Permit GraphShortlistSan Francisco building permits since 2000

Footfour Builders

Contractor license
972554
State license record
Based in
Homewood
On San Francisco permits
Oct 2014 to Sep 2022
Last 24 months
0 permits filed

10 permits since 2000: 9 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllStairs 2Kitchen remodel 3Bathroom remodel 4
FiledOutcomeAddressWork described on the permitDeclared cost
Sep 30, 2022Completed
final sign-off Apr 2023
1481 38th Avrevision to bpa#202206166525, reduction of scope no new stairs to garage, keep (e) stairs to garage & add fire rated door @ top of stairs to main habitable floor, remove wall @ end of kitchen island, provide new beam above
Details
Permit
202209303542
Permit issued
Oct 3, 2022
Final sign-off
Apr 10, 2023

revision to bpa#202206166525, reduction of scope no new stairs to garage, keep (e) stairs to garage & add fire rated door @ top of stairs to main habitable floor, remove wall @ end of kitchen island, provide new beam above

Open the permit page

Jun 16, 2022Completed
final sign-off Apr 2023
1481 38th Avprovide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler.
Details
Permit
202206166525
Permit issued
Jul 14, 2022
Final sign-off
Apr 10, 2023

provide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler.

Open the permit page

$289,000
Aug 7, 2019Completed
final sign-off Sep 2019
5950 California Stas built revision 2018-1119-6336 and 2018-1119-6337. revise footing, shear wall and moment frame
Details
Permit
201908078204
Permit issued
Aug 22, 2019
Final sign-off
Sep 27, 2019

as built revision 2018-1119-6336 and 2018-1119-6337. revise footing, shear wall and moment frame

Open the permit page

Nov 30, 2018Completed
final sign-off Aug 2019
1225 Waller Stinterior only rmeodel to 2nd fl - converting (e) kitchen to bedroom. reocate (e) kitchen & laundry. (n) master bath. no horizontal/vertical additions. no exterior work visible from st.
Details
Permit
201811307096
Permit issued
Dec 13, 2018
Final sign-off
Aug 6, 2019

interior only rmeodel to 2nd fl - converting (e) kitchen to bedroom. reocate (e) kitchen & laundry. (n) master bath. no horizontal/vertical additions. no exterior work visible from st.

Open the permit page

$95,000
Nov 19, 2018Completed
final sign-off Sep 2019
5950 California Stto comply with nov #201803583. commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201811196336
Details
Permit
201811196337
Permit issued
Feb 21, 2019
Final sign-off
Sep 27, 2019

to comply with nov #201803583. commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201811196336

Open the permit page

$20,000
Nov 19, 2018Completed
final sign-off Sep 2019
5950 California Stto comply with nov #201803583. residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201811196337
Details
Permit
201811196336
Permit issued
Feb 21, 2019
Final sign-off
Sep 27, 2019

to comply with nov #201803583. residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201811196337

Open the permit page

$60,000
Jul 21, 2016Never finaled
issued Oct 2016, no final
601 29th Stfinish (e) attic space for conversion to (n) attic storage, work to include installation of (n) windows and skylights, (n) ceiling light fixtures and (n) electrical outlets.
Details
Permit
201607212961
Permit issued
Oct 20, 2016

finish (e) attic space for conversion to (n) attic storage, work to include installation of (n) windows and skylights, (n) ceiling light fixtures and (n) electrical outlets.

Open the permit page

$10,000
Dec 3, 2015Completed
final sign-off Jul 2016
2771 Lombard Strevision to pa #201311212567 - install new fence enclose for outdoor sitting area; n/a maher ordinance
Details
Permit
201512034059
Permit issued
Jun 9, 2016
Final sign-off
Jul 27, 2016

revision to pa #201311212567 - install new fence enclose for outdoor sitting area; n/a maher ordinance

Open the permit page

$10,000
Sep 21, 2015Completed
final sign-off Dec 2015
601 29th Stfire damage building -replace siding on south elevation wall. replace drywall at lower unit where affected -no structural damage. replace (1) 3"x36" window in kind (replace max u-factor = 0.40 work inside upper bathroom - new tub, new plumbing, new electrical, new tile.
Details
Permit
201509217575
Permit issued
Sep 21, 2015
Final sign-off
Dec 11, 2015

fire damage building -replace siding on south elevation wall. replace drywall at lower unit where affected -no structural damage. replace (1) 3"x36" window in kind (replace max u-factor = 0.40 work inside upper bathroom - new tub, new plumbing, new electrical, new tile.

Open the permit page

$60,000
Oct 6, 2014Completed
final sign-off Aug 2016
601 29th Stunit legalization ordinance# 43-14. legalization of unwarranted unit. 1 studio unit with 1 bathroom.
Details
Permit
201410068159
Permit issued
Feb 25, 2016
Final sign-off
Aug 2, 2016

unit legalization ordinance# 43-14. legalization of unwarranted unit. 1 studio unit with 1 bathroom.

Open the permit page

$10,000