Block 0471, lot 003
3400 Laguna St
- City’s use
- Commercial Misc
- Built
- 1924
- Stories
- 4
- Units
- 112
- Rooms
- 101 bathrooms
- Building
- 83,680 sq ft
- Lot
- 68,005 sq ft
- Zoning
- RM1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
124 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 17, 2026 | Completed final sign-off May 2026 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | to obtain final inspection for work approved under pa# 202303224143. all work is complete.Details
to obtain final inspection for work approved under pa# 202303224143. all work is complete. | |
| Nov 10, 2025 | Completed final sign-off Feb 2026 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 4th/fl: units 405(p) & 406(p): two studio unit(s): combine into a one bedroom unit. conversion of bathroom into kichenette. no exterior work.Details
4th/fl: units 405(p) & 406(p): two studio unit(s): combine into a one bedroom unit. conversion of bathroom into kichenette. no exterior work. | $75,000 |
| Oct 31, 2025 | Completed final sign-off Jan 2026 | 3400 Laguna St | Bolls Fire & Safety Inc | f/s ref t.i. 202507090427: demo 2 e) side wall sprinklers, relocate 2 e) sp & rinklers & replace 2 e) pendent sprinklers to concealed sprinklers for t.i. on 2nd/f unit 238 & 240Details
f/s ref t.i. 202507090427: demo 2 e) side wall sprinklers, relocate 2 e) sp & rinklers & replace 2 e) pendent sprinklers to concealed sprinklers for t.i. on 2nd/f unit 238 & 240 | $4,000 |
| Jul 9, 2025 | Completed final sign-off Jan 2026 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change.Details
2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change. | $80,000 |
| Jun 25, 2025 | Completed final sign-off Mar 2026 | 3400 Laguna St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i - adding 3 relay modules to existing notifier nfs2-3030 fire alarm system. no change to elevator recall oprations under this permit. ref permit 202303224143Details
fire alarm t.i - adding 3 relay modules to existing notifier nfs2-3030 fire alarm system. no change to elevator recall oprations under this permit. ref permit 202303224143 | $7,245 |
| Jun 20, 2025 | Completed final sign-off Sep 2025 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work.Details
3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work. | $107,160 |
| Feb 14, 2025 | Completed final sign-off Nov 2025 | 3400 Laguna St | Bolls Fire & Safety Inc | basement level-fire only- ddemo and reinstall (e) upright sprinkler and arm over for ti. bldg pa# 202410223413Details
basement level-fire only- ddemo and reinstall (e) upright sprinkler and arm over for ti. bldg pa# 202410223413 | $4,000 |
| Oct 22, 2024 | Completed final sign-off Jun 2025 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 4/fl- ref 202405313387- plumbing and electrical workDetails
4/fl- ref 202405313387- plumbing and electrical work | $44,600 |
| Aug 12, 2024 | Completed final sign-off May 2026 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | revision to pa # 2023-0322-4143 changing the (e) elevator cab & scissor gate doors; tracks, hardware. coordinate extent of demo with new replacement cab. basements, 1st, 2nd & 3rd flDetails
revision to pa # 2023-0322-4143 changing the (e) elevator cab & scissor gate doors; tracks, hardware. coordinate extent of demo with new replacement cab. basements, 1st, 2nd & 3rd fl | $150,000 |
| May 31, 2024 | Completed final sign-off Jun 2025 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 423: remodel of (e) independent living unit into a laundry room. (n) lighting, casewood, finishes, fixtures, washing machine plumbing connections. electrical dryer power receptacles & exhaust ducts through the roof.Details
unit 423: remodel of (e) independent living unit into a laundry room. (n) lighting, casewood, finishes, fixtures, washing machine plumbing connections. electrical dryer power receptacles & exhaust ducts through the roof. | $61,250 |
| May 24, 2024 | Completed final sign-off Jan 2025 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 3rd fl, unit 327 remodel & expansion of (e) bath; remodel of (e) closet and cosmetic renotations of living area. work includes new lights, casework, finishes and fixturesDetails
3rd fl, unit 327 remodel & expansion of (e) bath; remodel of (e) closet and cosmetic renotations of living area. work includes new lights, casework, finishes and fixtures | $62,500 |
| May 23, 2024 | Completed final sign-off Jan 2025 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 213: remodel & expansion of e) bath. remodel of e) closet & cosmetic renovation of living area including new lighting, casework, finishes & fixturesDetails
unit 213: remodel & expansion of e) bath. remodel of e) closet & cosmetic renovation of living area including new lighting, casework, finishes & fixtures | $64,500 |
| May 7, 2024 | Completed final sign-off Aug 2024 | 3400 Laguna St | Peninsula Custom Construction Inc | 4th/fl- units 419 and 420 to combine two studios units into a 1 bedroom unit. converson of bathroom into a kitchenette. remodel of (e) bathroom inlcuding replacing (e) lavatory cabinet and sink, mirror and shower toilet to remainDetails
4th/fl- units 419 and 420 to combine two studios units into a 1 bedroom unit. converson of bathroom into a kitchenette. remodel of (e) bathroom inlcuding replacing (e) lavatory cabinet and sink, mirror and shower toilet to remain | $140,000 |
