Seri Ngernwattana
- Listed as
- architect, engineer
- Firm
- Seri Ngerwattana, Pe
- Based in
- Hayward
- On San Francisco permits
- Jul 2007 to Aug 2026
64 permits since 2000 (engineer on 63 permits, architect on 1 permit): 42 completed, 7 in progress, 4 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Aug 2026 | 3809 Cesar Chavez St | Construction Systems Bld & Design | replace foundation footings, stem walls, concrete slab. replace laundry room roof, 2 entry doors, wooden fence.Details
replace foundation footings, stem walls, concrete slab. replace laundry room roof, 2 entry doors, wooden fence. | $150,000 |
| Mar 31, 2025 | In progress issued Dec 2025 | 1140 Ingerson Av | revision to ref 202212309561 & 9562. occup reversal to maintain as r3. wall btwn garage and corr. w/o fdn. detail 3/s1 not apply. shear wall on grid d and 6'-2" and d+3 is 4' tall use hdu4 instead of hud8. new deck is 10" higher than 1st flr elevation. no fire sprinklers.Details
revision to ref 202212309561 & 9562. occup reversal to maintain as r3. wall btwn garage and corr. w/o fdn. detail 3/s1 not apply. shear wall on grid d and 6'-2" and d+3 is 4' tall use hdu4 instead of hud8. new deck is 10" higher than 1st flr elevation. no fire sprinklers. | ||
| Nov 21, 2024 | Completed final sign-off Jul 2025 | 331 Gates St | relocate/reconfigure (e) kitchen and bathroon at 2/f. replace/reconfigure rear shed roof to create conforming door height condition.Details
relocate/reconfigure (e) kitchen and bathroon at 2/f. replace/reconfigure rear shed roof to create conforming door height condition. | $90,000 | |
| Sep 20, 2024 | Completed final sign-off Jan 2026 | 2120 Jefferson St | Nancy Built Llc | enclose (e) covered porch at rear yard.provide (n) laundry/mud room.relocate (e) g/f bathroom w/ shower.add kitchen counter/cabinets & bar sink.new hvac & w/h.relocate (e) elec pnl.relocate (e) r-yard gate.reconfigure (e) 2 car garage.replace (e) garage doors & windows.Details
enclose (e) covered porch at rear yard.provide (n) laundry/mud room.relocate (e) g/f bathroom w/ shower.add kitchen counter/cabinets & bar sink.new hvac & w/h.relocate (e) elec pnl.relocate (e) r-yard gate.reconfigure (e) 2 car garage.replace (e) garage doors & windows. | $40,000 |
| Jun 24, 2024 | In progress filed Jun 2024, not yet issued | 146 Hermann St | replace approx. 50' (e) brick retaining wall with new reinforced concrete retaining wall - retaining wall is on 152 hermann st. ref permit 202405245078.Details
replace approx. 50' (e) brick retaining wall with new reinforced concrete retaining wall - retaining wall is on 152 hermann st. ref permit 202405245078. | $35,000 | |
| Jun 24, 2024 | In progress filed Jun 2024, not yet issued | 152 Hermann St | replace approx. 50' (e) brick retaining wall with new reinforced concrete retaining wall - retaining wall is on 152 hermann st. ref permit 202406245077.Details
replace approx. 50' (e) brick retaining wall with new reinforced concrete retaining wall - retaining wall is on 152 hermann st. ref permit 202406245077. | $35,000 | |
| Mar 28, 2024 | Completed final sign-off Jun 2024 | 1 Buena Vista Ave East Av | Guardian Project Management Services Cor | repair in kind to the left side stair curb and restore handrail at buena vista east entryDetails
repair in kind to the left side stair curb and restore handrail at buena vista east entry | $8,000 |
| Mar 15, 2024 | In progress filed Mar 2024, not yet issued | 259 Clara St | replace (e) three entry door with three new security entry door.Details
replace (e) three entry door with three new security entry door. | $12,500 | |
| Mar 8, 2023 | Completed final sign-off Apr 2023 | 1069 Dolores St | to comply w/nov# 202303248, replace damaged 6x6 post (hit by car) over the existing concrete foundation.Details
to comply w/nov# 202303248, replace damaged 6x6 post (hit by car) over the existing concrete foundation. | $8,000 | |
| Dec 30, 2022 | In progress issued Dec 2024 | 1140 Ingerson Av | convert (e) g/f into one adu (unit b 696sf) per govt code 65852.2(e). other improvements include fire rating existing corridor & stairs on g/f and providing seismic retrofit justifications from structural engineer.new (152sf) elevated deck to provide additional common area for all units.Details
