P-T Group Inc
- Based in
- Richmond
- On San Francisco permits
- Oct 2014 to Mar 2023
- Last 24 months
- 0 permits filed
79 permits since 2000: 57 completed, 19 never finaled, 3 expired or cancelled.
Of the 19 never-finaled permits, 3 are 3 to 5 years old, 11 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2023 | Never finaled issued Mar 2023, no final | 868 Valencia St | pt group add 49 new sprinkler heads in 1st fl to existing system per nfpa 13. existing underground to remain.Details
pt group add 49 new sprinkler heads in 1st fl to existing system per nfpa 13. existing underground to remain. | $18,000 |
| Sep 2, 2022 | Never finaled issued Sep 2022, no final | 711 Post St | move the dry standpipe from the stairs to new position in front of builidng.Details
move the dry standpipe from the stairs to new position in front of builidng. | $2,000 |
| Jul 29, 2022 | Completed final sign-off Feb 2023 | 14 Isis St | install sprinkler system w/ (e) domestic water meter using double check valve & also lower k factor sprinkler heads.Details
install sprinkler system w/ (e) domestic water meter using double check valve & also lower k factor sprinkler heads. | $16,000 |
| Jul 27, 2022 | Completed final sign-off Jul 2023 | 1310 Bacon St | install 13 new sprinkler heads,including new underground 1" pipe to supply fire sprinkler service at new bldg,contractor to connect existing 4" fire service supplying the bldg same lot.Details
install 13 new sprinkler heads,including new underground 1" pipe to supply fire sprinkler service at new bldg,contractor to connect existing 4" fire service supplying the bldg same lot. | $4,500 |
| Mar 10, 2022 | Never finaled issued Mar 2022, no final | 1139 Market St | install 82 sprinklers throughout ground floor per nfpa 13. underground per nfpa 24. ref pa# 202109168595Details
install 82 sprinklers throughout ground floor per nfpa 13. underground per nfpa 24. ref pa# 202109168595 | $40,000 |
| Feb 15, 2022 | Completed final sign-off Jul 2022 | 789 Carolina St | install new fire sprinkler system at ground floor. new adu per nfpa 13. connect to existing fire service. install new backflow preventer (total sprinklers 11). ref 201006104263 (underground/meter existing)Details
install new fire sprinkler system at ground floor. new adu per nfpa 13. connect to existing fire service. install new backflow preventer (total sprinklers 11). ref 201006104263 (underground/meter existing) | $6,006 |
| Dec 10, 2021 | Completed final sign-off Sep 2025 | 2128 Folsom St | install (77) new sprinklers throughout per nfpa#13, underground per nfpa#24Details
install (77) new sprinklers throughout per nfpa#13, underground per nfpa#24 | $35,000 |
| Nov 29, 2021 | Completed final sign-off Jun 2023 | 509 Minna St | install (86) new sprinklers in (n) restroom & sleeping area on 2nd, 3rd & 4th fl. per nfpa #13 ref pa# 2021-0720-4769Details
install (86) new sprinklers in (n) restroom & sleeping area on 2nd, 3rd & 4th fl. per nfpa #13 ref pa# 2021-0720-4769 | $40,000 |
| Nov 5, 2021 | Completed final sign-off May 2023 | 4326 Irving St | install 9 new sprinklers on 4th fl only per nfpa #13. install wet stand pipes per nfpa #14 ref pa 2019-0911-1353 & 2020-0117-2197Details
install 9 new sprinklers on 4th fl only per nfpa #13. install wet stand pipes per nfpa #14 ref pa 2019-0911-1353 & 2020-0117-2197 | $15,000 |
| Sep 27, 2021 | Completed final sign-off Apr 2023 | 485 Tehama St | add 2 new sprinklers and replace 11 existing heads with new residential sprinklers ba 2021092521008Details
add 2 new sprinklers and replace 11 existing heads with new residential sprinklers ba 2021092521008 | $2,000 |
| Dec 10, 2020 | Never finaled issued Mar 2021, no final | 1133 Tennessee St | install (67) new sprinklers throughout per nfpa 13. underground per nfpa 24. building app. # 2015-0918-7456.Details
install (67) new sprinklers throughout per nfpa 13. underground per nfpa 24. building app. # 2015-0918-7456. | $25,000 |
