Madero's Construction
- Based in
- Menlo Park
- On San Francisco permits
- Nov 2013 to Jan 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2017 | Completed final sign-off Jul 2017 | 1606 41st Av | install new vent ducts heating (exh fan less than or equal to 40')no change in furnace; n/a maher ord. 155-13Details
install new vent ducts heating (exh fan less than or equal to 40')no change in furnace; n/a maher ord. 155-13 | $200 |
| Nov 9, 2016 | Completed final sign-off Jul 2017 | 1606 41st Av | revision to app#201608296188. voluntarly add concrete footing adjacent to extg property line footing to reinforce inadequacy of extg. approx 40 lf (20 each side) both neighbors are sharing extg ftgs. with subject and appox. 40 lf at rear and garage side where no foundation exist. n/a for maher.Details
revision to app#201608296188. voluntarly add concrete footing adjacent to extg property line footing to reinforce inadequacy of extg. approx 40 lf (20 each side) both neighbors are sharing extg ftgs. with subject and appox. 40 lf at rear and garage side where no foundation exist. n/a for maher. | $8,000 |
| Aug 29, 2016 | Completed final sign-off Jul 2017 | 1606 41st Av | relocate & remodel kitchen. add skylight. add rear yard deck less than 10'-0 from grade. new stair to yard. remodel bath & bedrooms, and dining rm. new door & sidelites to living rm, relocated fireplace. reconfigure new interior stair to ground. develop ground fl. accessory rooms - 2 bedrms, 1 bath.Details
relocate & remodel kitchen. add skylight. add rear yard deck less than 10'-0 from grade. new stair to yard. remodel bath & bedrooms, and dining rm. new door & sidelites to living rm, relocated fireplace. reconfigure new interior stair to ground. develop ground fl. accessory rooms - 2 bedrms, 1 bath. | $126,000 |
| Mar 22, 2016 | Never finaled issued Apr 2016, no final | 716 Wisconsin St | revision to ref pa 2013 1107 1400: replace wood planters at front stairs with metal planters.Details
revision to ref pa 2013 1107 1400: replace wood planters at front stairs with metal planters. | $500 |
| Nov 7, 2013 | Completed final sign-off Apr 2019 | 716 Wisconsin St | add third floor with bedroom, 2nd level interior remodel replace windows, interior remodeling.Details
add third floor with bedroom, 2nd level interior remodel replace windows, interior remodeling. | $175,000 |