Block 3650, lot 050
240 Chattanooga St
- City’s use
- Multi-Family Residential
- Built
- 1964
- Stories
- 2
- Units
- 30
- Rooms
- 30 bathrooms
- Building
- 17,740 sq ft
- Lot
- 4,375 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
39 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2022 | Completed final sign-off Nov 2022 | 240 Chattanooga St | Mendez-Ortiz Contractors | apt 2. renovate in kind, kitchen and bathroom, plumbing and electrical as needed.Details
apt 2. renovate in kind, kitchen and bathroom, plumbing and electrical as needed. | $19,500 |
| Apr 22, 2022 | Completed final sign-off Jul 2022 | 240 Chattanooga St | Mendez-Ortiz Contractors | unit 3: renovate (1) kitchen and (1) bathroom in kind. electrical and plumbing as needed.Details
unit 3: renovate (1) kitchen and (1) bathroom in kind. electrical and plumbing as needed. | $20,000 |
| Feb 11, 2021 | Completed final sign-off Apr 2021 | 240 Chattanooga St | G M Building And Construction Inc | apt 1 & 4: remodel kitchen and bathroom in kind. upgrade/replace electrical and plumbing fixutres as needed.Details
apt 1 & 4: remodel kitchen and bathroom in kind. upgrade/replace electrical and plumbing fixutres as needed. | $35,000 |
| Nov 1, 2019 | Completed final sign-off Feb 2020 | 240 Chattanooga St | B B J Electric, Inc | install new fire alarm system, 1 facu, 2 power supply annunciator, 72 lf horns, 1 flow, 2 tamper, 20 smoke detectors, 4 heats, 7 pulls, 16 horn strobes.Details
install new fire alarm system, 1 facu, 2 power supply annunciator, 72 lf horns, 1 flow, 2 tamper, 20 smoke detectors, 4 heats, 7 pulls, 16 horn strobes. | $68,950 |
| Aug 27, 2019 | Completed final sign-off Nov 2019 | 240 Chattanooga St | Flanagan Construction | revision to app#201607071765 r-5 no change of material, only configuration of ground level front windows and extend portion of wall at entry.Details
revision to app#201607071765 r-5 no change of material, only configuration of ground level front windows and extend portion of wall at entry. | |
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 240 Chattanooga St | street spaceDetails
street space | ||
| Jul 3, 2019 | Never finaled issued Jul 2019, no final | 240 Chattanooga St | street spaceDetails
street space | ||
| Jun 14, 2019 | Completed final sign-off Nov 2019 | 240 Chattanooga St | Mendez-Ortiz Contractors | apt 9: renovate kitchen & bathroom in-kind including plumbing and electrical fixture upgrades as needed. no walls removed or modified.Details
apt 9: renovate kitchen & bathroom in-kind including plumbing and electrical fixture upgrades as needed. no walls removed or modified. | $16,000 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 240 Chattanooga St | street spaceDetails
street space | ||
| Mar 28, 2019 | Completed final sign-off Dec 2019 | 240 Chattanooga St | Speedy Construction Inc | add (1) adu. studio with (1) bathroom per ord #162-16. (6) adus added under appln #201607671765Details
add (1) adu. studio with (1) bathroom per ord #162-16. (6) adus added under appln #201607671765 | $75,000 |
| Mar 21, 2019 | Completed final sign-off Sep 2019 | 240 Chattanooga St | P Jordan Builders Inc | repair dry rot to right side/back & replace 43 windows not visable from street, replace stucco in same location.Details
repair dry rot to right side/back & replace 43 windows not visable from street, replace stucco in same location. | $75,000 |
| Jan 7, 2019 | Never finaled issued Jan 2019, no final | 240 Chattanooga St | street space onlyDetails
street space only | ||
| Dec 14, 2018 | Completed final sign-off Jan 2020 | 240 Chattanooga St | P Jordan Builders Inc | repair dry rot on left side, all (3) storiesDetails
repair dry rot on left side, all (3) stories | $65,000 |
| Dec 3, 2018 | Never finaled issued Dec 2018, no final | 240 Chattanooga St | O'connor Plumbing & Fire Protection | install77 new sprinklers throughout 1st & 2nd floor of new adu per nfpa 13r. underground fire service per nfpa 24. ref app#201607071765Details
install77 new sprinklers throughout 1st & 2nd floor of new adu per nfpa 13r. underground fire service per nfpa 24. ref app#201607071765 | $25,000 |
| Nov 6, 2018 | Never finaled issued Nov 2018, no final | 240 Chattanooga St | street spaceDetails
street space | ||
| Oct 31, 2018 | Completed final sign-off Dec 2019 | 240 Chattanooga St | Mendez-Ortiz Contractors | revision to app#201607071765. add bedroom and 1/2 bath to unit #34Details
revision to app#201607071765. add bedroom and 1/2 bath to unit #34 | $30,000 |
