Block 0272, lot 008
698 Bush St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 5
- Units
- 45
- Rooms
- 33 bathrooms
- Building
- 21,750 sq ft
- Lot
- 4,624 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
38 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 8, 2025 | Completed final sign-off Jul 2025 | 698 Bush St | recommencement and completion of work for 202001091576, 202001091578, 202006128493Details
recommencement and completion of work for 202001091576, 202001091578, 202006128493 | $60,000 | |
| Apr 8, 2025 | Completed final sign-off Apr 2025 | 698 Bush St | recommencement and completion of work for 202007270829.Details
recommencement and completion of work for 202007270829. | ||
| Feb 1, 2024 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | to correct nov 202036881/patch holes in floor repair joist, unit 101a. remove all unpermitted partitoins, revert back to last legal condtiion.Details
to correct nov 202036881/patch holes in floor repair joist, unit 101a. remove all unpermitted partitoins, revert back to last legal condtiion. | $4,000 | |
| Feb 24, 2023 | Completed final sign-off May 2023 | 698 Bush St | G M Building And Construction Inc | #501. revison to pa# 202302021227. renovate entire apt, remove all plaster. remove non structural wall.Details
#501. revison to pa# 202302021227. renovate entire apt, remove all plaster. remove non structural wall. | $1,000 |
| Feb 2, 2023 | Completed final sign-off May 2023 | 698 Bush St | G M Building And Construction Inc | #501. renovate 1 kitchen and 1 bathroom in kind. plumbing and electrical as needed. non structural.Details
#501. renovate 1 kitchen and 1 bathroom in kind. plumbing and electrical as needed. non structural. | $17,500 |
| Oct 19, 2021 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | G M Building And Construction Inc | unit 403: renovate kitchen and bath in kind.Details
unit 403: renovate kitchen and bath in kind. | $29,000 |
| Aug 27, 2020 | Completed final sign-off Apr 2021 | 698 Bush St | Crime Watch Security Sys Llc | upgrde (e) fire alarm system to comply w/sffc section 1103.7.6.1 & include sprinkler monitoring. ref pa#201804166433Details
upgrde (e) fire alarm system to comply w/sffc section 1103.7.6.1 & include sprinkler monitoring. ref pa#201804166433 | $90,000 |
| Jul 27, 2020 | Expired or cancelled expired Apr 2025 | 698 Bush St | Doherty Restoration, Inc. | add toilet & shower, sink , at units 204, 205, 206, 406 & 504.Details
add toilet & shower, sink , at units 204, 205, 206, 406 & 504. | $30,000 |
| Jul 6, 2020 | Never finaled issued Jul 2020, no final | 698 Bush St | street spaceDetails
street space | ||
| Jun 16, 2020 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | Doherty Restoration, Inc. | unit #204: replace bathroom fixtures, kitchen cabinets and sink in kind , same location.Details
unit #204: replace bathroom fixtures, kitchen cabinets and sink in kind , same location. | $15,500 |
| Jun 16, 2020 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | Doherty Restoration, Inc. | unit #504: replacing bathroom fixtures, kitchen cabinets and sink in kindDetails
unit #504: replacing bathroom fixtures, kitchen cabinets and sink in kind | $15,500 |
| Jun 16, 2020 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | Doherty Restoration, Inc. | unit #406: replacing bathroom fixtures, kitchen cabinets and sink in kind ,in same location.Details
unit #406: replacing bathroom fixtures, kitchen cabinets and sink in kind ,in same location. | $15,500 |
| Jun 12, 2020 | Expired or cancelled expired Jul 2025 | 698 Bush St | Doherty Restoration, Inc. | unit #308: remodel existing bath and kitchen in kind.Details
unit #308: remodel existing bath and kitchen in kind. | $25,000 |
| Jan 9, 2020 | Completed final sign-off Jun 2020 | 698 Bush St | West Peak Construction | unit #402: kitchen and bathroom remodel in kindDetails
unit #402: kitchen and bathroom remodel in kind | $15,000 |