| May 3, 2024 | Completed final sign-off Aug 2024 | 3400 Laguna St | Peninsula Custom Construction Inc | 3rd floor: unit 305: remodel and expansion of extg batah, cosmetic renovations of living area work includes, new lighting, casework, finishes and fixtures. no exterior work. no combining unitsDetails
3rd floor: unit 305: remodel and expansion of extg batah, cosmetic renovations of living area work includes, new lighting, casework, finishes and fixtures. no exterior work. no combining units | $140,000 |
| Apr 24, 2024 | In progress issued Apr 2024 | 3400 Laguna St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti: replacing (e) facp (notifier nfs 2020) with new notifier nfs 3030 facp. replacing (e) annunciator. adding new cellular communication.Details
fire alarm ti: replacing (e) facp (notifier nfs 2020) with new notifier nfs 3030 facp. replacing (e) annunciator. adding new cellular communication. | $39,838 |
| Sep 12, 2023 | Completed final sign-off Nov 2023 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures.Details
3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures. | $78,000 |
| May 9, 2023 | Never finaled issued May 2023, no final | 3400 Laguna St | Sure Fire Protection | relocate 1-ssu type sprinkler for installation of new i-beamDetails
relocate 1-ssu type sprinkler for installation of new i-beam | $4,200 |
| Mar 22, 2023 | Expired or cancelled expired May 2026 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | replace existing passenger elevator manual cab and hoistway doors with auto sliding doors.Details
replace existing passenger elevator manual cab and hoistway doors with auto sliding doors. | $250,000 |
| Mar 10, 2023 | Completed final sign-off May 2023 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 1/f unit# 113: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area).Details
1/f unit# 113: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area). | $76,000 |
| Mar 10, 2023 | Completed final sign-off May 2023 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 1/f unit# 103: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area).Details
1/f unit# 103: remodel and expansion of existing bath, remodel existing closet and cosmetic renovations of living area. work includes new lights, casework, finishes and fixtures. interior work only. (unit sqft does not change, no chnage in e occup, struc or bldg area). | $82,000 |
| Jul 15, 2022 | Completed final sign-off Aug 2022 | 3400 Laguna St | Sure Fire Protection | unit 329m: fire sprinkler: change out 6 existing drop pendents sprinklers to new quick response concealed sprinklers. ref permit 202207067851Details
unit 329m: fire sprinkler: change out 6 existing drop pendents sprinklers to new quick response concealed sprinklers. ref permit 202207067851 | $2,800 |
| Jul 15, 2022 | Completed final sign-off Aug 2022 | 3400 Laguna St | Sure Fire Protection | unit 246m: fire sprinkler: change out 3 existing drop pendents to new type concealed sprinklers. ref permit 202207067854Details
unit 246m: fire sprinkler: change out 3 existing drop pendents to new type concealed sprinklers. ref permit 202207067854 | $2,800 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 2/fl unit 246m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area.Details
2/fl unit 246m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area. | $80,100 |
| Jul 6, 2022 | Completed final sign-off Nov 2022 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 3/fl unit 329m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area.Details
3/fl unit 329m remodel of (e) bath, cosmetic reno of living area and closet. new work includes new lighting, casework, finsihes and fixtures. sqft area of unit does not change. no exterior work. no change to (e) occupancy sturcture or building area. | $79,400 |
| May 13, 2022 | Completed final sign-off Oct 2022 | 3400 Laguna St | Westco Roofing Co. Inc. | reroofingDetails
reroofing | $32,000 |
| Apr 21, 2022 | Completed final sign-off Aug 2022 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 4th flr: combination of (3) studio units to one (2) bedroom (2) bathroom, unit renovations addition of new kitchenette, cosmetic renovations of (n) lighting, casework, finished and fixtures.Details
4th flr: combination of (3) studio units to one (2) bedroom (2) bathroom, unit renovations addition of new kitchenette, cosmetic renovations of (n) lighting, casework, finished and fixtures. | $140,000 |
| Dec 28, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures.Details
unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures. | $38,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 2nd fl, unit 224 assisted living unit - remodel and expansion of existing bath. remodel of existing closet & cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. no exterior workDetails
2nd fl, unit 224 assisted living unit - remodel and expansion of existing bath. remodel of existing closet & cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. no exterior work | $98,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | (unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work.Details
(unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work. | $60,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 2nd floor: suites 204,205,& 206: extg occupancy class r-2.1 property (no change of use) combining 3 studio units to one (1) 2 bedroom two bathroom unit. renovation includes addition of new kitchenette, cosmetic renovation of extg bath at unit 205, nw lighting, casework, finishes, and fixtures.Details
