in kind. kitchen remodel in kind. (no work in sleeping area) | $92,000 |
| May 5, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | unit 512: 1 kitchen and 1 bathroom remodel, new kitchen cabinets, replace existing subpanel 125 amps. install new ceramic tiles, new shower valves in bathroom. no wall moving.Details
unit 512: 1 kitchen and 1 bathroom remodel, new kitchen cabinets, replace existing subpanel 125 amps. install new ceramic tiles, new shower valves in bathroom. no wall moving. | $72,000 |
| Apr 13, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | unit 316: remove and replace existing kitchen and vanity cabinets in kind. electric panel to be replaced w 125 amp panel. new ceramic tile and plumbing fixtures. no wall changes. 1 bath remodel in kind. kitchen remodel in kind.Details
unit 316: remove and replace existing kitchen and vanity cabinets in kind. electric panel to be replaced w 125 amp panel. new ceramic tile and plumbing fixtures. no wall changes. 1 bath remodel in kind. kitchen remodel in kind. | $82,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | #1341: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 2.5 bath remodel in kind. kitchen remodel in kind.Details
#1341: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 2.5 bath remodel in kind. kitchen remodel in kind. | $89,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | #327: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 1.5 bath remodel in kind. kitchen remodel in kind.Details
#327: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 1.5 bath remodel in kind. kitchen remodel in kind. | $70,000 |
| Jan 23, 2026 | Completed final sign-off Apr 2026 | 1661 Pine St | unit 933: remove and replace kitchen and vanity cabinets in kind, replace electrical panel with 125 amp panel, install new tiles and plumbing fixtures in bathrooms. 1 bathroom and 1 kitchen remodel. no change in plumbing fixture count.Details
unit 933: remove and replace kitchen and vanity cabinets in kind, replace electrical panel with 125 amp panel, install new tiles and plumbing fixtures in bathrooms. 1 bathroom and 1 kitchen remodel. no change in plumbing fixture count. | $89,000 |
| Jan 23, 2026 | Completed final sign-off Apr 2026 | 1661 Pine St | unit 1136: remove and replace kitchen and vanity cabinets, in kind, existing electrical panel to be replaced 125 amps. install new tiles and plumbing fixtures, bathroom, no wall moving, 2 bath remodels and 1 kitchen remodel.Details
unit 1136: remove and replace kitchen and vanity cabinets, in kind, existing electrical panel to be replaced 125 amps. install new tiles and plumbing fixtures, bathroom, no wall moving, 2 bath remodels and 1 kitchen remodel. | $89,000 |
| Nov 13, 2025 | Expired or cancelled withdrawn Dec 2025 | 1661 Pine St | unit# 1034: kitchen remodel with cabinets replaced inkind & bathroom remodel- tub to shower, install ceramic tile & plumbing fixtures. changing electrical panel to 125amp.Details
unit# 1034: kitchen remodel with cabinets replaced inkind & bathroom remodel- tub to shower, install ceramic tile & plumbing fixtures. changing electrical panel to 125amp. | $84,000 |
| Nov 10, 2025 | Completed final sign-off Feb 2026 | 3400 Laguna St | 4th/fl: units 405(p) & 406(p): two studio unit(s): combine into a one bedroom unit. conversion of bathroom into kichenette. no exterior work.Details
4th/fl: units 405(p) & 406(p): two studio unit(s): combine into a one bedroom unit. conversion of bathroom into kichenette. no exterior work. | $75,000 |
| Sep 23, 2025 | Expired or cancelled cancelled Jan 2026 | 1661 Pine St | unit #535: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind.Details
unit #535: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind. | $84,900 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 1661 Pine St | #531. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, one bath remodel in kind, kitchen remodel in kind. accessibility features to be maintainedDetails
#531. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, one bath remodel in kind, kitchen remodel in kind. accessibility features to be maintained | $84,900 |
| Sep 23, 2025 | Completed final sign-off Jan 2026 | 1661 Pine St | #646. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, 2.5 bath remodel in kind, kitchen remodel in kind. existing accessibilty features to be maintainedDetails
#646. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, 2.5 bath remodel in kind, kitchen remodel in kind. existing accessibilty features to be maintained | $89,000 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 1661 Pine St | unit #518: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind.Details
unit #518: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind. | $84,900 |
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 1661 Pine St | apt 428: kitchen and bath remodel in kind. existing electrical panel to be replaced with 125 amp panel. intsall new ceramic tiles, plumbing fixtures. no walls being moved.Details