| Dec 10, 2020 | Completed final sign-off Feb 2023 | 14 Isis St | install (3) sprinklers throughout new adu & egress path per nfpa 13. underground per nfpa 24. b.a. #2016-0727-3507.Details
install (3) sprinklers throughout new adu & egress path per nfpa 13. underground per nfpa 24. b.a. #2016-0727-3507. | $6,000 |
| Aug 14, 2020 | Completed final sign-off Nov 2020 | 2121 Newcomb Av | install and add 3 new sprinkler heads. ref app#201909192169Details
install and add 3 new sprinkler heads. ref app#201909192169 | $500 |
| Jul 2, 2020 | Completed final sign-off Nov 2021 | 909 Page St | installs new sprinkler system: 33 sprinkler heads t the 1st floor and 2" underground fire services.Details
installs new sprinkler system: 33 sprinkler heads t the 1st floor and 2" underground fire services. | $8,000 |
| Mar 13, 2020 | Never finaled issued Mar 2020, no final | 700 Eddy St | to obtain a final inspection for work approved under previous permits pa201803153717 & 201902041953. all work is complete.Details
to obtain a final inspection for work approved under previous permits pa201803153717 & 201902041953. all work is complete. | |
| Jan 17, 2020 | Completed final sign-off May 2023 | 4326 Irving St | fire sprinkler: install 239 sprinklers throughout per nfpa #13. undergorund per nfpa #24. ref pa #201911187535Details
fire sprinkler: install 239 sprinklers throughout per nfpa #13. undergorund per nfpa #24. ref pa #201911187535 | $75,000 |
| Jan 9, 2020 | Completed final sign-off Feb 2020 | 785 Brannan St | install one sprinkler head in the hall of the first floor. ref: 2019-0111-0228Details
install one sprinkler head in the hall of the first floor. ref: 2019-0111-0228 | $500 |
| Jan 9, 2020 | Completed final sign-off Mar 2022 | 859 South Van Ness Av | install 23 new sprinkler head in ground floor. new fire service underground 2" nfpa 13 ref pa 2018-0409-5843 and 2018-0326-4648. sprinkler monitoring fire alarm under sep permit.Details
install 23 new sprinkler head in ground floor. new fire service underground 2" nfpa 13 ref pa 2018-0409-5843 and 2018-0326-4648. sprinkler monitoring fire alarm under sep permit. | $7,000 |
| Sep 25, 2019 | Expired or cancelled expired Oct 2022 | 1460 Waller St | ref pa# 201901251261; install (58) sprinklers throughout per nppa #13-12 underground per nfpa#24. 2" underground fire service.Details
ref pa# 201901251261; install (58) sprinklers throughout per nppa #13-12 underground per nfpa#24. 2" underground fire service. | $15,000 |
| Sep 25, 2019 | Completed final sign-off Jun 2021 | 1274 De Haro St | install new fire sprinkler system per nfpa 13r throughout unit 1274 and garage area connect to existing 2" fire service ref 201612024063Details
install new fire sprinkler system per nfpa 13r throughout unit 1274 and garage area connect to existing 2" fire service ref 201612024063 | $21,996 |
| Mar 25, 2019 | Completed final sign-off Aug 2020 | 446 Vallejo St | this is a revision to app#201902284067 to include new fire sprinkler design based on the new water pressureDetails
this is a revision to app#201902284067 to include new fire sprinkler design based on the new water pressure | |
| Mar 25, 2019 | Completed final sign-off Jun 2019 | 56 Mason St | to obtain a final inspection for work approved under previous permit pa#201710050460 & 201709299912. all work is complete.Details
to obtain a final inspection for work approved under previous permit pa#201710050460 & 201709299912. all work is complete. | |
| Feb 28, 2019 | Never finaled issued Feb 2019, no final | 446 Vallejo St | provide sprinkler at ground floor for new adu per nfpa13 underground per nfpa24 ti 201802080780Details
provide sprinkler at ground floor for new adu per nfpa13 underground per nfpa24 ti 201802080780 | $10,000 |
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 700 Eddy St | lobby: adding 4 sprinkler heads. ref pa201710121139. maher n/a.Details
lobby: adding 4 sprinkler heads. ref pa201710121139. maher n/a. | $500 |
| Jan 24, 2019 | Completed final sign-off Sep 2022 | 1633 Noriega St | revision to pa# 201709087350. change address to 1633a noriega st.Details