2nd floor: suites 204,205,& 206: extg occupancy class r-2.1 property (no change of use) combining 3 studio units to one (1) 2 bedroom two bathroom unit. renovation includes addition of new kitchenette, cosmetic renovation of extg bath at unit 205, nw lighting, casework, finishes, and fixtures. | $160,000 |
| Jul 7, 2020 | Completed final sign-off Nov 2020 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 4th floor: suites 403 & 404: extg occupancy class r-2.1 property (no change of use) combining units 403 & 404. cosmetic renovation of extg bathroom, and extg kitchenette at unit 403. remodel of extg bathroom at unit 403.remodel & expansion of extg bath, remodel expansion of closet at unit 404.Details
4th floor: suites 403 & 404: extg occupancy class r-2.1 property (no change of use) combining units 403 & 404. cosmetic renovation of extg bathroom, and extg kitchenette at unit 403. remodel of extg bathroom at unit 403.remodel & expansion of extg bath, remodel expansion of closet at unit 404. | $174,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 3rd floor: suites 307 & 308: extg occupancy class r-2.1 property (no change of use) combining 307 & 308 into a 2 bedroom, 1 & 1/2 bath unit. remodel of extg bedroom at unit 308. work includes nw lighting, casework, finishes, and fixtures.Details
3rd floor: suites 307 & 308: extg occupancy class r-2.1 property (no change of use) combining 307 & 308 into a 2 bedroom, 1 & 1/2 bath unit. remodel of extg bedroom at unit 308. work includes nw lighting, casework, finishes, and fixtures. | $95,000 |
| Feb 18, 2020 | Completed final sign-off Jun 2020 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | 2nd fl, unit 230 remodel & expansion of existing bath. remodel (e) closet & cosmetic renovation of living area. work includes (n) lighting, casework, finishes & fixtures sq ft area unit does not change interior onlyDetails
2nd fl, unit 230 remodel & expansion of existing bath. remodel (e) closet & cosmetic renovation of living area. work includes (n) lighting, casework, finishes & fixtures sq ft area unit does not change interior only | $20,000 |
| Nov 21, 2019 | Completed final sign-off Feb 2020 | 3400 Laguna St | Sure Fire Protection | unit 245. install concealed type pendent sprinkler in (e) sprinkler head locationsDetails
unit 245. install concealed type pendent sprinkler in (e) sprinkler head locations | $4,200 |
| Oct 22, 2019 | Completed final sign-off Jan 2020 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | apt 245: remodel of (e) bath remodel of (e) closet & cosmetic renovations of living area, work includes, new lighting, casework, finishes and fixtures. maher n/a.Details
apt 245: remodel of (e) bath remodel of (e) closet & cosmetic renovations of living area, work includes, new lighting, casework, finishes and fixtures. maher n/a. | $125,000 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 3400 Laguna St | street spaceDetails
street space | ||
| Jul 8, 2019 | Completed final sign-off Sep 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | #405: remodel and expansion of existing bath. remodel of (e) closet and cosmetic renovations of living area. new lighting, casework, finishes & fixtures.Details
#405: remodel and expansion of existing bath. remodel of (e) closet and cosmetic renovations of living area. new lighting, casework, finishes & fixtures. | $5,000 |
| Jul 8, 2019 | Completed final sign-off Sep 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | #318: remodel of existing bath, remodel of existing closet & cosmetic renovations of living area, work includes new lighting, finishes & casework.Details
#318: remodel of existing bath, remodel of existing closet & cosmetic renovations of living area, work includes new lighting, finishes & casework. | $5,000 |
| Jun 6, 2019 | Completed final sign-off Jun 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | admin correction to record. units 319/320 combine into one unit. reduction of unit count correction. reference #201812118021.Details
admin correction to record. units 319/320 combine into one unit. reduction of unit count correction. reference #201812118021. | |
| Mar 27, 2019 | Never finaled issued Mar 2019, no final | 3400 Laguna St | street space onlyDetails
street space only | ||
| Mar 14, 2019 | Completed final sign-off May 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 420. remodel and expansion of (e) bath, remodel (e) closet and cosmetic renovations of living area, new lighting, casework, finishes and fixturesDetails
unit 420. remodel and expansion of (e) bath, remodel (e) closet and cosmetic renovations of living area, new lighting, casework, finishes and fixtures | $5,000 |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 3400 Laguna St | street spaceDetails
street space | ||
| Jan 23, 2019 | Never finaled issued Jan 2019, no final | 3400 Laguna St | Pacific Auxiliary Fire Alarm | fire alarm, 1st fl, 2 addressable relays, 2 pilot relays, 2 horn strobes, ref 201807114332Details
fire alarm, 1st fl, 2 addressable relays, 2 pilot relays, 2 horn strobes, ref 201807114332 | $5,400 |
| Dec 11, 2018 | Completed final sign-off Jun 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | revision to app#201809170424(cottage) in lieu of new 6 3/4 x 15 gl beam, posts, and footings, provide new 2x12 and attach to extg 4x12. n/a for maherDetails