apt 428: kitchen and bath remodel in kind. existing electrical panel to be replaced with 125 amp panel. intsall new ceramic tiles, plumbing fixtures. no walls being moved. | $84,900 |
| Jul 9, 2025 | Completed final sign-off Jan 2026 | 3400 Laguna St | 2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change.Details
2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change. | $80,000 |
| Jun 20, 2025 | Completed final sign-off Sep 2025 | 3400 Laguna St | 3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work.Details
3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work. | $107,160 |
| May 23, 2025 | Completed final sign-off Jul 2025 | 1661 Pine St | unit 715. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom in kind.Details
unit 715. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom in kind. | $79,800 |
| May 23, 2025 | Completed final sign-off Aug 2025 | 1661 Pine St | unit 416. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom remodel in kind.Details
unit 416. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom remodel in kind. | $78,900 |
| Nov 15, 2024 | Completed final sign-off Apr 2025 | 1661 Pine St | 11th floor unit 1143: remove and replace kitchen cabinets in kind. remove and replace both vanities in kind. (e) electrical panel to be replaced with (n) 125amp panel. install new tile and plumbing fixtures at bathrooms. no wall demolition or construction.Details
11th floor unit 1143: remove and replace kitchen cabinets in kind. remove and replace both vanities in kind. (e) electrical panel to be replaced with (n) 125amp panel. install new tile and plumbing fixtures at bathrooms. no wall demolition or construction. | $88,000 |
| May 24, 2024 | Completed final sign-off Jan 2025 | 3400 Laguna St | 3rd fl, unit 327 remodel & expansion of (e) bath; remodel of (e) closet and cosmetic renotations of living area. work includes new lights, casework, finishes and fixturesDetails
3rd fl, unit 327 remodel & expansion of (e) bath; remodel of (e) closet and cosmetic renotations of living area. work includes new lights, casework, finishes and fixtures | $62,500 |
| May 23, 2024 | Completed final sign-off Jan 2025 | 3400 Laguna St | unit 213: remodel & expansion of e) bath. remodel of e) closet & cosmetic renovation of living area including new lighting, casework, finishes & fixturesDetails
unit 213: remodel & expansion of e) bath. remodel of e) closet & cosmetic renovation of living area including new lighting, casework, finishes & fixtures | $64,500 |
| May 10, 2024 | Completed final sign-off Sep 2024 | 1661 Pine St | 6th fl- unit 632- replace kitchen cabinets in kind. replace 1 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel. no change to orignal floor plan layoutDetails
6th fl- unit 632- replace kitchen cabinets in kind. replace 1 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel. no change to orignal floor plan layout | $69,000 |
| May 10, 2024 | Completed final sign-off Dec 2024 | 1661 Pine St | 7th fl- unit 746- replace kitchen cabinets in kind. replace bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanelDetails
7th fl- unit 746- replace kitchen cabinets in kind. replace bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel | $89,000 |
| May 10, 2024 | Completed final sign-off Dec 2024 | 1661 Pine St | 8th fl- unit 845- replace kitchen cabinets in kind. replace 2 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel no change to original floor plan layoutDetails
8th fl- unit 845- replace kitchen cabinets in kind. replace 2 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel no change to original floor plan layout | $91,000 |
| May 10, 2024 | Completed final sign-off Jul 2024 | 1661 Pine St | 5th fl- unit 525- replace kitchen cabinets in kind. replace two bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanelDetails
5th fl- unit 525- replace kitchen cabinets in kind. replace two bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel | $76,000 |
| Mar 5, 2024 | Completed final sign-off May 2024 | 1661 Pine St | 4th floor: apt #424: remove and replace in kind kitchen cabinets. extg electrical panel, replace with new 125 amp panel. install new tile and plumbing fixtures. no walls are moved. bathroom tile replacement (existing toilet and vanity to remain)Details
4th floor: apt #424: remove and replace in kind kitchen cabinets. extg electrical panel, replace with new 125 amp panel. install new tile and plumbing fixtures. no walls are moved. bathroom tile replacement (existing toilet and vanity to remain) | $73,000 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | unit 1028: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 1028: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $81,000 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | unit 734: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 734: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $69,200 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | unit 523: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 523: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $68,500 |
