Lara Conte
- Listed as
- architect, authorized agent-others
- Firm
- Nelson Nelco Architecture
- Based in
- Tiburon
- On San Francisco permits
- Feb 2001 to Dec 2021
16 permits since 2000 (architect on 15 permits, authorized agent-others on 1 permit): 11 completed, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2021 | Completed final sign-off Jan 2024 | 417 27th St | Donny Chu Construction Inc Dba D C Cons | demolish (e) wood deck & stair in rear yard & replace w/rebuilt wood deck & stair in similar configuration. rebuilt deck is slightly larger & stair is reconfigured closer to house. rebuilt deck requires rear yard variance & will extend no farther than adjacent resident deck. 2021-009274var pcl.Details
demolish (e) wood deck & stair in rear yard & replace w/rebuilt wood deck & stair in similar configuration. rebuilt deck is slightly larger & stair is reconfigured closer to house. rebuilt deck requires rear yard variance & will extend no farther than adjacent resident deck. 2021-009274var pcl. | $35,000 |
| Feb 26, 2016 | Completed final sign-off Feb 2017 | 601 Montgomery St | Evans & Son Inc | 12th floor: barrier removal at (e) office space in (e) building. reverse door swing at both entries to office and provide accessible clearances. maher not reqDetails
12th floor: barrier removal at (e) office space in (e) building. reverse door swing at both entries to office and provide accessible clearances. maher not req | $5,000 |
| Oct 8, 2014 | Completed final sign-off Mar 2015 | 3400 Laguna St | Hildebrand Renovation | #246- interior bedroom/bathroom remodel, remodel existing bedroom & bathroom, replace plumbing & electrical fixtures, hardware & finishes. no change to building egress, exterior or area. n/a ordinance #155-13.Details
#246- interior bedroom/bathroom remodel, remodel existing bedroom & bathroom, replace plumbing & electrical fixtures, hardware & finishes. no change to building egress, exterior or area. n/a ordinance #155-13. | $17,000 |
| Jul 24, 2014 | Expired or cancelled cancelled Nov 2024 | 315 Montgomery St | interior t.i. consisting of interior selective deconstruction & reconstruction for a banking center on the ground floor of an (e) buildilng. no change in building area or foot print. add 2 accessible restroom. ** maher: compliance with ordinance no# 155-13 not required **Details
interior t.i. consisting of interior selective deconstruction & reconstruction for a banking center on the ground floor of an (e) buildilng. no change in building area or foot print. add 2 accessible restroom. ** maher: compliance with ordinance no# 155-13 not required ** | $150,000 | |
| Jul 15, 2014 | Never finaled issued Jan 2015, no final | 1600 Ocean Av | G Swanson Constr. Inc. | tenant improvement. proposed a walk-in atm vestibule & build an interior atm room. no change in building area or footprint. no change to building exterior other than signage & canavas canopy color.Details
tenant improvement. proposed a walk-in atm vestibule & build an interior atm room. no change in building area or footprint. no change to building exterior other than signage & canavas canopy color. | $60,000 |
| Mar 28, 2014 | Never finaled issued Mar 2014, no final | 3400 Laguna St | interior room remodel #243. remodel extg bathroom and bedroom, replace plmg and elec. fixtures, hardware and finishes. no change to bldg egress, exterior, or square footage.n/a for the maher ordinance #155-13Details
interior room remodel #243. remodel extg bathroom and bedroom, replace plmg and elec. fixtures, hardware and finishes. no change to bldg egress, exterior, or square footage.n/a for the maher ordinance #155-13 | $17,000 | |
| Mar 28, 2014 | Never finaled issued Mar 2014, no final | 3400 Laguna St | combine bedrooms #210 and 211 to one unit, demo 1 bathroom and convert to wet bar(no stove or gas cooking appliances). no change to bldg egress, exterior, or square footage.n/a for the maher ordinance #155-13Details
combine bedrooms #210 and 211 to one unit, demo 1 bathroom and convert to wet bar(no stove or gas cooking appliances). no change to bldg egress, exterior, or square footage.n/a for the maher ordinance #155-13 | $24,000 | |
| Nov 14, 2013 | Completed final sign-off Mar 2014 | 3400 Laguna St | Hildebrand Renovation | #219- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft.Details
#219- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft. | $15,000 |
| Nov 14, 2013 | Completed final sign-off Mar 2014 | 3400 Laguna St | Hildebrand Renovation | #231- interior bathroom & wet bar remodel, replace fixtures and renovate finishes at wet bar, install bench & glass shower surround @ existing bath. 445 sq.ft.Details
#231- interior bathroom & wet bar remodel, replace fixtures and renovate finishes at wet bar, install bench & glass shower surround @ existing bath. 445 sq.ft. | $20,000 |
| Nov 14, 2013 | Completed final sign-off Mar 2014 | 3400 Laguna St | Hildebrand Renovation | #223- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft.Details
#223- interior bathroom remodel, replace fixtures and renovate finishes at room. 225 sq.ft. | $15,000 |
| Jul 23, 2013 | Completed final sign-off Feb 2014 | 345 California St | Hathaway Dinwiddie Co. | flrs 28 and 29: non-structural demo (n) non-structural partitions lighting, electrical, finishes, no change in area, occupancy or useDetails
flrs 28 and 29: non-structural demo (n) non-structural partitions lighting, electrical, finishes, no change in area, occupancy or use | $252,226 |
| May 28, 2013 | Completed final sign-off Sep 2013 | 701 Grant Av | G Swanson Constr. Inc. | interior accessibility upgrade, correct entry landing slope to max 2% at front doorDetails
interior accessibility upgrade, correct entry landing slope to max 2% at front door | $20,000 |
| Aug 21, 2012 | Completed final sign-off Dec 2012 | 3400 Laguna St | Hildebrand Renovation | units #121/220/240/307/418-interior bathroom remodel to 5 existing apartment bathrooms. new carpet, trim and paint.Details
units #121/220/240/307/418-interior bathroom remodel to 5 existing apartment bathrooms. new carpet, trim and paint. | $100,000 |
| Jul 18, 2011 | Completed final sign-off Dec 2011 | 345 Montgomery St | Hathaway Dinwiddie Co. | exterior barrier removal at existing exterior bank atms in response to citation 201130461. improve scope for max 2% and 30"x48 clear space in front of (e) atmsDetails
exterior barrier removal at existing exterior bank atms in response to citation 201130461. improve scope for max 2% and 30"x48 clear space in front of (e) atms | $25,000 |
| Jun 22, 2011 | Completed final sign-off Nov 2011 | 201 Spear St | Turner Construction Co | 9th floor - rev. to pa# 2010.11.03.4267. remove opperable partition ( no longer proposed). add elec. equipment in rf room # 934Details
9th floor - rev. to pa# 2010.11.03.4267. remove opperable partition ( no longer proposed). add elec. equipment in rf room # 934 | $5,000 |
| Feb 22, 2001 | Expired or cancelled expired Dec 2001 | 1902 Filbert St | remodel to 2 bathrms, 1 kitchen & replacement of 1 skylight (matching (e) size/ht.) skylt chg to temDetails
remodel to 2 bathrms, 1 kitchen & replacement of 1 skylight (matching (e) size/ht.) skylt chg to tem | $20,000 |