Back to bathroom remodel contractors
Footfour Builders
- Based in
- Homewood
- On San Francisco permits
- Oct 2014 to Sep 2022
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 20 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2022 | Completed final sign-off Apr 2023 | 1481 38th Av | provide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler.Details
provide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler. | $289,000 |
| Nov 30, 2018 | Completed final sign-off Aug 2019 | 1225 Waller St | interior only rmeodel to 2nd fl - converting (e) kitchen to bedroom. reocate (e) kitchen & laundry. (n) master bath. no horizontal/vertical additions. no exterior work visible from st.Details
interior only rmeodel to 2nd fl - converting (e) kitchen to bedroom. reocate (e) kitchen & laundry. (n) master bath. no horizontal/vertical additions. no exterior work visible from st. | $95,000 |
| Sep 21, 2015 | Completed final sign-off Dec 2015 | 601 29th St | fire damage building -replace siding on south elevation wall. replace drywall at lower unit where affected -no structural damage. replace (1) 3"x36" window in kind (replace max u-factor = 0.40 work inside upper bathroom - new tub, new plumbing, new electrical, new tile.Details
fire damage building -replace siding on south elevation wall. replace drywall at lower unit where affected -no structural damage. replace (1) 3"x36" window in kind (replace max u-factor = 0.40 work inside upper bathroom - new tub, new plumbing, new electrical, new tile. | $60,000 |
| Oct 6, 2014 | Completed final sign-off Aug 2016 | 601 29th St | unit legalization ordinance# 43-14. legalization of unwarranted unit. 1 studio unit with 1 bathroom.Details
unit legalization ordinance# 43-14. legalization of unwarranted unit. 1 studio unit with 1 bathroom. | $10,000 |