| Nov 7, 2023 | Completed final sign-off Feb 2024 | 1661 Pine St | unit 510: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixturs at bathroom. no wall moving or structural work.Details
unit 510: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixturs at bathroom. no wall moving or structural work. | $41,500 |
| Nov 7, 2023 | Completed final sign-off Feb 2024 | 1661 Pine St | unit 331: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixtures at bathroom. no wall moving or structural work.Details
unit 331: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixtures at bathroom. no wall moving or structural work. | $41,500 |
| Sep 12, 2023 | Completed final sign-off Nov 2023 | 3400 Laguna St | 3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures.Details
3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures. | $78,000 |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1661 Pine St | unit # 725 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 725 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $88,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | unit # 438 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 438 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $76,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | unit # 436 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 436 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $72,000 |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1661 Pine St | unit # 737 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 737 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $88,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | unit # 1033 (10th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 1033 (10th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $69,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | unit # 538 (5th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 538 (5th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $76,000 |
| Mar 10, 2023 | Completed final sign-off May 2023 | 3400 Laguna St | 1/f unit# 103: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area).Details
1/f unit# 103: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area). | $82,000 |
| Mar 10, 2023 | Completed final sign-off May 2023 | 3400 Laguna St | 1/f unit# 113: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area).Details
1/f unit# 113: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area). | $76,000 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 3400 Laguna St | 2/fl unit 246m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area.Details
2/fl unit 246m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area. | $80,100 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 3400 Laguna St | 3/fl unit 329m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area.Details
3/fl unit 329m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area. | $79,400 |
| Apr 21, 2022 | Completed final sign-off Aug 2022 | 3400 Laguna St | 4th flr: combination of (3) studio units to one (2) bedroom (2) bathroom, unit renovations addition of new kitchenette, cosmetic renovations of (n) lighting, casework, finished and fixtures.Details
4th flr: combination of (3) studio units to one (2) bedroom (2) bathroom, unit renovations addition of new kitchenette, cosmetic renovations of (n) lighting, casework, finished and fixtures. | $140,000 |
| Dec 28, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures.Details
unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures. | $38,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | 2nd fl, unit 224 assisted living unit - remodel and expansion of existing bath. remodel of existing closet & cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. no exterior workDetails
2nd fl, unit 224 assisted living unit - remodel and expansion of existing bath. remodel of existing closet & cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. no exterior work | $98,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | (unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work.Details
(unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work. | $60,000 |
| Jul 7, 2020 | Completed final sign-off Nov 2020 | 3400 Laguna St | 4th floor: suites 403 & 404: extg occupancy class r-2.1 property (no change of use) combining units 403 & 404. cosmetic renovation of extg bathroom, and extg kitchenette at unit 403. remodel of extg bathroom at unit 403.remodel & expansion of extg bath, remodel expansion of closet at unit 404.Details
4th floor: suites 403 & 404: extg occupancy class r-2.1 property (no change of use) combining units 403 & 404. cosmetic renovation of extg bathroom, and extg kitchenette at unit 403. remodel of extg bathroom at unit 403.remodel & expansion of extg bath, remodel expansion of closet at unit 404. | $174,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 3400 Laguna St | 2nd floor: suites 204,205,& 206: extg occupancy class r-2.1 property (no change of use) combining 3 studio units to one (1) 2 bedroom two bathroom unit. renovation includes addition of new kitchenette, cosmetic renovation of extg bath at unit 205, nw lighting, casework, finishes, and fixtures.Details