revision to app#201809170424(cottage) in lieu of new 6 3/4 x 15 gl beam, posts, and footings, provide new 2x12 and attach to extg 4x12. n/a for maher | |
| Dec 11, 2018 | Completed final sign-off Jun 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit #318/320: combine a 1 bedroom/1 bath and a studio unit into a 2 bedroom/2 bath unit. n/a for maherDetails
unit #318/320: combine a 1 bedroom/1 bath and a studio unit into a 2 bedroom/2 bath unit. n/a for maher | $28,000 |
| Dec 11, 2018 | Completed final sign-off Apr 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit #409: remodel and expansion of extg bath, remodel of extg closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures.Details
unit #409: remodel and expansion of extg bath, remodel of extg closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. | $102,000 |
| Nov 14, 2018 | Completed final sign-off Apr 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | revision to pa #20185300529 - change in restroom door swings.Details
revision to pa #20185300529 - change in restroom door swings. | |
| Oct 3, 2018 | Completed final sign-off Jan 2019 | 3400 Laguna St | Sure Fire Protection | relocate 3 sprinklersDetails
relocate 3 sprinklers | $5,400 |
| Sep 27, 2018 | Completed final sign-off Nov 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 108. remodel and expansion of (e) bath. remodel of (e) closet and cosmetic renovations of living area w/ (n) lighting, casework finishes and fixtures. maher n/aDetails
unit 108. remodel and expansion of (e) bath. remodel of (e) closet and cosmetic renovations of living area w/ (n) lighting, casework finishes and fixtures. maher n/a | $98,000 |
| Sep 27, 2018 | Completed final sign-off Jan 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 225. remodel of (e) bath and closet. cosmetic renovation of living area w/ (n) lighting, casework and finishes and fixtures. maher n/aDetails
unit 225. remodel of (e) bath and closet. cosmetic renovation of living area w/ (n) lighting, casework and finishes and fixtures. maher n/a | $125,000 |
| Sep 17, 2018 | Completed final sign-off Jun 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | interior renovation of (e) cottage building. removal & additional of non-structural partition walls. replacement of 1 exterior ramp & railing & replacement of (e) wood fence. maher n/a.Details
interior renovation of (e) cottage building. removal & additional of non-structural partition walls. replacement of 1 exterior ramp & railing & replacement of (e) wood fence. maher n/a. | $150,000 |
| Jul 11, 2018 | Completed final sign-off Sep 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | remodel of (e) bathroom. remodel of (e) closet and comsetic renvovations of living space. new lighting, casework, finished and fixtures.Details
remodel of (e) bathroom. remodel of (e) closet and comsetic renvovations of living space. new lighting, casework, finished and fixtures. | $80,000 |
| May 30, 2018 | Completed final sign-off Aug 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 319: remodel of (e) bath. remodel of (e) closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. verify fire alarm complies with sffc 1103.7.6.1 maher naDetails
unit 319: remodel of (e) bath. remodel of (e) closet and cosmetic renovations of living area. work includes new lighting, casework, finishes and fixtures. verify fire alarm complies with sffc 1103.7.6.1 maher na | $80,000 |
| May 30, 2018 | Completed final sign-off Apr 2019 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | renovation of 2 (e) restrooms, scope of work includes replacement of fixtures and fittings in kind and replacement of interior finishes maher naDetails
renovation of 2 (e) restrooms, scope of work includes replacement of fixtures and fittings in kind and replacement of interior finishes maher na | $50,000 |
| May 18, 2018 | Completed final sign-off Jul 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | remodel of existing bath, closet, cometic renovation at living area includes new elec. lighting, finishing plumbingDetails
remodel of existing bath, closet, cometic renovation at living area includes new elec. lighting, finishing plumbing | $80,000 |
| May 4, 2018 | Expired or cancelled cancelled Jan 2026 | 3400 Laguna St | Ayoob & Peery Plumbing Co Inc | renovation of restrooms, combine 2 existing small restroom to 1 accessbile restroomDetails
renovation of restrooms, combine 2 existing small restroom to 1 accessbile restroom | $25,000 |
| Feb 26, 2018 | Completed final sign-off May 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures.Details
unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures. | $100,000 |
| Feb 26, 2018 | Completed final sign-off Apr 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 419 remodel of extg bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures.Details
unit 419 remodel of extg bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures. | $75,000 |
| Feb 16, 2018 | Completed final sign-off Apr 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit #227- cosmetic renovation of living room & bathroom.Details
unit #227- cosmetic renovation of living room & bathroom. | $80,000 |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | Sure Fire Protection | #244: f/s - total of 11 ssp type sprinklers to be installed. ref pa #201708316621. maher naDetails
