Horst Gruner Contruction Inc
- Based in
- Daly City
- On San Francisco permits
- Jan 2000 to Jun 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 43 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2021 | Never finaled issued Jul 2021, no final | 2889 Pacific Av | interior remodel. revision to no-plan permit 202104027810Details
interior remodel. revision to no-plan permit 202104027810 | $145,000 |
| Apr 2, 2021 | Never finaled issued Apr 2021, no final | 2889 Pacific Av | remodel kitcen and 3 bathrooms in kind ,comply w/cec 150.0 (k)5. replace drywall in kind w/min edge nailing (no stud replacement) maitain firerated wall less thatn 5' no wall layout change drywall replacement approx 4000 sfDetails
remodel kitcen and 3 bathrooms in kind ,comply w/cec 150.0 (k)5. replace drywall in kind w/min edge nailing (no stud replacement) maitain firerated wall less thatn 5' no wall layout change drywall replacement approx 4000 sf | $3,000 |
| Mar 9, 2021 | Completed final sign-off Sep 2021 | 2730 Pierce St | remodel kitchen - replace in kind : cabinets , counters, appliances. no change to the layout of walls & opening.Details
remodel kitchen - replace in kind : cabinets , counters, appliances. no change to the layout of walls & opening. | $62,000 |
| May 8, 2019 | Completed final sign-off Sep 2019 | 880 33rd Av | kitchen remodel. replace in-kind 10'x16'. no structural changes. all work on top floor.Details
kitchen remodel. replace in-kind 10'x16'. no structural changes. all work on top floor. | $31,000 |
| Feb 5, 2019 | Completed final sign-off Jun 2019 | 52 Turquoise Wy | complete bath remodel at 2nd flr. replace tub w/ shower, replace vanity w/ double vanity, new tile, move walls and openings as per plan. no change to square footage. all work only at 2nd story master suiteDetails
complete bath remodel at 2nd flr. replace tub w/ shower, replace vanity w/ double vanity, new tile, move walls and openings as per plan. no change to square footage. all work only at 2nd story master suite | $25,000 |
| Oct 3, 2018 | Never finaled issued Oct 2018, no final | 357 26th Av | amendment to permit application # 2018-0801-6118. in units #1 and #2, replace kitchen cabinets and counters in-kind.Details
amendment to permit application # 2018-0801-6118. in units #1 and #2, replace kitchen cabinets and counters in-kind. | $9,000 |
| Aug 1, 2018 | Completed final sign-off Jan 2019 | 357 26th Av | unit 1 & 2: replace in-kind sink, toilet, shower, tile, hardwood floorsDetails
unit 1 & 2: replace in-kind sink, toilet, shower, tile, hardwood floors | $63,000 |
| Dec 11, 2017 | Never finaled issued Dec 2017, no final | 447 Hayes St | revision to pa 2017-0615-9479 - add closet in hallway, 2/fDetails
revision to pa 2017-0615-9479 - add closet in hallway, 2/f | $400 |
| Nov 16, 2017 | Expired or cancelled cancelled Jan 2019 | 447 Hayes St | construct the proposed 461 sf roof deck, interior spiral stair & stair penhouse addition, no bathroom, to an existing two story building.Details
construct the proposed 461 sf roof deck, interior spiral stair & stair penhouse addition, no bathroom, to an existing two story building. | $45,000 |
| Oct 3, 2017 | Never finaled issued Oct 2017, no final | 447 Hayes St | replace existing aluminum windows on 2nd floor with new wood double hung windows within same openings. max u factor 0.32Details
replace existing aluminum windows on 2nd floor with new wood double hung windows within same openings. max u factor 0.32 | $14,000 |
| Jun 15, 2017 | Completed final sign-off Aug 2018 | 447 Hayes St | 2/f: remove, open and fill in walls per plan. raise ceiling in kitchen and lr. complete remodel of kitchen and bathrooms. refinish all floors, new paint. all works are on second floor residential unit only.Details
2/f: remove, open and fill in walls per plan. raise ceiling in kitchen and lr. complete remodel of kitchen and bathrooms. refinish all floors, new paint. all works are on second floor residential unit only. | $79,200 |
| Feb 16, 2017 | Completed final sign-off Jan 2018 | 1370 06th Av | revision to 201604043883: reduce scope, no framining changes, no tub, remodel bathroom on 3rd flr - replace tub with shower, replace sink in kind, add toilet. replace all tile, trim, paint. no walls or other structure to be movedDetails