2nd floor: suites 204,205,& 206: extg occupancy class r-2.1 property (no change of use) combining 3 studio units to one (1) 2 bedroom two bathroom unit. renovation includes addition of new kitchenette, cosmetic renovation of extg bath at unit 205, nw lighting, casework, finishes, and fixtures. | $160,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 3400 Laguna St | 3rd floor: suites 307 & 308: extg occupancy class r-2.1 property (no change of use) combining 307 & 308 into a 2 bedroom, 1 & 1/2 bath unit. remodel of extg bedroom at unit 308. work includes nw lighting, casework, finishes, and fixtures.Details
3rd floor: suites 307 & 308: extg occupancy class r-2.1 property (no change of use) combining 307 & 308 into a 2 bedroom, 1 & 1/2 bath unit. remodel of extg bedroom at unit 308. work includes nw lighting, casework, finishes, and fixtures. | $95,000 |
| Feb 18, 2020 | Completed final sign-off Jun 2020 | 3400 Laguna St | 2nd fl, unit 230 remodel & expansion of existing bath. remodel (e) closet & cosmetic renovation of living area. work includes (n) lighting, casework, finishes & fixtures sq ft area unit does not change interior onlyDetails
2nd fl, unit 230 remodel & expansion of existing bath. remodel (e) closet & cosmetic renovation of living area. work includes (n) lighting, casework, finishes & fixtures sq ft area unit does not change interior only | $20,000 |
| Oct 22, 2019 | Completed final sign-off Jan 2020 | 3400 Laguna St | apt 245: remodel of (e) bath remodel of (e) closet & cosmetic renovations of living area, work includes, new lighting, casework, finishes and fixtures. maher n/a.Details
apt 245: remodel of (e) bath remodel of (e) closet & cosmetic renovations of living area, work includes, new lighting, casework, finishes and fixtures. maher n/a. | $125,000 |
| Jul 8, 2019 | Completed final sign-off Sep 2019 | 3400 Laguna St | #318: remodel of existing bath, remodel of existing closet & cosmetic renovations of living area, work includes new lighting, finishes & casework.Details
#318: remodel of existing bath, remodel of existing closet & cosmetic renovations of living area, work includes new lighting, finishes & casework. | $5,000 |
| Jul 8, 2019 | Completed final sign-off Sep 2019 | 3400 Laguna St | #405: remodel and expansion of existing bath. remodel of (e) closet and cosmetic renovations of living area. new lighting, casework, finishes & fixtures.Details
#405: remodel and expansion of existing bath. remodel of (e) closet and cosmetic renovations of living area. new lighting, casework, finishes & fixtures. | $5,000 |
| Mar 14, 2019 | Completed final sign-off May 2019 | 3400 Laguna St | unit 420. remodel and expansion of (e) bath, remodel (e) closet and cosmetic renovations of living area, new lighting, casework, finishes and fixturesDetails
unit 420. remodel and expansion of (e) bath, remodel (e) closet and cosmetic renovations of living area, new lighting, casework, finishes and fixtures | $5,000 |
| Dec 11, 2018 | Completed final sign-off Jun 2019 | 3400 Laguna St | unit #318/320: combine a 1 bedroom/1 bath and a studio unit into a 2 bedroom/2 bath unit. n/a for maherDetails
unit #318/320: combine a 1 bedroom/1 bath and a studio unit into a 2 bedroom/2 bath unit. n/a for maher | $28,000 |
| Dec 11, 2018 | Completed final sign-off Apr 2019 | 3400 Laguna St | unit #409: remodel and expansion of extg bath, remodel of extg closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures.Details
unit #409: remodel and expansion of extg bath, remodel of extg closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. | $102,000 |
| Sep 27, 2018 | Completed final sign-off Jan 2019 | 3400 Laguna St | unit 225. remodel of (e) bath and closet. cosmetic renovation of living area w/ (n) lighting, casework and finishes and fixtures. maher n/aDetails
unit 225. remodel of (e) bath and closet. cosmetic renovation of living area w/ (n) lighting, casework and finishes and fixtures. maher n/a | $125,000 |
| Sep 27, 2018 | Completed final sign-off Nov 2018 | 3400 Laguna St | unit 108. remodel and expansion of (e) bath. remodel of (e) closet and cosmetic renovations of living area w/ (n) lighting, casework finishes and fixtures. maher n/aDetails
unit 108. remodel and expansion of (e) bath. remodel of (e) closet and cosmetic renovations of living area w/ (n) lighting, casework finishes and fixtures. maher n/a | $98,000 |
| Jul 11, 2018 | Completed final sign-off Sep 2018 | 3400 Laguna St | remodel of (e) bathroom. remodel of (e) closet and comsetic renvovations of living space. new lighting, casework, finished and fixtures.Details
remodel of (e) bathroom. remodel of (e) closet and comsetic renvovations of living space. new lighting, casework, finished and fixtures. | $80,000 |
