Block 3522, lot 004
14 Isis St
- City’s use
- Multi-Family Residential
- Built
- 1914
- Stories
- 3
- Units
- 9
- Rooms
- 9 bathrooms
- Building
- 5,526 sq ft
- Lot
- 2,016 sq ft
- Zoning
- SLR
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2025 | Completed final sign-off Oct 2025 | 14 Isis St | to address and satify complaint 2024-31100, remove existing wood deck on roof, (e) roofing to remain, no work to existing gooseneck ladder.Details
to address and satify complaint 2024-31100, remove existing wood deck on roof, (e) roofing to remain, no work to existing gooseneck ladder. | $1,500 | |
| Mar 10, 2023 | Completed final sign-off Apr 2023 | 14 Isis St | to obtain final completion for work under pa# 201607273507. all work is complete.Details
to obtain final completion for work under pa# 201607273507. all work is complete. | $35,000 | |
| Feb 6, 2023 | Completed final sign-off Feb 2023 | 14 Isis St | Innovative Technologies | as built drawings for fire alarm upgrade ref 202212148280Details
as built drawings for fire alarm upgrade ref 202212148280 | |
| Dec 14, 2022 | Completed final sign-off Feb 2023 | 14 Isis St | Innovative Technologies | provide sprinkler monitoring. install low frequency sounders to comply with sffd 1103.7.6.1Details
provide sprinkler monitoring. install low frequency sounders to comply with sffd 1103.7.6.1 | $5,000 |
| Jul 29, 2022 | Completed final sign-off Feb 2023 | 14 Isis St | P-T Group Inc | install sprinkler system w/ (e) domestic water meter using double check valve & also lower k factor sprinkler heads.Details
install sprinkler system w/ (e) domestic water meter using double check valve & also lower k factor sprinkler heads. | $16,000 |
| May 10, 2022 | Expired or cancelled cancelled Jan 2026 | 14 Isis St | rev to pa 202012100742 for new adu, scope of work to use provision under stat exemptions. scope is to remove sprinklers since two exits are met at ground floor level ref 201607273507, 201605036394 and 202002144534Details
rev to pa 202012100742 for new adu, scope of work to use provision under stat exemptions. scope is to remove sprinklers since two exits are met at ground floor level ref 201607273507, 201605036394 and 202002144534 | ||
| May 10, 2022 | Never finaled filed May 2022, never issued | 14 Isis St | to comply w/ 202288434 (bid), 202287045 (eid), 202289497 (bid), 202174008 (his) 202174008 (nov his), 202286894 (ces), and 202286894 (nov ces)Details
to comply w/ 202288434 (bid), 202287045 (eid), 202289497 (bid), 202174008 (his) 202174008 (nov his), 202286894 (ces), and 202286894 (nov ces) | ||
| Mar 15, 2022 | Completed final sign-off May 2023 | 14 Isis St | replace cabinets and appliances in kitchen and bathroom, replace fixtures in unit 6.Details
replace cabinets and appliances in kitchen and bathroom, replace fixtures in unit 6. | $6,500 | |
| Mar 1, 2022 | Expired or cancelled cancelled May 2023 | 2 Isis St | to obtain final inspection for work approved under pa# 201605036394. all work is complete.Details
to obtain final inspection for work approved under pa# 201605036394. all work is complete. | ||
| Dec 10, 2020 | Completed final sign-off Feb 2023 | 14 Isis St | P-T Group Inc | install (3) sprinklers throughout new adu & egress path per nfpa 13. underground per nfpa 24. b.a. #2016-0727-3507.Details
install (3) sprinklers throughout new adu & egress path per nfpa 13. underground per nfpa 24. b.a. #2016-0727-3507. | $6,000 |
| Feb 14, 2020 | Completed final sign-off Feb 2020 | 14 Isis St | M J Construction | to obtain final inspection for work approved under pa#2016-05-03-6394. all work is completeDetails
to obtain final inspection for work approved under pa#2016-05-03-6394. all work is complete | |
| Jul 27, 2016 | Expired or cancelled expired Apr 2023 | 14 Isis St | M J Construction | add unit per ordinance# 30-15. studio with 1 bathroom. soft story retrofit pa# 2016/05/03/6394. new sprinklers under separate permit. ** maher: n/a **Details
add unit per ordinance# 30-15. studio with 1 bathroom. soft story retrofit pa# 2016/05/03/6394. new sprinklers under separate permit. ** maher: n/a ** | $35,000 |
| May 3, 2016 | Expired or cancelled expired Sep 2020 | 14 Isis St | M J Construction | soft story retropfit per sfbc chpater 34b engineering criteria 2012 iebc appendix a-4. maher naDetails
soft story retropfit per sfbc chpater 34b engineering criteria 2012 iebc appendix a-4. maher na | $30,000 |
| Aug 7, 2003 | Completed final sign-off Jan 2004 | 2 Isis St | remove & repair (e) 3 stories deck and stair in kind and in sizeDetails
remove & repair (e) 3 stories deck and stair in kind and in size | $4,000 | |
| Jun 1, 2000 | Completed final sign-off Sep 2000 | 14 Isis St | replace kitchen cabinets,water heater, carpet,add new elec outlets in apt #5Details
replace kitchen cabinets,water heater, carpet,add new elec outlets in apt #5 | $4,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.