revision to 201604043883: reduce scope, no framining changes, no tub, remodel bathroom on 3rd flr - replace tub with shower, replace sink in kind, add toilet. replace all tile, trim, paint. no walls or other structure to be moved | $23,600 |
| Jan 18, 2017 | Completed final sign-off Apr 2017 | 2008 Wawona St | bathroom remodel: replace in-kind shower, vanity, toilet, tile, shower, vanity & toilet in same location.Details
bathroom remodel: replace in-kind shower, vanity, toilet, tile, shower, vanity & toilet in same location. | $28,350 |
| May 9, 2016 | Completed final sign-off Nov 2016 | 851 Ashbury St | kitchen remodel; repair leak @ front porch. no exterior work. no structural work.Details
kitchen remodel; repair leak @ front porch. no exterior work. no structural work. | $48,000 |
| Jun 1, 2015 | Expired or cancelled cancelled Jan 2026 | 218 Roanoke St | extend (e0 deck: (e) deck 15'-8" x 5'-7", new deck 15'-8" x12'-8" plus covered walkway sectionDetails
extend (e0 deck: (e) deck 15'-8" x 5'-7", new deck 15'-8" x12'-8" plus covered walkway section | $9,000 |
| Feb 11, 2015 | Completed final sign-off Jun 2015 | 1467 Dolores St | bathroom remodel to include replacment of bath tub, sink & tile floor;no new wall and no (e)wall relocation. window replacement in-kind in bathroom,not visible from street,no rough opening changes. u-factor for window shall not exceed 0.32. lighting in bathroom remodel shall comply with cec 150(k)5.Details
bathroom remodel to include replacment of bath tub, sink & tile floor;no new wall and no (e)wall relocation. window replacement in-kind in bathroom,not visible from street,no rough opening changes. u-factor for window shall not exceed 0.32. lighting in bathroom remodel shall comply with cec 150(k)5. | $20,000 |
| Sep 24, 2014 | Completed final sign-off Dec 2014 | 138 Carl St | replace deck at back, same location in kind replacement. height and depth of deck will not change.Details
replace deck at back, same location in kind replacement. height and depth of deck will not change. | $12,000 |
| Mar 21, 2014 | Completed final sign-off Dec 2014 | 52 Turquoise Wy | remodel 2 bathrooms:location of one toilet each and one sink each stay the same. showers to be removed, bathtubs with shower head to be installed. all new tile, doors(size to stay the same)will move about 3 feet.Details
remodel 2 bathrooms:location of one toilet each and one sink each stay the same. showers to be removed, bathtubs with shower head to be installed. all new tile, doors(size to stay the same)will move about 3 feet. | $45,000 |
| Aug 28, 2013 | Completed final sign-off Nov 2013 | 2104 23rd St | remove bathroom, upgrade electrical & new flooring. remove non load bearing wall.Details
remove bathroom, upgrade electrical & new flooring. remove non load bearing wall. | $9,000 |
| Jun 7, 2013 | Completed final sign-off Apr 2014 | 519 Dolores St | revision to pa# 201304184858. new posts in basement in different location than originally planned - add posts and footings.Details
revision to pa# 201304184858. new posts in basement in different location than originally planned - add posts and footings. | $3,000 |
| Apr 18, 2013 | Completed final sign-off Mar 2014 | 519 Dolores St | replace kitchens in unit 521 & 523 with all new, add washer & dryer, move water heaters to basement, add forced air heat to unit 521 & 523, update electrical, new electrical service, refinish floors, update bathrooms / plumbing, enlarged wall openings in kitchen & living room.Details
replace kitchens in unit 521 & 523 with all new, add washer & dryer, move water heaters to basement, add forced air heat to unit 521 & 523, update electrical, new electrical service, refinish floors, update bathrooms / plumbing, enlarged wall openings in kitchen & living room. | $120,000 |
| Apr 11, 2013 | Completed final sign-off Aug 2013 | 851 Ashbury St | remove interior walls between kitchen & dining area & install new structural beams & posts. relocate switches, no exterior work.Details
remove interior walls between kitchen & dining area & install new structural beams & posts. relocate switches, no exterior work. | $16,200 |