| May 30, 2018 | Completed final sign-off Aug 2018 | 3400 Laguna St | unit 319: remodel of (e) bath. remodel of (e) closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. verify fire alarm complies with sffc 1103.7.6.1 maher naDetails
unit 319: remodel of (e) bath. remodel of (e) closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. verify fire alarm complies with sffc 1103.7.6.1 maher na | $80,000 |
| May 18, 2018 | Completed final sign-off Jul 2018 | 3400 Laguna St | remodel of existing bath, closet, cometic renovation at living area includes new elec. lighting, finishing plumbingDetails
remodel of existing bath, closet, cometic renovation at living area includes new elec. lighting, finishing plumbing | $80,000 |
| Feb 26, 2018 | Completed final sign-off May 2018 | 3400 Laguna St | unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures.Details
unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures. | $100,000 |
| Feb 26, 2018 | Completed final sign-off Apr 2018 | 3400 Laguna St | unit 419 remodel of extg bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures.Details
unit 419 remodel of extg bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures. | $75,000 |
| Feb 16, 2018 | Completed final sign-off Apr 2018 | 3400 Laguna St | unit #227- cosmetic renovation of living room & bathroom.Details
unit #227- cosmetic renovation of living room & bathroom. | $80,000 |
| Aug 31, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na.Details
unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na. | $120,000 |
| Aug 17, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | #328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13Details
#328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13 | $120,000 |
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 3400 Laguna St | #120- remodel & expansion of (e) bath, remodel of (e) closet and cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13Details
#120- remodel & expansion of (e) bath, remodel of (e) closet and cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13 | $90,000 |
| Jun 29, 2017 | Completed final sign-off Nov 2017 | 3400 Laguna St | unit 105: remodel and expand (e) bath. remodel e closet. cosmetic renovations at living area. work includes lighting, casework, finishes, fixturesDetails
unit 105: remodel and expand (e) bath. remodel e closet. cosmetic renovations at living area. work includes lighting, casework, finishes, fixtures | $200,000 |
| May 17, 2017 | Completed final sign-off Oct 2017 | 3400 Laguna St | unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307Details
unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307 | $100,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3400 Laguna St | unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer.Details
unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer. | $50,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3400 Laguna St | unit #241 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. n/a maherDetails
unit #241 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. n/a maher | $50,000 |
| Mar 31, 2017 | Completed final sign-off Jul 2017 | 3400 Laguna St | unit 109: remodel and expansion of extg bath. remodel closet. cosmetic renovation of living area. n/a for maher.Details
unit 109: remodel and expansion of extg bath. remodel closet. cosmetic renovation of living area. n/a for maher. | $40,000 |
| Jan 17, 2017 | Completed final sign-off May 2017 | 3400 Laguna St | work in unit 104: restoration/enlarge e bathroom in e unit. plumbing, elec, finishesDetails
work in unit 104: restoration/enlarge e bathroom in e unit. plumbing, elec, finishes | $30,000 |
| Jan 12, 2017 | Completed final sign-off Jul 2017 | 3400 Laguna St | unit renovation including bath & kitchenette finishes. replace exterior door/window with new windows steel sash in unit 332. n/a maher ordinanceDetails
unit renovation including bath & kitchenette finishes. replace exterior door/window with new windows steel sash in unit 332. n/a maher ordinance | $75,000 |
| Dec 15, 2016 | Expired or cancelled cancelled Feb 2021 | 3400 Laguna St | remodel and expansion of bathroom and interior finishes at living unit #306 maher naDetails
remodel and expansion of bathroom and interior finishes at living unit #306 maher na | $35,000 |
| Dec 15, 2016 | Completed final sign-off Mar 2017 | 3400 Laguna St | remodel and expansion of bathroom and interior finishes at living unit #312 maher naDetails
remodel and expansion of bathroom and interior finishes at living unit #312 maher na | $35,000 |
| Nov 21, 2016 | Completed final sign-off Feb 2017 | 3400 Laguna St | unit # 107: remodel & expansion of (e) bathroom, remodel of (e) closet & cosmetic renovation of living area. includes new lighting, casework, finishes & plumbing fixtures maher naDetails
unit # 107: remodel & expansion of (e) bathroom, remodel of (e) closet & cosmetic renovation of living area. includes new lighting, casework, finishes & plumbing fixtures maher na | $30,000 |