revision to pa# 201709087350. change address to 1633a noriega st. | |
| Nov 14, 2018 | Completed final sign-off Jul 2019 | 420 14th St | install new fire sprinkler system at new unit on ground floor and egress area per nfpa 13r including dedicated 2" fire service (total sprinklers 27) ref pa 2016-0420-5279Details
install new fire sprinkler system at new unit on ground floor and egress area per nfpa 13r including dedicated 2" fire service (total sprinklers 27) ref pa 2016-0420-5279 | $13,650 |
| Oct 12, 2018 | Completed final sign-off Aug 2019 | 275 Burnett Av | change out 34 existing residential fire sprinklers.Details
change out 34 existing residential fire sprinklers. | $3,000 |
| Aug 13, 2018 | Completed final sign-off Jan 2021 | 376 Ellis St | install (275) sprinklers throughout per nfpa #13. underground per nfpa #24. ti #201807023516.Details
install (275) sprinklers throughout per nfpa #13. underground per nfpa #24. ti #201807023516. | $75,000 |
| Aug 13, 2018 | Completed final sign-off Sep 2024 | 44 05th St | install (236) new sprinklers per nfpa #13. ti #201805017905.Details
install (236) new sprinklers per nfpa #13. ti #201805017905. | $75,000 |
| Aug 10, 2018 | Completed final sign-off Apr 2019 | 775 Corbett Av | renovations to (e) fire sprinkler system. adding 21 sprinklers. apn # 201605268499Details
renovations to (e) fire sprinkler system. adding 21 sprinklers. apn # 201605268499 | $10,000 |
| Aug 2, 2018 | Completed final sign-off Jun 2020 | 235 Eddy St | installing 2 sprinkler heads at laundry rooms, 1 at 2nd flr, 1 at 3rd flr.Details
installing 2 sprinkler heads at laundry rooms, 1 at 2nd flr, 1 at 3rd flr. | $500 |
| Jul 19, 2018 | Completed final sign-off Jun 2025 | 1011 Howard St | adding a new sprinkler head to the closet of the top of the roof by the end of 4th floor stairway shaft.Details
adding a new sprinkler head to the closet of the top of the roof by the end of 4th floor stairway shaft. | $200 |
| Jul 5, 2018 | Completed final sign-off Jul 2018 | 64 Turk St | adding one sprinkler head to the stairway on the 6th fl.Details
adding one sprinkler head to the stairway on the 6th fl. | |
| Jun 26, 2018 | Completed final sign-off Jul 2018 | 1018 Mission St | install 1 sprinkler head in 2nd flr. adding a sprinkler head from plan 200305094211 to the bathroom on the west side of second fl.Details
install 1 sprinkler head in 2nd flr. adding a sprinkler head from plan 200305094211 to the bathroom on the west side of second fl. | $500 |
| Jun 26, 2018 | Completed final sign-off Jul 2018 | 64 Turk St | renew for final 200310319091, 200502236028. all work is completeDetails
renew for final 200310319091, 200502236028. all work is complete | |
| Jun 22, 2018 | Completed final sign-off Jul 2018 | 10 06th St | add 3 new sprinkler relocate 1 sprinklr new bath area per nfpa 13 ti 201709158751Details
add 3 new sprinkler relocate 1 sprinklr new bath area per nfpa 13 ti 201709158751 | $1,000 |
| Jun 20, 2018 | Completed final sign-off Mar 2022 | 64 Turk St | to obtain a final inspection for work approved under pa#200407078202. all work is complete.Details
to obtain a final inspection for work approved under pa#200407078202. all work is complete. | |
| Jun 20, 2018 | Completed final sign-off Jul 2018 | 270 Mcallister St | to obtain a final inspection for work approved under pa#200304182621. all work is complete.Details
to obtain a final inspection for work approved under pa#200304182621. all work is complete. | |
| Jun 20, 2018 | Completed final sign-off Jun 2018 | 1018 Mission St | to obtain a final inspection for work approved under pa#200512019256 & pa200305094211. all work is complete.Details
to obtain a final inspection for work approved under pa#200512019256 & pa200305094211. all work is complete. | |
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 700 Eddy St | install new fire sprinkler system to all 45 guest units. connect to (e) fire sprinkler systemDetails