convert (e) g/f into one adu (unit b 696sf) per govt code 65852.2(e). other improvements include fire rating existing corridor & stairs on g/f and providing seismic retrofit justifications from structural engineer.new (152sf) elevated deck to provide additional common area for all units. | $10,000 | |
| Jun 16, 2022 | Completed final sign-off Apr 2023 | 1481 38th Av | Footfour Builders | provide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler.Details
provide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler. | $289,000 |
| Apr 22, 2022 | Completed final sign-off Feb 2023 | 85 Restani Wy | M J Construction | revision to pa 202102255325. revise pier depth on site condition and approval of project engineer.Details
revision to pa 202102255325. revise pier depth on site condition and approval of project engineer. | |
| Dec 2, 2021 | Never finaled issued Jun 2022, no final | 2709 Baker St | San Francisco Investment Development | demolish (e) secondary staircase from 2nd fl to 3rd fl as indicated on plans. extend floor. demolish staircase (18 sqft) + enclose open deck area to create a (n) 90 sqft laundry. demo (e) interior walls around kitchen on 3rd fl to create an open kitchen. extend indicated on plans.Details
demolish (e) secondary staircase from 2nd fl to 3rd fl as indicated on plans. extend floor. demolish staircase (18 sqft) + enclose open deck area to create a (n) 90 sqft laundry. demo (e) interior walls around kitchen on 3rd fl to create an open kitchen. extend indicated on plans. | $50,000 |
| Aug 24, 2021 | Completed final sign-off Feb 2023 | 533 Steiner St | Builders Unlimited Inc | voluntary structure strengthening: 18 feet foundation wall underpinning. replce 6 post and post footing. install 2 simpson strong shear wall over n concrete foundation.Details
voluntary structure strengthening: 18 feet foundation wall underpinning. replce 6 post and post footing. install 2 simpson strong shear wall over n concrete foundation. | $52,000 |
| Jun 14, 2021 | Expired or cancelled cancelled Nov 2024 | 97 Saturn St | North South Construction Inc | new foundation; create (n) habitable space @ lower level crawl space; new stairs to connect 1st floor with lower level; remodel kitchen, 3 new bedrooms, 2 new bathrooms, 1 laundry roomDetails
new foundation; create (n) habitable space @ lower level crawl space; new stairs to connect 1st floor with lower level; remodel kitchen, 3 new bedrooms, 2 new bathrooms, 1 laundry room | $175,000 |
| May 5, 2021 | Completed final sign-off Sep 2022 | 898 Carolina St | White Construction Builders Inc | build rear stairs per approved variance ref: 2020-003848varDetails
build rear stairs per approved variance ref: 2020-003848var | $12,000 |
| Mar 24, 2021 | Expired or cancelled withdrawn Feb 2022 | 4732 17th St | renovate (e) unit w/ 2 bedrooms, 1 bath and kitchen. renovate egress hall for (e) unit. renovate (e) primary unit w/ new stairs to garage level, new laundry, new closet, water heater and trash area. 2nd fl remodel kitchen, bathrooms, fireplace and master bed and bath.Details
renovate (e) unit w/ 2 bedrooms, 1 bath and kitchen. renovate egress hall for (e) unit. renovate (e) primary unit w/ new stairs to garage level, new laundry, new closet, water heater and trash area. 2nd fl remodel kitchen, bathrooms, fireplace and master bed and bath. | $210,000 | |
| Feb 25, 2021 | Completed final sign-off Feb 2023 | 85 Restani Wy | M J Construction | to comply with nov # 202038871. partial stabilized leaned site & building retaining wall. restore building out of plumb wood frame. to comply with nov 20203871Details
to comply with nov # 202038871. partial stabilized leaned site & building retaining wall. restore building out of plumb wood frame. to comply with nov 20203871 | $98,500 |
| Jan 13, 2021 | Completed final sign-off Mar 2021 | 1705 Hyde St | M J Construction | revision to pa 201709148309. wood framed seismic soft story retrofit.Details
revision to pa 201709148309. wood framed seismic soft story retrofit. | |
| Oct 7, 2020 | Completed final sign-off Aug 2021 | 30 Junior Tr | Golden Star Construction | adding existing patio (surrounded with exterior walls) to the kitchen area (48 sf). kitchen remodel, (e) bathroom remodel at 2nd fl. add 3 new skylights.Details
