Block 2617, lot 036
946 Ashbury St
- City’s use
- Single Family Residential
- Built
- 1907
- Stories
- 4
- Units
- 1
- Rooms
- 6 bedrooms, 3 bathrooms
- Building
- 3,716 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 1, 2016 | Completed final sign-off Jun 2016 | 946 Ashbury St | revision to pa 2015-1030-1334 & 2015-0303-9844 - omitt west facing skylights, omit work under dormer and guardrail at front stair to remain as is.Details
revision to pa 2015-1030-1334 & 2015-0303-9844 - omitt west facing skylights, omit work under dormer and guardrail at front stair to remain as is. | ||
| Oct 30, 2015 | Completed final sign-off Jul 2016 | 946 Ashbury St | Peter Harris Construction Inc | interior remodeling at 3rd floor level including 2 skylights at family room(not visible from the street), 2 new windows at rear elevation, 1 new window at extg location at extg dormer at property line, move interior partitions and doors at 3rd floor.Details
interior remodeling at 3rd floor level including 2 skylights at family room(not visible from the street), 2 new windows at rear elevation, 1 new window at extg location at extg dormer at property line, move interior partitions and doors at 3rd floor. | $10,000 |
| Oct 27, 2015 | Completed final sign-off Dec 2016 | 946 Ashbury St | Peter Harris Construction Inc | interior remodeling at 3rd level including replacing existing bathroom finishes, fixtures, & plumbing. add dormer & skylights @ bathroom.Details
interior remodeling at 3rd level including replacing existing bathroom finishes, fixtures, & plumbing. add dormer & skylights @ bathroom. | $10,000 |
| Jul 17, 2015 | Completed final sign-off Jul 2016 | 946 Ashbury St | Peter Harris Construction Inc | interior remodel of kitchen and bathrooms. install new elevator and revise stair per plan. relocate the rear stair at deck which is less than 30" from grade.Details
interior remodel of kitchen and bathrooms. install new elevator and revise stair per plan. relocate the rear stair at deck which is less than 30" from grade. | $200,000 |
| Mar 3, 2015 | Completed final sign-off Jun 2016 | 946 Ashbury St | Peter Harris Construction Inc | scope of work includes widening extg driveway, replacing extg retaining walls, replace extg garage door, refinish extg stair and handrail, replace extg dormer window and replace windows at side of dormer.Details
scope of work includes widening extg driveway, replacing extg retaining walls, replace extg garage door, refinish extg stair and handrail, replace extg dormer window and replace windows at side of dormer. | $20,000 |
| Jul 14, 2009 | Completed final sign-off Aug 2009 | 946 Ashbury St | Tom Lee Roofing Inc. | reroofing.Details
reroofing. | $22,300 |
| May 18, 2004 | Completed final sign-off Oct 2004 | 946 Ashbury St | Bbc Construction Inc. | 2nd floor bathroom and closet renovation (add 1 bathroom)-non bearing wall removalDetails
2nd floor bathroom and closet renovation (add 1 bathroom)-non bearing wall removal | $20,000 |
| May 8, 2003 | Expired or cancelled cancelled Apr 2004 | 946 Ashbury St | remodel garage-enlarge garage door, renovate & reconfigure some interior on 1 & 2/fDetails
remodel garage-enlarge garage door, renovate & reconfigure some interior on 1 & 2/f | $250,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Peter Harris Construction Inc (4), Bbc Construction Inc., Tom Lee Roofing Inc.
- Architects
- Michael Harris (3), Michael Harris
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.