#244: f/s - total of 11 ssp type sprinklers to be installed. ref pa #201708316621. maher na | $4,500 |
| Aug 31, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na.Details
unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na. | $120,000 |
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | #120- remodel & expansion of (e) bath, remodel of (e) closet and cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13Details
#120- remodel & expansion of (e) bath, remodel of (e) closet and cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13 | $90,000 |
| Aug 17, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | #328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13Details
#328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13 | $120,000 |
| Aug 11, 2017 | Never finaled issued Aug 2017, no final | 3400 Laguna St | street space permitDetails
street space permit | ||
| Jun 29, 2017 | Completed final sign-off Nov 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 105: remodel and expand (e) bath. remodel e closet. cosmetic renovations at living area. work includes lighting, casework, finishes, fixturesDetails
unit 105: remodel and expand (e) bath. remodel e closet. cosmetic renovations at living area. work includes lighting, casework, finishes, fixtures | $200,000 |
| May 31, 2017 | Never finaled issued May 2017, no final | 3400 Laguna St | Sure Fire Protection | new walls and new drop ceiling, change 2 e hsw to new con drop pendent sprinklers to new position change out existing semi rececessed sprinkler to concealed ref 201705176885Details
new walls and new drop ceiling, change 2 e hsw to new con drop pendent sprinklers to new position change out existing semi rececessed sprinkler to concealed ref 201705176885 | $3,800 |
| May 17, 2017 | Completed final sign-off Oct 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307Details
unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307 | $100,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer.Details
unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer. | $50,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit #241 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. n/a maherDetails
unit #241 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. n/a maher | $50,000 |
| Mar 31, 2017 | Completed final sign-off Jul 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 109: remodel and expansion of extg bath. remodel closet. cosmetic renovation of living area. n/a for maher.Details
unit 109: remodel and expansion of extg bath. remodel closet. cosmetic renovation of living area. n/a for maher. | $40,000 |
| Mar 14, 2017 | Completed final sign-off May 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | open door from senior housing unit 325 to 326, create 1 bedroom from studio. existing lighting to remainDetails
open door from senior housing unit 325 to 326, create 1 bedroom from studio. existing lighting to remain | $20,000 |
| Feb 1, 2017 | Completed final sign-off Jul 2017 | 3400 Laguna St | Sure Fire Protection | 3rd flr: suite 332, install new concealed type sprinkles 8 in (e) 401 type sprinkler locations maher naDetails
3rd flr: suite 332, install new concealed type sprinkles 8 in (e) 401 type sprinkler locations maher na | $2,400 |
| Jan 17, 2017 | Completed final sign-off May 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | work in unit 104: restoration/enlarge e bathroom in e unit. plumbing, elec, finishesDetails
work in unit 104: restoration/enlarge e bathroom in e unit. plumbing, elec, finishes | $30,000 |
| Jan 12, 2017 | Completed final sign-off Jul 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit renovation including bath & kitchenette finishes. replace exterior door/window with new windows steel sash in unit 332. n/a maher ordinanceDetails
unit renovation including bath & kitchenette finishes. replace exterior door/window with new windows steel sash in unit 332. n/a maher ordinance | $75,000 |
| Dec 15, 2016 | Expired or cancelled cancelled Feb 2021 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | remodel and expansion of bathroom and interior finishes at living unit #306 maher naDetails
remodel and expansion of bathroom and interior finishes at living unit #306 maher na | $35,000 |
| Dec 15, 2016 | Completed final sign-off Mar 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | remodel and expansion of bathroom and interior finishes at living unit #312 maher naDetails
remodel and expansion of bathroom and interior finishes at living unit #312 maher na | $35,000 |
| Nov 21, 2016 | Completed final sign-off Feb 2017 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit # 107: remodel & expansion of (e) bathroom, remodel of (e) closet & cosmetic renovation of living area. includes new lighting, casework, finishes & plumbing fixtures maher naDetails
unit # 107: remodel & expansion of (e) bathroom, remodel of (e) closet & cosmetic renovation of living area. includes new lighting, casework, finishes & plumbing fixtures maher na | $30,000 |
| Sep 2, 2016 | Expired or cancelled cancelled Nov 2024 | 3400 Laguna St | 1 story horizontal rear addition.Details
1 story horizontal rear addition. | $4,000,000 | |
| Jul 15, 2016 | Never finaled issued Jul 2016, no final | 3400 Laguna St | Sure Fire Protection | unit #326 - for new wall add (1) new concealed (ssp). fire sprinkler standard spray in kitchen. for ref. # 2016-0506-6845.Details