| Jan 9, 2020 | Completed final sign-off Jun 2020 | 698 Bush St | West Peak Construction | unit 302 - kitchen and bathroom remodel in kind.Details
unit 302 - kitchen and bathroom remodel in kind. | $15,000 |
| Jan 9, 2020 | Completed final sign-off Jun 2020 | 698 Bush St | West Peak Construction | unit 106. remodel unit 106. replace sink. no kitchen or bathroom in unit. upgrade electricalDetails
unit 106. remodel unit 106. replace sink. no kitchen or bathroom in unit. upgrade electrical | $10,000 |
| Jan 9, 2020 | Expired or cancelled expired Jul 2025 | 698 Bush St | West Peak Construction | unit # 507: kitchen and bathroom remodel in kindDetails
unit # 507: kitchen and bathroom remodel in kind | $15,000 |
| Jan 9, 2020 | Expired or cancelled expired Jul 2025 | 698 Bush St | West Peak Construction | apt 508: kitchen and bathroom remodel in kind. in same location.Details
apt 508: kitchen and bathroom remodel in kind. in same location. | $15,000 |
| Aug 20, 2019 | Never finaled issued Aug 2019, no final | 698 Bush St | B-Side Inc. | unit 306: new cabinets in kitchen, new sink to comply w/nov #201973069Details
unit 306: new cabinets in kitchen, new sink to comply w/nov #201973069 | $10,000 |
| Apr 16, 2018 | Expired or cancelled cancelled Aug 2023 | 698 Bush St | legalization of a guest room at the first floor of an existing 45 unit 5-story residential bldg, all work located w/ in (e) bldg envelope.Details
legalization of a guest room at the first floor of an existing 45 unit 5-story residential bldg, all work located w/ in (e) bldg envelope. | $20,000 | |
| Jul 3, 2017 | Completed final sign-off Oct 2017 | 698 Bush St | Canning Electric Inc | excavating 2'-6" deep utility put inhte basement. install rebar & concrete per drawings in basement storage for new recessed floor. work to be done in preparation for new switchgear.Details
excavating 2'-6" deep utility put inhte basement. install rebar & concrete per drawings in basement storage for new recessed floor. work to be done in preparation for new switchgear. | $10,000 |
| Mar 9, 2016 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | to comply with nov 201575102: revision to ref pa 2015 0331 2385: change of designmion from effeciency studio to group housing, no work. remove cook top & hood.Details
to comply with nov 201575102: revision to ref pa 2015 0331 2385: change of designmion from effeciency studio to group housing, no work. remove cook top & hood. | $2,000 | |
| Mar 9, 2016 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | to comlpy with nov 201575102: revision to ref pa 2015 0814 4319: for unit 405, change of designation from efficency studio to group housing. design revision includes relocation of proposed kitchenette. no additional work, no change to envelope. remove previously approved cooktopDetails
to comlpy with nov 201575102: revision to ref pa 2015 0814 4319: for unit 405, change of designation from efficency studio to group housing. design revision includes relocation of proposed kitchenette. no additional work, no change to envelope. remove previously approved cooktop | ||
| Mar 9, 2016 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | interior renovation of (e) group housing unit within (e) non-conforming residential bld. addition of toilet, sink & hood. renovation also includes addition of storage closet w/access from public way. no change to () bld envelope.Details
interior renovation of (e) group housing unit within (e) non-conforming residential bld. addition of toilet, sink & hood. renovation also includes addition of storage closet w/access from public way. no change to () bld envelope. | $20,000 | |
| Aug 14, 2015 | Completed final sign-off Jun 2016 | 698 Bush St | Boss Construction Inc. | unit 405, interior renovation of extg unit within (e) non ada compliant buildgin will include: the addition of a toilet, stove, shower and ventless hoodDetails