install new fire sprinkler system to all 45 guest units. connect to (e) fire sprinkler system | $92,925 |
| Mar 14, 2018 | Completed final sign-off Dec 2018 | 274 Diamond St | install 19 new sprinklers on first floor partial system with 2" underground dedicated fire service, copper k. nfpa 13, includes garage. ref app#201607011383 demand 75 gpm @ 55 psi. 15 psi safety.Details
install 19 new sprinklers on first floor partial system with 2" underground dedicated fire service, copper k. nfpa 13, includes garage. ref app#201607011383 demand 75 gpm @ 55 psi. 15 psi safety. | $7,000 |
| Mar 9, 2018 | Never finaled issued Mar 2018, no final | 1531 Hyde St | add 7 new sprinkler at 2nd flr corridor fpr egress protection ref nov 201611292Details
add 7 new sprinkler at 2nd flr corridor fpr egress protection ref nov 201611292 | $1,477 |
| Dec 19, 2017 | Completed final sign-off Mar 2018 | 2121 Newcomb Av | f/s: (add 1 & relocate 12)13 sprinkler heads pendent to existing 4" main. ref ti #201606109708. maher naDetails
f/s: (add 1 & relocate 12)13 sprinkler heads pendent to existing 4" main. ref ti #201606109708. maher na | $6,500 |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 51 Cervantes Bl | install 54 sprinklers throughout per nfpa 13r underground (garage per nfpa 13) with combo meter per nfpa 24. ref ti 2017-0928-9890. maher n/aDetails
install 54 sprinklers throughout per nfpa 13r underground (garage per nfpa 13) with combo meter per nfpa 24. ref ti 2017-0928-9890. maher n/a | $15,000 |
| Oct 5, 2017 | Completed final sign-off Jun 2019 | 56 Mason St | p group: as-builts. install 90 new sprinkler heads in basement & 94 new heads in 1st fl. no change to residential room count. ref #201510159731. maher naDetails
p group: as-builts. install 90 new sprinkler heads in basement & 94 new heads in 1st fl. no change to residential room count. ref #201510159731. maher na | |
| Sep 29, 2017 | Completed final sign-off Jun 2019 | 56 Mason St | pt group made as built to pa#201510159731-r1, intaller 49 new sprinkler head in attic. 87 upright heads for 2, 3, 4 floors. n/a ordinance #155-13Details
pt group made as built to pa#201510159731-r1, intaller 49 new sprinkler head in attic. 87 upright heads for 2, 3, 4 floors. n/a ordinance #155-13 | |
| Sep 28, 2017 | Completed final sign-off Dec 2017 | 424 Townsend St | add 13 sprinklers in new offices per nfpa 13Details
add 13 sprinklers in new offices per nfpa 13 | $4,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2018 | 161 Hamerton Av | install 50 new sprinkler heads and 2" underground service.Details
install 50 new sprinkler heads and 2" underground service. | $15,000 |
| Sep 8, 2017 | Completed final sign-off Feb 2019 | 1633 Noriega St | install 15 new sprinklers per nfpa 13 r underground per nfpa 24Details
install 15 new sprinklers per nfpa 13 r underground per nfpa 24 | $5,000 |
| Aug 25, 2017 | Completed final sign-off Jun 2018 | 1730 Jones St | new 2" fire service & rise assembly for existing fire sprinkler systemDetails
new 2" fire service & rise assembly for existing fire sprinkler system | $5,000 |
| Aug 1, 2017 | Completed final sign-off Jun 2019 | 1730 Jones St | modify extg sprinkler layout in 2nd floor unit # 1730d and adjacent laundry/utility room. n/a for maherDetails
modify extg sprinkler layout in 2nd floor unit # 1730d and adjacent laundry/utility room. n/a for maher | $3,500 |
| Jul 19, 2017 | Completed final sign-off Jan 2019 | 3161 16th St | provide as built sprinkler plans to close out various expired permits and obtain final on completion of work, ref pa#200310177792, 200404201743, 201703292638 & 201705055820Details
provide as built sprinkler plans to close out various expired permits and obtain final on completion of work, ref pa#200310177792, 200404201743, 201703292638 & 201705055820 | |
| May 26, 2017 | Completed final sign-off Dec 2018 | 2501 Jones St | 1,2,3rd flr: pt-group will install 9 sprinkler heads and underground 2" service fire maher naDetails