unit #326 - for new wall add (1) new concealed (ssp). fire sprinkler standard spray in kitchen. for ref. # 2016-0506-6845. | $2,800 |
| Jun 8, 2016 | Never finaled issued Jun 2016, no final | 3400 Laguna St | Bolls Fire & Safety Inc | add 1 new pendent sprinkler for new ceiling remodel. referenced ti 201603.24.3025 maher not reqDetails
add 1 new pendent sprinkler for new ceiling remodel. referenced ti 201603.24.3025 maher not req | $2,500 |
| May 6, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 326: interior remodel 330 sq ft remodel (e) studio apt. bathroom, upgrade shower add grab bars w/backing. add new tile throughout. replace plumbing fixtures, replace (e) light fixtures add new kitchenette w/sink. no stove. maher naDetails
unit 326: interior remodel 330 sq ft remodel (e) studio apt. bathroom, upgrade shower add grab bars w/backing. add new tile throughout. replace plumbing fixtures, replace (e) light fixtures add new kitchenette w/sink. no stove. maher na | $110,000 |
| Apr 8, 2016 | Completed final sign-off Oct 2016 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | remodel and expansion of 3 existing bathrooms in priviet units. new shower fixtures, tile, floors and walls. new lighting, vanity and faucet maher not reqDetails
remodel and expansion of 3 existing bathrooms in priviet units. new shower fixtures, tile, floors and walls. new lighting, vanity and faucet maher not req | $60,000 |
| Apr 1, 2016 | Completed final sign-off May 2016 | 3400 Laguna St | Sure Fire Protection | unit 325 - relocate 1 (e) ssp. maher naDetails
unit 325 - relocate 1 (e) ssp. maher na | $2,800 |
| Apr 1, 2016 | Completed final sign-off May 2016 | 3400 Laguna St | Sure Fire Protection | unit 324 - relocate 1 (e) ssp maher naDetails
unit 324 - relocate 1 (e) ssp maher na | $3,800 |
| Mar 24, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | remodel 4 existing common room kitchens. new countertops, cabinets, flooring, new appliances. refrig,microwave. reduce light fixtures, add new fixtures, replace sinks and faucets. maher not reqDetails
remodel 4 existing common room kitchens. new countertops, cabinets, flooring, new appliances. refrig,microwave. reduce light fixtures, add new fixtures, replace sinks and faucets. maher not req | $190,000 |
| Mar 14, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 325, interior remokdel (340 sq ft) remokdel (e) studio apt and bathroom. upgrade shower, add grab bars with backing, add tile throughout. replace plumbing fixtrues. replace (e) lights/add new. add new kitchenette with sink & appliances - no cook top. maher naDetails
unit 325, interior remokdel (340 sq ft) remokdel (e) studio apt and bathroom. upgrade shower, add grab bars with backing, add tile throughout. replace plumbing fixtrues. replace (e) lights/add new. add new kitchenette with sink & appliances - no cook top. maher na | $110,000 |
| Feb 2, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | Nelson T Lewis Const Co Inc. | unit 324, interior room remodel 0 addition of 70 sf. new lighting where occurs. remodel bathroom. minor chane to one egress hallway. sprinkler work under separate permit. maher naDetails
unit 324, interior room remodel 0 addition of 70 sf. new lighting where occurs. remodel bathroom. minor chane to one egress hallway. sprinkler work under separate permit. maher na | $175,000 |
| Jun 3, 2015 | Completed final sign-off Jun 2015 | 3400 Laguna St | C.R. Fire Line Inc | unit #248: relocate 1 fire sprinkler head in room #248. ref# 201505126010 n/a for maherDetails
unit #248: relocate 1 fire sprinkler head in room #248. ref# 201505126010 n/a for maher | $3,200 |
| May 12, 2015 | Never finaled issued May 2015, no final | 3400 Laguna St | Hildebrand Renovation | interior room remodel unit 248, 410 sf. remodel e bedroom, living rm, closet, elec, ceiling trim, bath fixtures, door, finshes, trim, paint. add k itchenette and appliances, sprinkler under separate permitDetails
interior room remodel unit 248, 410 sf. remodel e bedroom, living rm, closet, elec, ceiling trim, bath fixtures, door, finshes, trim, paint. add k itchenette and appliances, sprinkler under separate permit | $61,375 |
| May 11, 2015 | Never finaled issued May 2015, no final | 3400 Laguna St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Feb 20, 2015 | Completed final sign-off Mar 2019 | 3400 Laguna St | Westco Roofing Co. Inc. | reroofingDetails
reroofing | $34,000 |
| Dec 19, 2014 | Completed final sign-off Jan 2015 | 3400 Laguna St | C.R. Fire Line Inc | 2nd fl: #246 - relocate 2 fire sprinkler heads. ref t.i. #201410088389. n/a maher ordinanceDetails
2nd fl: #246 - relocate 2 fire sprinkler heads. ref t.i. #201410088389. n/a maher ordinance | $1,275 |
| Dec 2, 2014 | Completed final sign-off Dec 2014 | 3400 Laguna St | Hildebrand Renovation | voluntary upgrades. adding 1/2" type x gyp board over extg gyp board at wall above corridor doors on 1st floor. approx 32 sq ft on each side. approx 64 sq ft total.Details
voluntary upgrades. adding 1/2" type x gyp board over extg gyp board at wall above corridor doors on 1st floor. approx 32 sq ft on each side. approx 64 sq ft total. | $2,000 |
| Nov 5, 2014 | Completed final sign-off Mar 2015 | 3400 Laguna St | Hildebrand Renovation | interior bath remodel room 410. remodel existing bath, replace plumbing/elec fixtures at existing bathroom. replace finishes at bedroom carpet lighting trim paint. no change to building egress exterior or areaDetails