adding existing patio (surrounded with exterior walls) to the kitchen area (48 sf). kitchen remodel, (e) bathroom remodel at 2nd fl. add 3 new skylights. | $30,000 |
| Aug 6, 2020 | Completed final sign-off Mar 2022 | 2425 Francisco St | structural revisions to grade beam, coundation work & structural work. architectural interior walls shifted & toilet room location change on 3rd fl; add laundry closet to 3rd floor. revision to pa 2019-0729-7219 & 2016-1201-3903Details
structural revisions to grade beam, coundation work & structural work. architectural interior walls shifted & toilet room location change on 3rd fl; add laundry closet to 3rd floor. revision to pa 2019-0729-7219 & 2016-1201-3903 | ||
| Dec 9, 2019 | Completed final sign-off Oct 2022 | 898 Carolina St | White Construction Builders Inc | revision to 201711073393, legalize (e) basement to include family room, 1/2 bath, new interior stair, revise req parapet, minor revision at frontDetails
revision to 201711073393, legalize (e) basement to include family room, 1/2 bath, new interior stair, revise req parapet, minor revision at front | $25,000 |
| Sep 24, 2019 | Completed final sign-off Feb 2021 | 221 Surrey St | kitchen remodel: replace cabinets, countrop snd appliances in-kind. replace (e) skylight in (e) opening. remove fireplace and non-structural wall between living and dining rooms. rebuilding (e) interiors stairs and add rear facing window.Details
kitchen remodel: replace cabinets, countrop snd appliances in-kind. replace (e) skylight in (e) opening. remove fireplace and non-structural wall between living and dining rooms. rebuilding (e) interiors stairs and add rear facing window. | $10,000 | |
| Sep 19, 2019 | Completed final sign-off Nov 2020 | 143 Flood Av | Guzman Building & Construction Inc | revision to 201903064550. revise layout of 1st fl and add powder room. relocate full bath #3. bedroom #4 covnerted to family room. relocate gas fire place.Details
revision to 201903064550. revise layout of 1st fl and add powder room. relocate full bath #3. bedroom #4 covnerted to family room. relocate gas fire place. | $5,000 |
| Aug 6, 2019 | Completed final sign-off Aug 2019 | 1041 25th St | Bay Area Builders | revision to pa 201904238727. move bathroom wall. new sink, faucet, bathroom floor. delete front parking space.Details
revision to pa 201904238727. move bathroom wall. new sink, faucet, bathroom floor. delete front parking space. | $31,000 |
| Apr 23, 2019 | Completed final sign-off Aug 2019 | 1041 25th St | Bay Area Builders | reconfigure warehous space- form photo studio into a art frame workshop. remove existing office space 2 new walls, outlets.Details
reconfigure warehous space- form photo studio into a art frame workshop. remove existing office space 2 new walls, outlets. | $55,000 |
| Apr 10, 2019 | Never finaled issued May 2019, no final | 388 Beale St | North-West Pacific Builders Inc | 5/f: currently office areas will become "we work office area"/ combining 3 offices spaces to become lounge residential spaces. maher n/a.Details
5/f: currently office areas will become "we work office area"/ combining 3 offices spaces to become lounge residential spaces. maher n/a. | $249,000 |
| Feb 15, 2019 | In progress issued Sep 2024 | 519 Clipper St | to legalize rear detached, 1-story,type-vb structure w/ 1 dwelling unit per ord# 43-14. to comply w/ nov# 201728515 and 201868411.Details
to legalize rear detached, 1-story,type-vb structure w/ 1 dwelling unit per ord# 43-14. to comply w/ nov# 201728515 and 201868411. | $54,650 | |
| Feb 20, 2018 | Completed final sign-off Apr 2018 | 461 Chestnut St | M J Construction | soft story retrofit revision to pa #20171262372. strong wall locations & back wall detail change shearwall locations.Details
soft story retrofit revision to pa #20171262372. strong wall locations & back wall detail change shearwall locations. | |
| Oct 26, 2017 | Completed final sign-off Apr 2018 | 461 Chestnut St | soft story retrofit base on 2016 iebc appendex a-4 by installing (n) shear walls, plate a.b. & holddowns. maher n/a.Details
soft story retrofit base on 2016 iebc appendex a-4 by installing (n) shear walls, plate a.b. & holddowns. maher n/a. | $35,000 | |