| Oct 18, 2012 | Completed final sign-off Nov 2012 | 631 Lyon St | back stairs: replace parts in kind; 2 posts, 6 joists at landing, decking, stair treads, diagonal braces, or as needed replace damaged wood. replace with pressure treated lumber, less than 50%.Details
back stairs: replace parts in kind; 2 posts, 6 joists at landing, decking, stair treads, diagonal braces, or as needed replace damaged wood. replace with pressure treated lumber, less than 50%. | $9,630 |
| Jun 7, 2012 | Completed final sign-off Oct 2012 | 443 Capistrano Av | revision to appl #2011.0419.4398 - replace only lower floor office window & playroom window & door, eliminate original french door opening & shear wall/hold down requirements.Details
revision to appl #2011.0419.4398 - replace only lower floor office window & playroom window & door, eliminate original french door opening & shear wall/hold down requirements. | |
| Mar 10, 2011 | Completed final sign-off May 2011 | 851 Ashbury St | remove shower in bath on first floor above garage, and create new closet in location of shower. work is on the first floor above garage.Details
remove shower in bath on first floor above garage, and create new closet in location of shower. work is on the first floor above garage. | $8,000 |
| Feb 23, 2010 | Completed final sign-off Jun 2010 | 525 Lawton St | bathroom remodel, replace in kind and in same location, tub,shower, toilet, vanity, add new exhaust fan, no change to walls, windows or door. high efficacy lighting or occupancy sensor control.Details
bathroom remodel, replace in kind and in same location, tub,shower, toilet, vanity, add new exhaust fan, no change to walls, windows or door. high efficacy lighting or occupancy sensor control. | $37,000 |
| Oct 22, 2009 | Completed final sign-off Feb 2010 | 546 41st Av | remove & replace finishes in kind, new drywall trim, cabinets, flooring & 2 windows in (e) kitchen on 2nd floor. no structural work, windows not visible from street, same size windows, u-factorDetails
remove & replace finishes in kind, new drywall trim, cabinets, flooring & 2 windows in (e) kitchen on 2nd floor. no structural work, windows not visible from street, same size windows, u-factor | $22,000 |
| Jan 14, 2009 | Completed final sign-off Jul 2009 | 1387 22nd Av | revision to appl #200711027213-s1 reduce scope of work: no closet in den on 2nd floor. no wall between laundry & garage and do not remove wall between garage & breezeway/lightwell on 1st floor.Details
revision to appl #200711027213-s1 reduce scope of work: no closet in den on 2nd floor. no wall between laundry & garage and do not remove wall between garage & breezeway/lightwell on 1st floor. | |
| Feb 25, 2008 | Completed final sign-off Mar 2008 | 615 Fillmore St | to comply to complait # 200839555. add handrail to light well stairway from ground level through 3rd floor.Details
to comply to complait # 200839555. add handrail to light well stairway from ground level through 3rd floor. | $500 |
| Nov 2, 2007 | Completed final sign-off Jun 2009 | 1387 22nd Av | 1st floor addition @ the rear part of the property. 1st & 2nd floors interior renovation.Details
1st floor addition @ the rear part of the property. 1st & 2nd floors interior renovation. | $100,000 |
| May 14, 2007 | Completed final sign-off Jun 2007 | 187 Ellsworth St | on top floor shorten closet to form book shelf recess, add new closetDetails
on top floor shorten closet to form book shelf recess, add new closet | $4,000 |
| Sep 19, 2006 | Completed final sign-off Sep 2006 | 3928 17th St | renew 200211131282, 200508110086, 200410086311, 200508190732 for final inspectionDetails
renew 200211131282, 200508110086, 200410086311, 200508190732 for final inspection | |
| Sep 19, 2006 | Completed final sign-off Sep 2006 | 3928 17th St | renew 200604128838, 200310157518, 200402055667Details
renew 200604128838, 200310157518, 200402055667 | |
| Sep 19, 2006 | Completed final sign-off Sep 2006 | 3928 17th St | renew 200503147381, 200505202970, 200505202975 for final inspectionDetails
renew 200503147381, 200505202970, 200505202975 for final inspection | |