interior bath remodel room 410. remodel existing bath, replace plumbing/elec fixtures at existing bathroom. replace finishes at bedroom carpet lighting trim paint. no change to building egress exterior or area | $17,000 |
| Oct 8, 2014 | Completed final sign-off Mar 2015 | 3400 Laguna St | Hildebrand Renovation | #246- interior bedroom/bathroom remodel, remodel existing bedroom & bathroom, replace plumbing & electrical fixtures, hardware & finishes. no change to building egress, exterior or area. n/a ordinance #155-13.Details
#246- interior bedroom/bathroom remodel, remodel existing bedroom & bathroom, replace plumbing & electrical fixtures, hardware & finishes. no change to building egress, exterior or area. n/a ordinance #155-13. | $17,000 |
| Jul 24, 2014 | Completed final sign-off Mar 2015 | 3400 Laguna St | Hildebrand Renovation | room 408 remodel and bathroom remodel. maher n/a.Details
room 408 remodel and bathroom remodel. maher n/a. | $17,000 |
| Apr 2, 2014 | Never finaled issued Apr 2014, no final | 3400 Laguna St | C.R. Fire Line Inc | auto fire sprinkler. t.i., 2nd floor, room 243: relocating (2) sprinklers. ref app#201403281973. n/a for the maher ordinance #155-13Details
auto fire sprinkler. t.i., 2nd floor, room 243: relocating (2) sprinklers. ref app#201403281973. n/a for the maher ordinance #155-13 | $1,950 |
| Mar 28, 2014 | Never finaled issued Mar 2014, no final | 3400 Laguna St | interior room remodel #243. remodel extg bathroom and bedroom, replace plmg and elec. fixtures, hardware and finishes. no change to bldg egress, exterior, or square footage.n/a for the maher ordinance #155-13Details
interior room remodel #243. remodel extg bathroom and bedroom, replace plmg and elec. fixtures, hardware and finishes. no change to bldg egress, exterior, or square footage.n/a for the maher ordinance #155-13 | $17,000 | |
| Mar 28, 2014 | Never finaled issued Mar 2014, no final | 3400 Laguna St | combine bedrooms #210 and 211 to one unit, demo 1 bathroom and convert to wet bar(no stove or gas cooking appliances). no change to bldg egress, exterior, or square footage.n/a for the maher ordinance #155-13Details
combine bedrooms #210 and 211 to one unit, demo 1 bathroom and convert to wet bar(no stove or gas cooking appliances). no change to bldg egress, exterior, or square footage.n/a for the maher ordinance #155-13 | $24,000 | |
| Nov 14, 2013 | Completed final sign-off Mar 2014 | 3400 Laguna St | Hildebrand Renovation | #223- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft.Details
#223- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft. | $15,000 |
| Nov 14, 2013 | Completed final sign-off Mar 2014 | 3400 Laguna St | Hildebrand Renovation | #231- interior bathroom & wet bar remodel, replace fixtures and renovate finishes at wet bar, install bench & glass shower surround @ existing bath. 445 sq.ft.Details
#231- interior bathroom & wet bar remodel, replace fixtures and renovate finishes at wet bar, install bench & glass shower surround @ existing bath. 445 sq.ft. | $20,000 |
| Nov 14, 2013 | Completed final sign-off Mar 2014 | 3400 Laguna St | Hildebrand Renovation | #219- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft.Details
#219- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft. | $15,000 |
| Sep 26, 2013 | Never finaled issued Sep 2013, no final | 3400 Laguna St | C.R. Fire Line Inc | to relocate a/s head in front of hvac plenum - code enforcement - nfpa 13 per sffd fire inspector insturction. ref #201306129344.Details
to relocate a/s head in front of hvac plenum - code enforcement - nfpa 13 per sffd fire inspector insturction. ref #201306129344. | $1,275 |
| Jun 12, 2013 | Never finaled issued Jun 2013, no final | 3400 Laguna St | Hildebrand Renovation | barrier removal. combine small existing mens and womens toilet rooms into 1 unisex, single accomodation toilet room. ch 11b compliant. install drinking fountain, ch 11e compliantDetails
barrier removal. combine small existing mens and womens toilet rooms into 1 unisex, single accomodation toilet room. ch 11b compliant. install drinking fountain, ch 11e compliant | $42,000 |
| Jun 12, 2013 | Never finaled issued Jul 2013, no final | 3400 Laguna St | Hildebrand Renovation | remodel basement level resident common use spaces. subdivide existing common use spaces into rooms. fitness center, arts and crafts, wellness center, laundryDetails
remodel basement level resident common use spaces. subdivide existing common use spaces into rooms. fitness center, arts and crafts, wellness center, laundry | $49,000 |
| Oct 5, 2012 | Expired or cancelled cancelled Feb 2017 | 3400 Laguna St | Allan Automatic Sprinkler | addition of sprinkelrs to 1st floor from existing system.Details
addition of sprinkelrs to 1st floor from existing system. | $34,000 |
| Sep 27, 2012 | Completed final sign-off Dec 2012 | 3400 Laguna St | Hildebrand Renovation | 3rd floor-join adjacent rooms #304 & 305-convert 1 bathroom into a wet bar. provide misc plumbing, electrical, trim, paint & carpetDetails
3rd floor-join adjacent rooms #304 & 305-convert 1 bathroom into a wet bar. provide misc plumbing, electrical, trim, paint & carpet | $17,000 |
| Aug 21, 2012 | Completed final sign-off Dec 2012 | 3400 Laguna St | Hildebrand Renovation | units #121/220/240/307/418-interior bathroom remodel to 5 existing apartment bathrooms. new carpet, trim and paint.Details