| Sep 14, 2017 | Completed final sign-off Mar 2021 | 1705 Hyde St | M J Construction | soft story retrofit for cripple wall as target storm per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit for cripple wall as target storm per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $35,000 |
| Sep 14, 2017 | Completed final sign-off Nov 2020 | 74 Page St | M J Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. ** maher: n/a **Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. ** maher: n/a ** | $35,000 |
| Sep 8, 2017 | Expired or cancelled withdrawn Aug 2019 | 727 Waller St | seismic retrofit per soft story retrofit per sfebc ch 4dDetails
seismic retrofit per soft story retrofit per sfebc ch 4d | $35,000 | |
| Aug 22, 2017 | Expired or cancelled cancelled Dec 2025 | 265 Faxon Av | new horizontal addition, deck and stairway at rear. interior remodeling. basement excavation (partial to full basement). replacement in-kind of front stairs, porch and retaining wall.Details
new horizontal addition, deck and stairway at rear. interior remodeling. basement excavation (partial to full basement). replacement in-kind of front stairs, porch and retaining wall. | $100,000 | |
| Sep 6, 2016 | Completed final sign-off Oct 2016 | 1065 Dolores St | M J Construction | revision to 201601076589, soft story seismic strengthening - detail changes.Details
revision to 201601076589, soft story seismic strengthening - detail changes. | |
| Jul 8, 2016 | Expired or cancelled expired Mar 2022 | 1367 Natoma St | comply with nov 201576841. legalize basement unit.Details
comply with nov 201576841. legalize basement unit. | ||
| May 3, 2016 | Expired or cancelled expired Sep 2020 | 14 Isis St | M J Construction | soft story retropfit per sfbc chpater 34b engineering criteria 2012 iebc appendix a-4. maher naDetails
soft story retropfit per sfbc chpater 34b engineering criteria 2012 iebc appendix a-4. maher na | $30,000 |
| Jan 7, 2016 | Completed final sign-off Oct 2016 | 1065 Dolores St | soft story seismic strengthening per sfbc chapter 34b : 2012 iebc a-4.Details
soft story seismic strengthening per sfbc chapter 34b : 2012 iebc a-4. | $35,000 | |
| Nov 5, 2015 | Completed final sign-off Dec 2016 | 3987 24th St | Adobe Soil & Structures | repair & construct rear deck.Details
repair & construct rear deck. | $40,000 |
| Apr 20, 2015 | Completed final sign-off Dec 2015 | 124 Page St | mandatory seismic soft story retrofit--strengthening only - install new shear walls and concrete foundation. all interior work. per iebc 2012 appendix a-4.Details
mandatory seismic soft story retrofit--strengthening only - install new shear walls and concrete foundation. all interior work. per iebc 2012 appendix a-4. | $35,000 | |
| Mar 2, 2015 | Never finaled issued Mar 2015, no final | 9 Princeton St | O'brien - Cheney Inc | partial foundation replacement. new slab, minor interior wall modification at stairwayDetails
partial foundation replacement. new slab, minor interior wall modification at stairway | $10,000 |
| Nov 19, 2014 | Completed final sign-off Sep 2015 | 3068 22nd St | soft story seismic retrofit per 2012 iebc appendix 4aDetails
soft story seismic retrofit per 2012 iebc appendix 4a | $40,000 | |
| May 5, 2014 | Completed final sign-off Jun 2014 | 29 Guy Pl | soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. | $10,000 | |
| Mar 14, 2014 | Expired or cancelled expired Aug 2018 | 466 Head St | Stella General Contracting Services | replace masonry foundation. remodel (e) kitchen, expand dining room. add new bathroom in basement & rebuild deck.Details
replace masonry foundation. remodel (e) kitchen, expand dining room. add new bathroom in basement & rebuild deck. | $165,000 |
| Mar 12, 2014 | Completed final sign-off Apr 2015 | 469 Valley St | Leonid Melnychuk Inc Olenka Builders | revision to appl #2013.0604.8618: omitting fire sprinkler requirement based on story calculation & sbc 903.2.8.2(exception), (previously story quantity miscalculated).Details
revision to appl #2013.0604.8618: omitting fire sprinkler requirement based on story calculation & sbc 903.2.8.2(exception), (previously story quantity miscalculated). | |
| Feb 27, 2014 | Completed final sign-off Apr 2015 | 469 Valley St | Leonid Melnychuk Inc Olenka Builders | revision to 201306048618. delete rear room, change to new deck. layout changes. upper level to deck.Details
