53 permits since 2000: 43 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 15 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2021 | Never finaled issued Apr 2021, no final | 2889 Pacific Av | remodel kitcen and 3 bathrooms in kind ,comply w/cec 150.0 (k)5. replace drywall in kind w/min edge nailing (no stud replacement) maitain firerated wall less thatn 5' no wall layout change drywall replacement approx 4000 sfDetails
remodel kitcen and 3 bathrooms in kind ,comply w/cec 150.0 (k)5. replace drywall in kind w/min edge nailing (no stud replacement) maitain firerated wall less thatn 5' no wall layout change drywall replacement approx 4000 sf | $3,000 |
| Feb 5, 2019 | Completed final sign-off Jun 2019 | 52 Turquoise Wy | complete bath remodel at 2nd flr. replace tub w/ shower, replace vanity w/ double vanity, new tile, move walls and openings as per plan. no change to square footage. all work only at 2nd story master suiteDetails
complete bath remodel at 2nd flr. replace tub w/ shower, replace vanity w/ double vanity, new tile, move walls and openings as per plan. no change to square footage. all work only at 2nd story master suite | $25,000 |
| Nov 16, 2017 | Expired or cancelled cancelled Jan 2019 | 447 Hayes St | construct the proposed 461 sf roof deck, interior spiral stair & stair penhouse addition, no bathroom, to an existing two story building.Details
construct the proposed 461 sf roof deck, interior spiral stair & stair penhouse addition, no bathroom, to an existing two story building. | $45,000 |
| Jun 15, 2017 | Completed final sign-off Aug 2018 | 447 Hayes St | 2/f: remove, open and fill in walls per plan. raise ceiling in kitchen and lr. complete remodel of kitchen and bathrooms. refinish all floors, new paint. all works are on second floor residential unit only.Details
2/f: remove, open and fill in walls per plan. raise ceiling in kitchen and lr. complete remodel of kitchen and bathrooms. refinish all floors, new paint. all works are on second floor residential unit only. | $79,200 |
| Feb 16, 2017 | Completed final sign-off Jan 2018 | 1370 06th Av | revision to 201604043883: reduce scope, no framining changes, no tub, remodel bathroom on 3rd flr - replace tub with shower, replace sink in kind, add toilet. replace all tile, trim, paint. no walls or other structure to be movedDetails
revision to 201604043883: reduce scope, no framining changes, no tub, remodel bathroom on 3rd flr - replace tub with shower, replace sink in kind, add toilet. replace all tile, trim, paint. no walls or other structure to be moved | $23,600 |
| Jan 18, 2017 | Completed final sign-off Apr 2017 | 2008 Wawona St | bathroom remodel: replace in-kind shower, vanity, toilet, tile, shower, vanity & toilet in same location.Details
bathroom remodel: replace in-kind shower, vanity, toilet, tile, shower, vanity & toilet in same location. | $28,350 |
| Feb 11, 2015 | Completed final sign-off Jun 2015 | 1467 Dolores St | bathroom remodel to include replacment of bath tub, sink & tile floor;no new wall and no (e)wall relocation. window replacement in-kind in bathroom,not visible from street,no rough opening changes. u-factor for window shall not exceed 0.32. lighting in bathroom remodel shall comply with cec 150(k)5.Details
bathroom remodel to include replacment of bath tub, sink & tile floor;no new wall and no (e)wall relocation. window replacement in-kind in bathroom,not visible from street,no rough opening changes. u-factor for window shall not exceed 0.32. lighting in bathroom remodel shall comply with cec 150(k)5. | $20,000 |
| Mar 21, 2014 | Completed final sign-off Dec 2014 | 52 Turquoise Wy | remodel 2 bathrooms:location of one toilet each and one sink each stay the same. showers to be removed, bathtubs with shower head to be installed. all new tile, doors(size to stay the same)will move about 3 feet.Details
remodel 2 bathrooms:location of one toilet each and one sink each stay the same. showers to be removed, bathtubs with shower head to be installed. all new tile, doors(size to stay the same)will move about 3 feet. | $45,000 |
| Aug 28, 2013 | Completed final sign-off Nov 2013 | 2104 23rd St | remove bathroom, upgrade electrical & new flooring. remove non load bearing wall.Details
remove bathroom, upgrade electrical & new flooring. remove non load bearing wall. | $9,000 |
| Apr 18, 2013 | Completed final sign-off Mar 2014 | 519 Dolores St | replace kitchens in unit 521 & 523 with all new, add washer & dryer, move water heaters to basement, add forced air heat to unit 521 & 523, update electrical, new electrical service, refinish floors, update bathrooms / plumbing, enlarged wall openings in kitchen & living room.Details
replace kitchens in unit 521 & 523 with all new, add washer & dryer, move water heaters to basement, add forced air heat to unit 521 & 523, update electrical, new electrical service, refinish floors, update bathrooms / plumbing, enlarged wall openings in kitchen & living room. | $120,000 |
| Mar 10, 2011 | Completed final sign-off May 2011 | 851 Ashbury St | remove shower in bath on first floor above garage, and create new closet in location of shower. work is on the first floor above garage.Details
remove shower in bath on first floor above garage, and create new closet in location of shower. work is on the first floor above garage. | $8,000 |
| Feb 23, 2010 | Completed final sign-off Jun 2010 | 525 Lawton St | bathroom remodel, replace in kind and in same location, tub,shower, toilet, vanity, add new exhaust fan, no change to walls, windows or door. high efficacy lighting or occupancy sensor control.Details
bathroom remodel, replace in kind and in same location, tub,shower, toilet, vanity, add new exhaust fan, no change to walls, windows or door. high efficacy lighting or occupancy sensor control. | $37,000 |
| Apr 4, 2005 | Completed final sign-off Jun 2005 | 101 Scott St | remodel bathroom, move nonbearing wall, insulatin, drywall, tile, wainscotting, new bath fixturesDetails
remodel bathroom, move nonbearing wall, insulatin, drywall, tile, wainscotting, new bath fixtures | $12,000 |
| Feb 14, 2003 | Completed final sign-off Apr 2003 | 2043 30th Av | remodel kitchen: new drywall, cabinets, counters & flooring. remodel bath: move wall to closet raiseDetails
remodel kitchen: new drywall, cabinets, counters & flooring. remodel bath: move wall to closet raise | $40,000 |
| Oct 22, 2002 | Completed final sign-off Dec 2002 | 289 Dellbrook Av | remodel bath:new toilet, tub, cabinet, sink, tile, fan. kitchen: new cabinets + counter, remove rockDetails
remodel bath:new toilet, tub, cabinet, sink, tile, fan. kitchen: new cabinets + counter, remove rock | $22,000 |
| Feb 28, 2001 | Completed final sign-off May 2001 | 40 Ventura Av | bathroom remodel, no structural changes, new tub, new tile, new vanity, new paint.Details
bathroom remodel, no structural changes, new tub, new tile, new vanity, new paint. | $6,000 |
| Feb 4, 2000 | Completed final sign-off May 2000 | 757 Page St | remodel bath, new tile at tub, replace toilet & sinkDetails
remodel bath, new tile at tub, replace toilet & sink |