units #121/220/240/307/418-interior bathroom remodel to 5 existing apartment bathrooms. new carpet, trim and paint. | $100,000 |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 3400 Laguna St | Bruce Construction | #103- remove bathtub and cultured marble surround and replace with cultured marble shower pan and cultured marble wall surround.Details
#103- remove bathtub and cultured marble surround and replace with cultured marble shower pan and cultured marble wall surround. | $8,000 |
| Feb 6, 2012 | Completed final sign-off Apr 2012 | 3400 Laguna St | Hildebrand Renovation | renovate unit 331 with bathroom remodeling & wet bar. renovate unit 421 perry bldg with bathroom remodel.Details
renovate unit 331 with bathroom remodeling & wet bar. renovate unit 421 perry bldg with bathroom remodel. | $62,000 |
| Jul 28, 2011 | Completed final sign-off Sep 2011 | 3400 Laguna St | Hildebrand Renovation | unit 247 on 2nd floor: remodel bathroom, misc. electrical, trim paint. unit 330: remodel bath, add wet bar ( no cooking), misc. electrical, trim , paintDetails
unit 247 on 2nd floor: remodel bathroom, misc. electrical, trim paint. unit 330: remodel bath, add wet bar ( no cooking), misc. electrical, trim , paint | $92,000 |
| Jul 21, 2011 | Completed final sign-off Sep 2011 | 3400 Laguna St | California Fire & Electric Inc | relocate 2 fire alarm horn strobes in apts 402 and 302. revision to an existing fa system.Details
relocate 2 fire alarm horn strobes in apts 402 and 302. revision to an existing fa system. | $2,000 |
| May 10, 2011 | Completed final sign-off Aug 2011 | 3400 Laguna St | Hildebrand Renovation | combine units 302 & 303 to 1 unit, renovate the bathroom and add new bar type kitchen with no cooking facility. combine units 402 & 403 to 1 unit,renovate the bathrm and add new bar type kitchen w/ no cooking facility. unit 206 bathroom renovation. fire life safety on separate permit.Details
combine units 302 & 303 to 1 unit, renovate the bathroom and add new bar type kitchen with no cooking facility. combine units 402 & 403 to 1 unit,renovate the bathrm and add new bar type kitchen w/ no cooking facility. unit 206 bathroom renovation. fire life safety on separate permit. | $78,000 |
| Oct 15, 2010 | Completed final sign-off Feb 2011 | 3400 Laguna St | Hildebrand Renovation | reno to units # 310/311: new bath, bar area (no subject to dwelling unit merger per planning motion# m-10738) unit# 237 : new bath, bar area. unit# 328 new bath, bar area.Details
reno to units # 310/311: new bath, bar area (no subject to dwelling unit merger per planning motion# m-10738) unit# 237 : new bath, bar area. unit# 328 new bath, bar area. | $78,000 |
| Aug 12, 2010 | Completed final sign-off Oct 2010 | 3400 Laguna St | Bruce Construction | unit #411p:remove bathtub & replace w/ shower pan, remove & replace shower valve & cultured marble wall cover. no work to lighting or exhaust system.Details
unit #411p:remove bathtub & replace w/ shower pan, remove & replace shower valve & cultured marble wall cover. no work to lighting or exhaust system. | $8,500 |
| Jul 19, 2010 | Never finaled issued Jul 2010, no final | 3400 Laguna St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| May 21, 2010 | Completed final sign-off Sep 2010 | 3400 Laguna St | Hildebrand Renovation | room 314: renovate and relocate interior non bearing walls to add space by incorporating utility closets to room 314. add small non cooking kitchenette sink, refrig, microwave only. minor cosmetic additions. rooms 320 and 321: combine 2 existig rooms to create 1 br unit with non cooking kitchenetteDetails
room 314: renovate and relocate interior non bearing walls to add space by incorporating utility closets to room 314. add small non cooking kitchenette sink, refrig, microwave only. minor cosmetic additions. rooms 320 and 321: combine 2 existig rooms to create 1 br unit with non cooking kitchenette | $28,000 |
| Apr 9, 2010 | Completed final sign-off Apr 2010 | 3400 Laguna St | California Fire & Electric Inc | elevator recall system/fire alarm system (3) smoke detectors and (2) relaysDetails
elevator recall system/fire alarm system (3) smoke detectors and (2) relays | $23,000 |
| Aug 1, 2005 | Completed final sign-off Oct 2005 | 3400 Laguna St | Mayta & Jensen | unit #244- change tub to shower,shower door must swing out,can't swing in.new valve & head, new tileDetails
unit #244- change tub to shower,shower door must swing out,can't swing in.new valve & head, new tile | $7,500 |
| Apr 25, 2005 | Never finaled issued Apr 2005, no final | 3400 Laguna St | street spaceDetails
street space | ||
| May 7, 2002 | Completed final sign-off Aug 2002 | 3400 Laguna St | Western Roofing Service | reroofingDetails
reroofing | $300,000 |
| Jun 20, 2001 | Expired or cancelled expired Oct 2001 | 3400 Laguna St | Intellisec | to renew permit#9906542 for final inspection.Details
to renew permit#9906542 for final inspection. | |
| Jan 29, 2001 | Expired or cancelled expired May 2001 | 3400 Laguna St | install automatic fire supression sys. hood & duct. this is a rework most parts are existingDetails
install automatic fire supression sys. hood & duct. this is a rework most parts are existing | $1,600 | |
| Jan 4, 2000 | Completed final sign-off Aug 2001 | 3400 Laguna St | Eurocraft Construction | to install freight elevator & reconfigure staircase as per plans submittedDetails
to install freight elevator & reconfigure staircase as per plans submitted | $80,000 |
Find contractors for work like this