Min Kuo
- Listed as
- architect, engineer
- Firm
- K. Lui Construction Inc.
- Based in
- Millbrae
- On San Francisco permits
- May 2005 to May 2025
11 permits since 2000 (engineer on 9 permits, architect on 2 permits): 11 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 20, 2025 | Completed final sign-off Jun 2025 | 210 Clement St | K Lui General Construction Co. | accesibilities upgrade at entrance. new handicap ramp (1"-12") auto door opener, pony wall, kick plate, offset handle and thresholdDetails
accesibilities upgrade at entrance. new handicap ramp (1"-12") auto door opener, pony wall, kick plate, offset handle and threshold | $11,000 |
| Aug 19, 2022 | Completed final sign-off Mar 2023 | 1350 Grant Av | K Lui General Construction Co. | residential: soft story retrofit per sfebc chapt 5e national design method accessibilty compliance.Details
residential: soft story retrofit per sfebc chapt 5e national design method accessibilty compliance. | $90,000 |
| Aug 19, 2022 | Completed final sign-off Mar 2023 | 1350 Grant Av | K Lui General Construction Co. | commercial: soft story retrofit per sfebc champt 5e national design method accessibilty compliance. (soft story)Details
commercial: soft story retrofit per sfebc champt 5e national design method accessibilty compliance. (soft story) | $13,000 |
| Feb 2, 2022 | Completed final sign-off Feb 2023 | 301 Columbus Av | K Lui General Construction Co. | residential. soft story retrofitting per sfebc chapter 5e national design method.Details
residential. soft story retrofitting per sfebc chapter 5e national design method. | $125,000 |
| Feb 2, 2022 | Completed final sign-off Feb 2023 | 301 Columbus Av | K Lui General Construction Co. | commercial. soft story retrofitting per sfebc chapter 5e national design method. accessiblity compliance (soft story)Details
commercial. soft story retrofitting per sfebc chapter 5e national design method. accessiblity compliance (soft story) | $15,000 |
| Oct 3, 2018 | Completed final sign-off Jan 2019 | 801 25th Av | K Lui General Construction Co. | soft story retrofitting per cfbc chapter 4d other rational design method.Details
soft story retrofitting per cfbc chapter 4d other rational design method. | $90,000 |
| Aug 10, 2018 | Completed final sign-off Dec 2018 | 300 Hill St | K Lui General Construction Co. | soft story retrofit per sfbc chapter 4d, 2016 cebc appendix national design methodDetails
soft story retrofit per sfbc chapter 4d, 2016 cebc appendix national design method | $80,000 |
| Dec 22, 2016 | Completed final sign-off Jun 2017 | 1133 Dolores St | K Lui General Construction Co. | soft story retrofit per sfbc chapter 34b engineering criteria for other rational design.Details
soft story retrofit per sfbc chapter 34b engineering criteria for other rational design. | $120,000 |
| Aug 8, 2005 | Completed final sign-off Jun 2006 | 698 Bush St | K Lui General Const, | rev. to appl#200109128126 wall anchor (change detail)Details
rev. to appl#200109128126 wall anchor (change detail) | |
| May 25, 2005 | Completed final sign-off Dec 2005 | 1616 California St | K Lui General Const, | bolt plus with irregular corrected.Details
bolt plus with irregular corrected. | $42,000 |
| May 10, 2005 | Completed final sign-off Aug 2005 | 32 Spofford St | K Lui General Const, | rev.appl#200206199461 steel frame and footing (change detail)Details
rev.appl#200206199461 steel frame and footing (change detail) |