| Apr 12, 2006 | Completed final sign-off Sep 2006 | 3928 17th St | amend permit 200509284112, widen existing door opening between entrance hallway and front room to 8ftDetails
amend permit 200509284112, widen existing door opening between entrance hallway and front room to 8ft | $600 |
| Jun 1, 2005 | Completed final sign-off Jul 2005 | 2689 Sacramento St | streetspaceDetails
streetspace | $2,000 |
| Apr 4, 2005 | Completed final sign-off Jun 2005 | 101 Scott St | remodel bathroom, move nonbearing wall, insulatin, drywall, tile, wainscotting, new bath fixturesDetails
remodel bathroom, move nonbearing wall, insulatin, drywall, tile, wainscotting, new bath fixtures | $12,000 |
| Jun 23, 2004 | Completed final sign-off Oct 2004 | 64 Mangels Av | remodel kitchen,change all ceiling joists to 2x8 (2x4 existing)same in adjacent dining area,insulatiDetails
remodel kitchen,change all ceiling joists to 2x8 (2x4 existing)same in adjacent dining area,insulati | $30,000 |
| May 25, 2004 | Completed final sign-off Jul 2004 | 327 Eureka St | horizontal addition- remove & replace deck & replace with modified stairsDetails
horizontal addition- remove & replace deck & replace with modified stairs | $6,000 |
| May 7, 2004 | Completed final sign-off Jul 2004 | 327 Eureka St | remove short sections of wall in bdrm btwn closets to make single closet.non bearing.single headerDetails
remove short sections of wall in bdrm btwn closets to make single closet.non bearing.single header | $8,000 |
| Jun 2, 2003 | Completed final sign-off Aug 2003 | 2496 Filbert St | remove & replace tub,sink,toilet,tile on flr & walls,new ceiling lights,fan,heat lamp.no structuralDetails
remove & replace tub,sink,toilet,tile on flr & walls,new ceiling lights,fan,heat lamp.no structural | $15,000 |
| Feb 14, 2003 | Completed final sign-off Apr 2003 | 2043 30th Av | remodel kitchen: new drywall, cabinets, counters & flooring. remodel bath: move wall to closet raiseDetails
remodel kitchen: new drywall, cabinets, counters & flooring. remodel bath: move wall to closet raise | $40,000 |
| Oct 22, 2002 | Completed final sign-off Dec 2002 | 289 Dellbrook Av | remodel bath:new toilet, tub, cabinet, sink, tile, fan. kitchen: new cabinets + counter, remove rockDetails
remodel bath:new toilet, tub, cabinet, sink, tile, fan. kitchen: new cabinets + counter, remove rock | $22,000 |
| Jun 1, 2001 | Completed final sign-off Aug 2001 | 40 Ventura Av | install new:shower, w/c, electrical/plumbing, fan and paintDetails
install new:shower, w/c, electrical/plumbing, fan and paint | $6,000 |
| Feb 28, 2001 | Completed final sign-off May 2001 | 40 Ventura Av | bathroom remodel, no structural changes, new tub, new tile, new vanity, new paint.Details
bathroom remodel, no structural changes, new tub, new tile, new vanity, new paint. | $6,000 |
| Oct 11, 2000 | Completed final sign-off Mar 2001 | 1191 Noe St | comply with attached report 3r 3160Details
comply with attached report 3r 3160 | $5,000 |
| Oct 11, 2000 | Completed final sign-off Feb 2001 | 4094 25th St | comply with attached report 3r-3159Details
comply with attached report 3r-3159 | $5,000 |
| Aug 23, 2000 | Never finaled issued Aug 2000, no final | 7 Downey St | renewal of application 20000202842Details
renewal of application 20000202842 | |
| Feb 24, 2000 | Completed final sign-off Apr 2000 | 757 Page St | repair work only for cracks in existing plaster in walls & ceiling in bedrooms, dining room, ceilingDetails
repair work only for cracks in existing plaster in walls & ceiling in bedrooms, dining room, ceiling | |
| Feb 4, 2000 | Completed final sign-off May 2000 | 757 Page St | remodel bath, new tile at tub, replace toilet & sinkDetails
remodel bath, new tile at tub, replace toilet & sink | |
| Feb 2, 2000 | Expired or cancelled expired Aug 2000 | 7 Downey St | clarify information on plan under approved appl 9825957Details
clarify information on plan under approved appl 9825957 | |
| Jan 21, 2000 | Completed final sign-off Apr 2000 | 759 Page St | kitchen remodel, plaster drywall, replace cabinetsDetails
kitchen remodel, plaster drywall, replace cabinets | $8,000 |
| Jan 21, 2000 | Expired or cancelled expired Aug 2000 | 7 Downey St | renewal of permit pa 9825957Details
renewal of permit pa 9825957 | $10,000 |