unit 405, interior renovation of extg unit within (e) non ada compliant buildgin will include: the addition of a toilet, stove, shower and ventless hood | $20,000 |
| Aug 5, 2015 | Never finaled issued Aug 2015, no final | 698 Bush St | Markoff Structural Pest Control | min #4 rebar dowells 12" epoxied in place, min #4 2 horizontal rebar running length of footing cap. min 16" spliceDetails
min #4 rebar dowells 12" epoxied in place, min #4 2 horizontal rebar running length of footing cap. min 16" splice | $60,000 |
| Jul 31, 2015 | Completed final sign-off Jun 2016 | 698 Bush St | Boss Construction Inc. | 1) remodel unit 202 at the 2nd floor. 2)add washer and dryer. 3)remodel extg kitchen. 4)remodel extg bathroom.Details
1) remodel unit 202 at the 2nd floor. 2)add washer and dryer. 3)remodel extg kitchen. 4)remodel extg bathroom. | $35,000 |
| Mar 31, 2015 | Never finaled issued May 2015, no final | 698 Bush St | Boss Construction Inc. | unit # 107: interior renovation of (e) apt in 9e) non-ada compliant bld. will include the addition of a kitchenette and bathroom. all work within (e) apt. not to exceed bld envelope. no change in occupancyDetails
unit # 107: interior renovation of (e) apt in 9e) non-ada compliant bld. will include the addition of a kitchenette and bathroom. all work within (e) apt. not to exceed bld envelope. no change in occupancy | $11,000 |
| Jul 16, 2013 | Never finaled issued Jul 2013, no final | 698 Bush St | street space w/mtaDetails
street space w/mta | ||
| Jun 4, 2013 | Completed final sign-off Jun 2014 | 698 Bush St | Eagle Ridge Construction And Roofing | to comply with ordinance 029-13 only; installation of grab bars in sro at the following locations: 1 on 1st flr, 1 on 2nd flr, 1 on 3rd flr, 1 on 4th flr, and 1 on 5th flrDetails
to comply with ordinance 029-13 only; installation of grab bars in sro at the following locations: 1 on 1st flr, 1 on 2nd flr, 1 on 3rd flr, 1 on 4th flr, and 1 on 5th flr | $500 |
| Nov 15, 2011 | Never finaled issued Nov 2011, no final | 698 Bush St | K K Electric & Alarm Company | to obtain final inspection for work approved under pa # 200906190836. all work is complete.Details
to obtain final inspection for work approved under pa # 200906190836. all work is complete. | |
| Jun 19, 2009 | Never finaled issued Jun 2009, no final | 698 Bush St | K K Electric & Alarm Company | replace (e) fire alarm panelDetails
replace (e) fire alarm panel | $12,000 |
| Oct 14, 2008 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | K K Electric & Alarm Company | install 7 smoke detectors for elevator recall w/ power supply.Details
install 7 smoke detectors for elevator recall w/ power supply. | $2,000 |
| Dec 14, 2006 | Never finaled issued Dec 2006, no final | 698 Bush St | street space & sidewalkDetails
street space & sidewalk | ||
| Dec 29, 2005 | Never finaled issued Dec 2005, no final | 698 Bush St | street space permitDetails
street space permit | ||
| Aug 9, 2005 | Never finaled issued Aug 2005, no final | 698 Bush St | streetspaceDetails
streetspace | ||
| Aug 8, 2005 | Completed final sign-off Jun 2006 | 698 Bush St | K Lui General Const, | rev. to appl#200109128126 wall anchor (change detail)Details
rev. to appl#200109128126 wall anchor (change detail) | |
| Sep 12, 2001 | Completed final sign-off Jun 2006 | 698 Bush St | K Lui General Const, | seismic ugrade as per bolt plus w/ irregularities corrected for this umbDetails
seismic ugrade as per bolt plus w/ irregularities corrected for this umb | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Doherty Restoration, Inc. (5), West Peak Construction (5), Boss Construction Inc. (3), G M Building And Construction Inc (3), K K Electric & Alarm Company (3), K Lui General Const, (2), B-Side Inc., Canning Electric Inc, Crime Watch Security Sys Llc, Eagle Ridge Construction And Roofing, Markoff Structural Pest Control
- Architects
- Angela Matt, Michael Harris, Neil Kaye
- Engineers
- Kung-Kay Chiu, Kuo Min
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.