revision to 201306048618. delete rear room, change to new deck. layout changes. upper level to deck. | |
| Oct 29, 2013 | Completed final sign-off Apr 2015 | 35 Milton St | rebuild (e) rear deck & stairs & enlarge @ rear yard.Details
rebuild (e) rear deck & stairs & enlarge @ rear yard. | $16,000 | |
| Oct 23, 2013 | Expired or cancelled expired Sep 2019 | 483 14th Av | Daniel Gallagher Construction | remove 2 cross braces of rear pop out. excavate patio. pour concrete footing and install 2 hardi frames. install 11ft shear wallDetails
remove 2 cross braces of rear pop out. excavate patio. pour concrete footing and install 2 hardi frames. install 11ft shear wall | $10,000 |
| Jun 7, 2013 | Completed final sign-off Apr 2014 | 519 Dolores St | Horst Gruner Contruction Inc | revision to pa# 201304184858. new posts in basement in different location than originally planned - add posts and footings.Details
revision to pa# 201304184858. new posts in basement in different location than originally planned - add posts and footings. | $3,000 |
| Jun 4, 2013 | Completed final sign-off May 2015 | 469 Valley St | Leonid Melnychuk Inc Olenka Builders | new floor layout inside existing shell, two story basement addition (livable), relocate kitchen, new patio deck on back (18") above ground, new material on front facade. sprinkler under separate permit.Details
new floor layout inside existing shell, two story basement addition (livable), relocate kitchen, new patio deck on back (18") above ground, new material on front facade. sprinkler under separate permit. | $285,000 |
| Apr 30, 2013 | Expired or cancelled expired Oct 2016 | 115 14th Av | new master suite & bath on 3rd floor, remove & replace rear roof, install new spiral staircase from 1st to 2nd floor, remodel bath @ 1st & 2nd floor, rise first floor ceiling height to 7'-6" & new wet bar, bonus room & mechanical room. adding & additional sq ft.Details
new master suite & bath on 3rd floor, remove & replace rear roof, install new spiral staircase from 1st to 2nd floor, remodel bath @ 1st & 2nd floor, rise first floor ceiling height to 7'-6" & new wet bar, bonus room & mechanical room. adding & additional sq ft. | $30,000 | |
| Apr 18, 2013 | Completed final sign-off Mar 2014 | 519 Dolores St | Horst Gruner Contruction Inc | replace kitchens in unit 521 & 523 with all new, add washer & dryer, move water heaters to basement, add forced air heat to unit 521 & 523, update electrical, new electrical service, refinish floors, update bathrooms / plumbing, enlarged wall openings in kitchen & living room.Details
replace kitchens in unit 521 & 523 with all new, add washer & dryer, move water heaters to basement, add forced air heat to unit 521 & 523, update electrical, new electrical service, refinish floors, update bathrooms / plumbing, enlarged wall openings in kitchen & living room. | $120,000 |
| Apr 10, 2013 | Completed final sign-off Apr 2016 | 88 King St | Mahogany Defined Gen Contractors Inc | 6th floor-unit #625-reframe master closet & relocate vanity. master bedroom bathroom-demo bathroom & install shower. frame new wall to include doorwy & install new door. frame new wall to include doorwy & install new door. re-route electrical switches & outlets. drywall repairsDetails
6th floor-unit #625-reframe master closet & relocate vanity. master bedroom bathroom-demo bathroom & install shower. frame new wall to include doorwy & install new door. frame new wall to include doorwy & install new door. re-route electrical switches & outlets. drywall repairs | $8,500 |
| Oct 15, 2012 | Expired or cancelled expired Dec 2014 | 425 01st St | Mahogany Defined Gen Contractors Inc | unit #5304 -revision to appl #2012.09.19.0136: re-route 4" drain/vent pipe to adjacent chase wall, cap off (e) washer, vent & hot & cold water lines, isntall built-in hutch/cabinetry (entry way/foyer area), provide power/outlet (refrigerator & 2 countertop outlets), drywall repair & paint.Details
unit #5304 -revision to appl #2012.09.19.0136: re-route 4" drain/vent pipe to adjacent chase wall, cap off (e) washer, vent & hot & cold water lines, isntall built-in hutch/cabinetry (entry way/foyer area), provide power/outlet (refrigerator & 2 countertop outlets), drywall repair & paint. | $1,200 |