1,2,3rd flr: pt-group will install 9 sprinkler heads and underground 2" service fire maher na | $7,000 |
| May 5, 2017 | Never finaled issued May 2017, no final | 3161 16th St | to comply with nov 200341333: reconnect piping in trash room to hallway main on 2nd-5th floors & obtain final inspection. ti 201703292638Details
to comply with nov 200341333: reconnect piping in trash room to hallway main on 2nd-5th floors & obtain final inspection. ti 201703292638 | |
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 830 Sutter St | install underground piping nfpa #24Details
install underground piping nfpa #24 | $3,000 |
| Mar 29, 2017 | Never finaled issued Mar 2017, no final | 3161 16th St | renewal of bpa#200404201743 for final inspection. all work is complete.Details
renewal of bpa#200404201743 for final inspection. all work is complete. | |
| Mar 29, 2017 | Completed final sign-off Mar 2019 | 950 Harrison St | install 2 new sidewall head under e catwalk per nfpa 13Details
install 2 new sidewall head under e catwalk per nfpa 13 | $800 |
| Mar 15, 2017 | Completed final sign-off Dec 2017 | 424 Townsend St | new f/s system: install 141 heads throughtout per nfpa13, u/g per nfpa24. t.i. 201612013868. n/a maherDetails
new f/s system: install 141 heads throughtout per nfpa13, u/g per nfpa24. t.i. 201612013868. n/a maher | $40,000 |
| Mar 1, 2017 | Completed final sign-off Jun 2018 | 744 Oak St | fire sprinkler install 19 new sprinkler heads in under ground 2" fire service in 1 floor ref 201512044024Details
fire sprinkler install 19 new sprinkler heads in under ground 2" fire service in 1 floor ref 201512044024 | $8,000 |
| Mar 1, 2017 | Completed final sign-off Jan 2018 | 3250 Laguna St | install new fire sprinkler system to cover the penthouse unit on 3rd and 4th floors and cover existing path per nfpa 13. also, install new 2-inch fire service off of 8-inch main on laguna st. - 55 heads. ref pa 2015-1106-1992Details
install new fire sprinkler system to cover the penthouse unit on 3rd and 4th floors and cover existing path per nfpa 13. also, install new 2-inch fire service off of 8-inch main on laguna st. - 55 heads. ref pa 2015-1106-1992 | $50,000 |
| Feb 17, 2017 | Completed final sign-off Nov 2017 | 118 Taylor St | install 6 sprinklers in bathroom of rooms 203/*303/403/204/304/404 due to (n) drop ceiling per nfpa13. ref t. pa#201506058221. 16 pendants.Details
install 6 sprinklers in bathroom of rooms 203/*303/403/204/304/404 due to (n) drop ceiling per nfpa13. ref t. pa#201506058221. 16 pendants. | $2,000 |
| Jan 13, 2017 | Completed final sign-off Dec 2017 | 2941 Gough St | sprinklers per nfpa 13 at new unit and exit passageway on ground floor. reference ti 2015.09.23.7776Details
sprinklers per nfpa 13 at new unit and exit passageway on ground floor. reference ti 2015.09.23.7776 | $8,000 |
| Dec 30, 2016 | Never finaled issued Dec 2016, no final | 840 Fell St | install 26 sprinklers on partial 2nd fl and entire 3rd fl per nfpa 13r. underground per nfpa 24. ti 201508315738Details
install 26 sprinklers on partial 2nd fl and entire 3rd fl per nfpa 13r. underground per nfpa 24. ti 201508315738 | $8,000 |
| Oct 28, 2016 | Expired or cancelled withdrawn Aug 2017 | 2121 Newcomb Av | install 49 sprinker heads 45 pendent and 4 upright to existing pipe 4" main tiDetails
install 49 sprinker heads 45 pendent and 4 upright to existing pipe 4" main ti | $12,000 |
| Oct 28, 2016 | Completed final sign-off Aug 2017 | 428 Collingwood St | install 44 new sprinkler heads per nepa 13 and underground. reference ti 2015.03.27.2078.Details
install 44 new sprinkler heads per nepa 13 and underground. reference ti 2015.03.27.2078. | $10,000 |
| Aug 19, 2016 | Never finaled issued Aug 2016, no final | 628 Ivy St | revise sprinkler permit 201607122129; to change fire meter to combo-meter.Details
revise sprinkler permit 201607122129; to change fire meter to combo-meter. | |
| Jul 12, 2016 | Never finaled issued Jul 2016, no final | 3061 16th St | add 31 heads new pends 8, new upright, replace 51 extg heads. t.i. ref #201509116796Details