| Aug 20, 2018 | Completed final sign-off Oct 2018 | 240 Chattanooga St | Mendez-Ortiz Contractors | unit 25: renovate kitchen and bathroom in kind. plumbing and electrical as needed.Details
unit 25: renovate kitchen and bathroom in kind. plumbing and electrical as needed. | $20,000 |
| Jul 25, 2018 | Never finaled issued Jul 2018, no final | 240 Chattanooga St | street spaceDetails
street space | ||
| Apr 6, 2018 | Completed final sign-off Aug 2018 | 240 Chattanooga St | Mendez-Ortiz Contractors | renovate apt #b kitchen and bathroom in kind plmg and elect. as neeeded. no moving of doors or walls.Details
renovate apt #b kitchen and bathroom in kind plmg and elect. as neeeded. no moving of doors or walls. | $36,000 |
| Jun 22, 2017 | Completed final sign-off Aug 2017 | 240 Chattanooga St | Mendez-Ortiz Contractors | #15- renovate kitchen and bathroom all in kind, plumbing and electrical as needed.Details
#15- renovate kitchen and bathroom all in kind, plumbing and electrical as needed. | $12,500 |
| Feb 17, 2017 | Completed final sign-off May 2017 | 240 Chattanooga St | Mendez-Ortiz Contractors | renovate kitchen and bathroom. replace in kind. kitche and bathroom all plumbing and electrical as neededDetails
renovate kitchen and bathroom. replace in kind. kitche and bathroom all plumbing and electrical as needed | $12,000 |
| Jul 7, 2016 | Completed final sign-off Dec 2019 | 240 Chattanooga St | Mendez-Ortiz Contractors | addition of 6 units under ord# 30-15 within the (e) building envelope. work include 6 kitchen & 10 bathroom. 11 bedrooms. soft story pa# 2016/06/09/9515.Details
addition of 6 units under ord# 30-15 within the (e) building envelope. work include 6 kitchen & 10 bathroom. 11 bedrooms. soft story pa# 2016/06/09/9515. | $750,000 |
| Jun 9, 2016 | Completed final sign-off Sep 2019 | 240 Chattanooga St | P Jordan Builders Inc | soft story retrofit to comply with sfbc chap 34b on iebc appendix a4 structural calculations. permit is for seismic retrofit only. all other structural work pertaining to the remodel: unit addition is filed under a seperate permit.Details
soft story retrofit to comply with sfbc chap 34b on iebc appendix a4 structural calculations. permit is for seismic retrofit only. all other structural work pertaining to the remodel: unit addition is filed under a seperate permit. | $300,000 |
| Mar 10, 2016 | Completed final sign-off May 2016 | 240 Chattanooga St | M H M Construction | apt 10:renovate kitchen & bathroom. upgrade electrical and plumbing as needed. replce windows on bedroom and living room not visiable to street. windows u-factor max 0.32.Details
apt 10:renovate kitchen & bathroom. upgrade electrical and plumbing as needed. replce windows on bedroom and living room not visiable to street. windows u-factor max 0.32. | $18,000 |
| Mar 10, 2016 | Completed final sign-off Mar 2016 | 240 Chattanooga St | M H M Construction | apt #7: replace windows in bedroom and living room in-kind not visiable to street. max u-factor shall not exceed 0.32.Details
apt #7: replace windows in bedroom and living room in-kind not visiable to street. max u-factor shall not exceed 0.32. | $1,000 |
| Jan 6, 2016 | Completed final sign-off Mar 2016 | 240 Chattanooga St | M H M Construction | unit #7: renovate kitchen and bathroom in-kind. plumbing and electrical as needed.Details
unit #7: renovate kitchen and bathroom in-kind. plumbing and electrical as needed. | $15,000 |
| Jul 16, 2015 | Completed final sign-off Sep 2015 | 240 Chattanooga St | M H M Construction | unit 13: renovate kitchen and bathroom. no change in layout. all work in-kind. plumibng and electrical as needed. no wall modification m, no structural work.Details
unit 13: renovate kitchen and bathroom. no change in layout. all work in-kind. plumibng and electrical as needed. no wall modification m, no structural work. | $13,000 |
| Jun 15, 2015 | Completed final sign-off Sep 2015 | 240 Chattanooga St | M H M Construction | unit 19: renovate kitchen and (1) bathroom. no change in layout, all work in-kind. all plumbing and electrical as needed.Details
unit 19: renovate kitchen and (1) bathroom. no change in layout, all work in-kind. all plumbing and electrical as needed. | $12,000 |
| Apr 6, 2015 | Completed final sign-off Jun 2015 | 240 Chattanooga St | M H M Construction | renovate kitchen & bathroom. all electrical & plumbing as needed.Details
renovate kitchen & bathroom. all electrical & plumbing as needed. | $31,000 |
| Mar 16, 2015 | Completed final sign-off Jun 2015 | 240 Chattanooga St | M H M Construction | unit 22: renovate kitchen & bathroom, all plumbing & electrical as needed.Details