| Oct 15, 2012 | Expired or cancelled expired Dec 2014 | 425 01st St | Mahogany Defined Gen Contractors Inc | unit #5202 -revision to appl #2012.09.19.0135: relocate washer & dryer, extend hallway hatch & provide dedicated outlet (refrigerator), provide 2 countertop outlets, frame in recessed built-in hutch (hollow wall area), drywall repair & paint.Details
unit #5202 -revision to appl #2012.09.19.0135: relocate washer & dryer, extend hallway hatch & provide dedicated outlet (refrigerator), provide 2 countertop outlets, frame in recessed built-in hutch (hollow wall area), drywall repair & paint. | $2,000 |
| Jul 13, 2012 | Completed final sign-off Feb 2020 | 645 Larkin St | All Applied Construction Inc | change of use. tenant improvement of former tatoo parlor to restaurant on ground floor.Details
change of use. tenant improvement of former tatoo parlor to restaurant on ground floor. | $238,000 |
| Jan 26, 2012 | Completed final sign-off Nov 2012 | 1566 19th St | complete interior remodel. rebuild bay window and new windows. expand existing deckDetails
complete interior remodel. rebuild bay window and new windows. expand existing deck | $60,000 | |
| Oct 3, 2011 | Completed final sign-off Nov 2011 | 445 Hayes St | Structura General Contractor Inc. | replace existing wood framed fence/wall with new 10'-0" cmu wall (exterior work only), change of use under pa #201108041771.Details
replace existing wood framed fence/wall with new 10'-0" cmu wall (exterior work only), change of use under pa #201108041771. | $3,600 |
| Aug 4, 2011 | Completed final sign-off Nov 2011 | 445 Hayes St | Structura General Contractor Inc. | change of use from laundry to retail. new duct work, interior walls, cabinets, electricalDetails
change of use from laundry to retail. new duct work, interior walls, cabinets, electrical | $105,200 |
| Jul 22, 2011 | Completed final sign-off Oct 2011 | 1665 Plymouth Av | Halcyon Ventures Dba Synercy Cont | remove existing driveway. replace, remove mudsill and replace, relocate support posts in basement. install trench chain, relocate hot and cold water. move electrical for post relocationDetails
remove existing driveway. replace, remove mudsill and replace, relocate support posts in basement. install trench chain, relocate hot and cold water. move electrical for post relocation | $17,500 |
| Apr 14, 2011 | Never finaled issued Apr 2011, no final | 443 Ellsworth St | remediate undersized central flr beam @ceiling of garage w/new w8x48 beam/hardware, below new beam/posts, remediate (e) undersized 8x8 floating footings w/new re-inforce concrete footings. no (e) hardware @ (e) perimeter walls, add new anchor bolts, hid hurricane ties & 15/32 plywd @interor of garDetails
remediate undersized central flr beam @ceiling of garage w/new w8x48 beam/hardware, below new beam/posts, remediate (e) undersized 8x8 floating footings w/new re-inforce concrete footings. no (e) hardware @ (e) perimeter walls, add new anchor bolts, hid hurricane ties & 15/32 plywd @interor of gar | $12,000 | |
| Apr 16, 2010 | Completed final sign-off Jul 2010 | 2434 California St | Samjin Construction And Arch | remodeling (e) vacant fitness center into a hair salon on the 1st floor to include new partitions, lighting, electrical & plumbingDetails
remodeling (e) vacant fitness center into a hair salon on the 1st floor to include new partitions, lighting, electrical & plumbing | $25,000 |
| Jul 30, 2008 | Completed final sign-off Sep 2008 | 58 San Jacinto Wy | Adobe Soil & Structures | replacing existing wood retaining wall 6' - 0" max.(replace in kind same size).Details
replacing existing wood retaining wall 6' - 0" max.(replace in kind same size). | $30,000 |
| Jul 10, 2007 | Completed final sign-off Sep 2008 | 2183 Mission St | revision to appl#200502185786: revise unisex toilet (ada) & mezzanine (e) to be used for dry storage (light) for restaurant. new framing for existing mezzanine. kitchen hood & lighting under seperate permit.Details
revision to appl#200502185786: revise unisex toilet (ada) & mezzanine (e) to be used for dry storage (light) for restaurant. new framing for existing mezzanine. kitchen hood & lighting under seperate permit. | $15,000 |