add 31 heads new pends 8, new upright, replace 51 extg heads. t.i. ref #201509116796 | $10,000 |
| Jul 12, 2016 | Never finaled issued Jul 2016, no final | 628 Ivy St | p t group: installer #12 new sprinkler heads per nfpa #13-r. t.i. #201504022691Details
p t group: installer #12 new sprinkler heads per nfpa #13-r. t.i. #201504022691 | $6,000 |
| Jul 8, 2016 | Completed final sign-off Jun 2017 | 2850 Divisadero St | fire sprinkler: 97 new sprinkler heads, 2 undergroundDetails
fire sprinkler: 97 new sprinkler heads, 2 underground | $15,000 |
| May 27, 2016 | Completed final sign-off Oct 2016 | 940 Sutter St | 4th fl: as-builts for 2016-0523-8124 reflecting the addition of 40 upright heads in concealed space.Details
4th fl: as-builts for 2016-0523-8124 reflecting the addition of 40 upright heads in concealed space. | |
| May 23, 2016 | Completed final sign-off Oct 2016 | 940 Sutter St | install 64 sprinkler heads (14 new, replace 50 (e)) in remodeled 1st fl area. ref t.i. pa#201604144836.Details
install 64 sprinkler heads (14 new, replace 50 (e)) in remodeled 1st fl area. ref t.i. pa#201604144836. | $10,000 |
| May 13, 2016 | Expired or cancelled withdrawn May 2016 | 2850 Divisadero St | install 97 sprinkler headsDetails
install 97 sprinkler heads | $15,000 |
| Mar 21, 2016 | Completed final sign-off Apr 2016 | 445 Francisco St | add (1) sprinkler head in new hallway on 2/f only. t.i. pa# 201603091598. n/a ordinance #155-13Details
add (1) sprinkler head in new hallway on 2/f only. t.i. pa# 201603091598. n/a ordinance #155-13 | $500 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 3350 24th St | install 13-d underground piping for pa#201305167102. n/a ordinance #155-13Details
install 13-d underground piping for pa#201305167102. n/a ordinance #155-13 | $1,000 |
| Oct 30, 2015 | Completed final sign-off Nov 2015 | 215 Fremont St | suite 2b - install & relocate 5 sprinkler heads per nfpa #13. t.i. #201508073731. n/a maher ordinanceDetails
suite 2b - install & relocate 5 sprinkler heads per nfpa #13. t.i. #201508073731. n/a maher ordinance | $1,750 |
| Oct 15, 2015 | Completed final sign-off Jun 2019 | 56 Mason St | install 402 new sprinkler heads on basement, 1st, 2nd, 3rd, 4th floor in penthouse roof; also, install standpipe through all floors for sprinkler system. maher na. ref ti 2013-0130-9114. revision 2014-04-22-3867.Details
install 402 new sprinkler heads on basement, 1st, 2nd, 3rd, 4th floor in penthouse roof; also, install standpipe through all floors for sprinkler system. maher na. ref ti 2013-0130-9114. revision 2014-04-22-3867. | $100,000 |
| Sep 22, 2015 | Completed final sign-off May 2016 | 112 07th St | ground fl: install 66 sprinkler heads in new restaurant. t.i. pa# 2015-0624-9778 n/a ordinance #155-13. ansul system deferred submittal. n/a for maher.Details
ground fl: install 66 sprinkler heads in new restaurant. t.i. pa# 2015-0624-9778 n/a ordinance #155-13. ansul system deferred submittal. n/a for maher. | $33,000 |
| Jul 17, 2015 | Never finaled issued Jul 2015, no final | 39 Ramona Av | 39a ramona ave: new partial fire sprinkler system lower apartment and egress path only. per nfpa-13. total of 12 fire sprinkler heads. project includes 2-inch copper 'k' underground with a 1-1/2 inch combination meter, with a 2-inch back flow preventer. ref. arch. app # 2015-0203-7301Details
39a ramona ave: new partial fire sprinkler system lower apartment and egress path only. per nfpa-13. total of 12 fire sprinkler heads. project includes 2-inch copper 'k' underground with a 1-1/2 inch combination meter, with a 2-inch back flow preventer. ref. arch. app # 2015-0203-7301 | $3,000 |
| Oct 17, 2014 | Completed final sign-off Jan 2015 | 1040 Folsom St | install 28 new sprinklers to existing sprinkler system on ground floor only. (t.i. 201201172389); maher n/aDetails
install 28 new sprinklers to existing sprinkler system on ground floor only. (t.i. 201201172389); maher n/a | $6,000 |