unit 22: renovate kitchen & bathroom, all plumbing & electrical as needed. | $12,000 |
| Feb 10, 2015 | Completed final sign-off Mar 2015 | 240 Chattanooga St | M H M Construction | renovate kitchen and bathroom upgrade electrical and plumbing as needed. no structural wallDetails
renovate kitchen and bathroom upgrade electrical and plumbing as needed. no structural wall | $15,000 |
| Feb 10, 2015 | Never finaled issued Feb 2015, no final | 240 Chattanooga St | M H M Construction | to comply with correction notice per building inspector - repair exterior stucco approx 60 sf; repair dryrot wall, replace 2 windows not visible from the street inkindDetails
to comply with correction notice per building inspector - repair exterior stucco approx 60 sf; repair dryrot wall, replace 2 windows not visible from the street inkind | $2,500 |
| Dec 1, 2014 | Completed final sign-off Mar 2015 | 240 Chattanooga St | M H M Construction | unit 6 - renovate kitchen and bathroom plumbing and electrical as needed; no structural work. to comply with cec150.0(k)3 & 5Details
unit 6 - renovate kitchen and bathroom plumbing and electrical as needed; no structural work. to comply with cec150.0(k)3 & 5 | $18,000 |
| Aug 7, 2014 | Expired or cancelled expired Jan 2016 | 240 Chattanooga St | M H M Construction | #18. renovate kitchen and bathroom. 1. kitchen: remove and provide new kitchen cabinets with counter top. all plumbing and electrical as needed. 2. bathroom: replace and provide new fixtures in kind.Details
#18. renovate kitchen and bathroom. 1. kitchen: remove and provide new kitchen cabinets with counter top. all plumbing and electrical as needed. 2. bathroom: replace and provide new fixtures in kind. | $18,000 |
| Mar 7, 2014 | Completed final sign-off Jun 2014 | 240 Chattanooga St | M H M Construction | #23- renovate kitchen and bathroom (no wall alteration). bathroom: replace toilet, vanity, tub, install new ones. kitchen: replace countertop and cabinets. plumbing and electrical as needed, 50% high efficacy lighting in kitchen and bathroom, no structural work.Details
#23- renovate kitchen and bathroom (no wall alteration). bathroom: replace toilet, vanity, tub, install new ones. kitchen: replace countertop and cabinets. plumbing and electrical as needed, 50% high efficacy lighting in kitchen and bathroom, no structural work. | $18,000 |
| Jan 7, 2014 | Completed final sign-off Jan 2014 | 240 Chattanooga St | M H M Construction | #17: renovate kitchen and bathrooms. replace bathroom window in kind - not visible from street. remove bathroom, tub, toilet vanity faucet. install new one. kitchen: remoove cabinets, coutertop. all plumbing and electrical as needed. no structural work 50% high efficacy lighting on kitchen.Details
#17: renovate kitchen and bathrooms. replace bathroom window in kind - not visible from street. remove bathroom, tub, toilet vanity faucet. install new one. kitchen: remoove cabinets, coutertop. all plumbing and electrical as needed. no structural work 50% high efficacy lighting on kitchen. | $18,000 |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 240 Chattanooga St | street spaceDetails
street space | ||
| Nov 27, 2013 | Completed final sign-off Mar 2014 | 240 Chattanooga St | M H M Construction | unit a - renovate kitchen and bathroom, remove kitchen cabinets counter top, install new one, remove bathroom, tub, toilet, faucet. all electrical work and plumbing as needed. it no structural work 50% high efficacy lighting in kitchen. install light sensors in bathroomDetails
unit a - renovate kitchen and bathroom, remove kitchen cabinets counter top, install new one, remove bathroom, tub, toilet, faucet. all electrical work and plumbing as needed. it no structural work 50% high efficacy lighting in kitchen. install light sensors in bathroom | $18,000 |
| Apr 18, 2013 | Completed final sign-off Apr 2013 | 240 Chattanooga St | L And P Construction | unit #a - comply w/complaint #201396665 #4 & 5 - remove & replace damaged dry walls w/5/8 type "x".Details
unit #a - comply w/complaint #201396665 #4 & 5 - remove & replace damaged dry walls w/5/8 type "x". | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- M H M Construction (14), Mendez-Ortiz Contractors (9), P Jordan Builders Inc (3), B B J Electric, Inc, Flanagan Construction, G M Building And Construction Inc, L And P Construction, O'connor Plumbing & Fire Protection, Speedy Construction Inc
- Architects
- Michael Harris (4)
- Engineers
- Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.