| Nov 17, 2016 | Completed final sign-off Feb 2017 | 1400 Geary Bl | (4th fl, 4g-4h) interior remodel: 2 studio units combined into one unit, (1 bedroom, full bath & powder room), replace plumbing fixtures, install shower grab bar backing , add smoke detectors at sleepng room & living room /entry, electricalDetails
(4th fl, 4g-4h) interior remodel: 2 studio units combined into one unit, (1 bedroom, full bath & powder room), replace plumbing fixtures, install shower grab bar backing , add smoke detectors at sleepng room & living room /entry, electrical | $100,000 |
| May 6, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | unit 326: interior remodel 330 sq ft remodel (e) studio apt. bathroom, upgrade shower add grab bars w/backing. add new tile throughout. replace plumbing fixtures, replace (e) light fixtures add new kitchenette w/sink. no stove. maher naDetails
unit 326: interior remodel 330 sq ft remodel (e) studio apt. bathroom, upgrade shower add grab bars w/backing. add new tile throughout. replace plumbing fixtures, replace (e) light fixtures add new kitchenette w/sink. no stove. maher na | $110,000 |
| Apr 8, 2016 | Completed final sign-off Oct 2016 | 3400 Laguna St | remodel and expansion of 3 existing bathrooms in priviet units. new shower fixtures, tile, floors and walls. new lighting, vanity and faucet maher not reqDetails
remodel and expansion of 3 existing bathrooms in priviet units. new shower fixtures, tile, floors and walls. new lighting, vanity and faucet maher not req | $60,000 |
| Mar 17, 2016 | Completed final sign-off May 2016 | 1400 Geary Bl | 6/f unit #6p- interior remodel one bedroom and den. changing the kitchenette area to the entry way and adding closet space in the den. bathroom work. there is no exterior work.Details
6/f unit #6p- interior remodel one bedroom and den. changing the kitchenette area to the entry way and adding closet space in the den. bathroom work. there is no exterior work. | $130,000 |
| Mar 14, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | unit 325, interior remokdel (340 sq ft) remokdel (e) studio apt and bathroom. upgrade shower, add grab bars with backing, add tile throughout. replace plumbing fixtrues. replace (e) lights/add new. add new kitchenette with sink & appliances - no cook top. maher naDetails
unit 325, interior remokdel (340 sq ft) remokdel (e) studio apt and bathroom. upgrade shower, add grab bars with backing, add tile throughout. replace plumbing fixtrues. replace (e) lights/add new. add new kitchenette with sink & appliances - no cook top. maher na | $110,000 |
| Feb 2, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | unit 324, interior room remodel 0 addition of 70 sf. new lighting where occurs. remodel bathroom. minor chane to one egress hallway. sprinkler work under separate permit. maher naDetails
unit 324, interior room remodel 0 addition of 70 sf. new lighting where occurs. remodel bathroom. minor chane to one egress hallway. sprinkler work under separate permit. maher na | $175,000 |
| Oct 6, 2015 | Completed final sign-off Jan 2016 | 1400 Geary Bl | 3rd floor, unit 3p interior remodel, one two bedroom one bath unit into a one bedroom one bath unit with den. no exterior workDetails
3rd floor, unit 3p interior remodel, one two bedroom one bath unit into a one bedroom one bath unit with den. no exterior work | $74,151 |
| Aug 24, 2015 | Completed final sign-off Aug 2016 | 1400 Geary Bl | combine units 5f and 5e to make 5f. remodel 2 bedroom unit and a studio apt into a 2 bedroom unit with a den with 3 full baths. no exterior work.Details
combine units 5f and 5e to make 5f. remodel 2 bedroom unit and a studio apt into a 2 bedroom unit with a den with 3 full baths. no exterior work. | $168,720 |
| May 8, 2015 | Completed final sign-off Jul 2015 | 1400 Geary Bl | 4th flr units 4 c&d: interior remodel: 2 studio units converted to one bedroom unit with a full bath and powder room. there is no exterior work.Details
4th flr units 4 c&d: interior remodel: 2 studio units converted to one bedroom unit with a full bath and powder room. there is no exterior work. | $85,000 |
| Mar 24, 2015 | Completed final sign-off Jun 2015 | 1400 Geary Bl | 6th flr, unit 6a interior remodel: one, two bedroom, two bathroom unit into a one bedroom, two bathroom unit with den. no exterior work.Details
6th flr, unit 6a interior remodel: one, two bedroom, two bathroom unit into a one bedroom, two bathroom unit with den. no exterior work. | $136,000 |
| Dec 19, 2014 | Completed final sign-off Apr 2015 | 1400 Geary Bl | unit 6c/6d interior remodel 2 studio units into 1 bedroom unit with full bath and powder roomDetails
unit 6c/6d interior remodel 2 studio units into 1 bedroom unit with full bath and powder room | $130,000 |
| May 28, 2010 | Expired or cancelled expired Aug 2013 | 1661 Pine St | unit# 444 on the 4th floor. interior remodel of (e) kitchen and two bathrooms. existing wall to remain.Details
unit# 444 on the 4th floor. interior remodel of (e) kitchen and two bathrooms. existing wall to remain. | $70,000 |