Block 1155, lot 005
1500 Mcallister St
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 4
- Units
- 9
- Rooms
- 20 bedrooms, 14 bathrooms
- Building
- 11,175 sq ft
- Lot
- 3,280 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2018 | Never finaled issued Jan 2019, no final | 1500 Mcallister St | install new operable gates @ ground floor, 3 windows. no locksDetails
install new operable gates @ ground floor, 3 windows. no locks | $4,000 | |
| Apr 17, 2017 | Never finaled issued Jun 2017, no final | 1500 Mcallister St | street spaceDetails
street space | ||
| Mar 27, 2017 | Never finaled issued Jun 2017, no final | 1504 Mcallister St | street spaceDetails
street space | ||
| Jan 9, 2017 | Never finaled issued Jan 2017, no final | 1500 Mcallister St | street spaceDetails
street space | ||
| Dec 7, 2016 | Completed final sign-off Aug 2017 | 1500 Mcallister St | San Francisco Fire Protection | ti 201603293352 & 201603031046;installation of new fire alarm system,incl fire control panel,sd,above & pull stn near panel,notification appliances install thru out,install monitor modules to tie-in waterflow & tamper switches to new panel.Details
ti 201603293352 & 201603031046;installation of new fire alarm system,incl fire control panel,sd,above & pull stn near panel,notification appliances install thru out,install monitor modules to tie-in waterflow & tamper switches to new panel. | $14,500 |
| Dec 5, 2016 | Never finaled issued Dec 2016, no final | 1500 Mcallister St | street spaceDetails
street space | ||
| Jul 8, 2016 | Never finaled issued Jul 2016, no final | 1500 Mcallister St | street spaceDetails
street space | ||
| Jun 13, 2016 | Never finaled issued Jun 2016, no final | 1500 Mcallister St | street spaceDetails
street space | ||
| Mar 29, 2016 | Completed final sign-off Dec 2017 | 1500 Mcallister St | Lewis M Merlo Inc, Stephenson Construction Co | alter (e) lower passange way to include new gas room, elec/utilities room, trash room. locating sprinkler main & fire dept. hook-ups, new rated walls framing, excave & foundation work provided, exterior work is pg&e and fire dept. requirements. fire sprinklers to be nfpa 13r under seperate.Details
alter (e) lower passange way to include new gas room, elec/utilities room, trash room. locating sprinkler main & fire dept. hook-ups, new rated walls framing, excave & foundation work provided, exterior work is pg&e and fire dept. requirements. fire sprinklers to be nfpa 13r under seperate. | $50,000 |
| Mar 3, 2016 | Completed final sign-off Aug 2017 | 1500 Mcallister St | Todd Morris Fire Protection Inc. | fully sprinkler 4 story building (residential) per nfpa 13 2013 including attic. dedicated underground included per nfpa 24 2013. referenced pa#2015-11-30-3685-addition of 1 unit, pa#2015-07-31-3037-repair fire damage.Details
fully sprinkler 4 story building (residential) per nfpa 13 2013 including attic. dedicated underground included per nfpa 24 2013. referenced pa#2015-11-30-3685-addition of 1 unit, pa#2015-07-31-3037-repair fire damage. | $100,000 |
| Jan 20, 2016 | Never finaled issued Jan 2016, no final | 1500 Mcallister St | street spaceDetails
street space | ||
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 1500 Mcallister St | street space permitDetails
street space permit | ||
| Nov 30, 2015 | Expired or cancelled withdrawn Oct 2017 | 1500 Mcallister St | reference structural under soft story permt#201505216944. work includes adding a dwelling unit @ ground level (per ordiance 30-15)includes slab excavation, lowering exterior entarance door w/level landing, adding 3 new windows in kind @ (e) locations. new egress @ unit, directly to public right awayDetails
reference structural under soft story permt#201505216944. work includes adding a dwelling unit @ ground level (per ordiance 30-15)includes slab excavation, lowering exterior entarance door w/level landing, adding 3 new windows in kind @ (e) locations. new egress @ unit, directly to public right away | $100,000 | |
| Jul 31, 2015 | Completed final sign-off Dec 2017 | 1500 Mcallister St | Stephenson Construction Co | interior remodel at extg residential bldg, including moving interior walls. adding bathrooms in units 901, 1502b, 1504a and 1504b. moving kitchen in 901. all other bathrooms and kitchens are replacing fixtures and finishes. no changes to egress or unit footprints. all exterior work previously approvDetails
interior remodel at extg residential bldg, including moving interior walls. adding bathrooms in units 901, 1502b, 1504a and 1504b. moving kitchen in 901. all other bathrooms and kitchens are replacing fixtures and finishes. no changes to egress or unit footprints. all exterior work previously approv | $175,000 |
| Jun 17, 2015 | Never finaled issued Jun 2015, no final | 1500 Mcallister St | street space permitDetails
street space permit | ||
| May 21, 2015 | Completed final sign-off Dec 2017 | 1500 Mcallister St | Stephenson Construction Co | soft story retrofit to comply with sfbc ch 34 b based on 2012 iebc appendix ch a4 structural calculationsDetails
soft story retrofit to comply with sfbc ch 34 b based on 2012 iebc appendix ch a4 structural calculations | $60,000 |
| Apr 28, 2015 | Completed final sign-off Dec 2017 | 1500 Mcallister St | Stephenson Construction Co | comply w/nov 201523772 & 201543421" fire damage - scope to perform non-structural demo work to remove burned& water damaged construction, finishes, appliances,etc. rebuild burmed areas in kind req'd per sec 3405cbc. exterior walls, ceilings, floors & roof in area of work to be 1hr rated mep defferedDetails
comply w/nov 201523772 & 201543421" fire damage - scope to perform non-structural demo work to remove burned& water damaged construction, finishes, appliances,etc. rebuild burmed areas in kind req'd per sec 3405cbc. exterior walls, ceilings, floors & roof in area of work to be 1hr rated mep deffered | $500,000 |
| Feb 10, 2015 | Completed final sign-off Apr 2016 | 1500 Mcallister St | Stephenson Construction Co | provide emergency shoring under direction of (pat buscovich) s.e. engineer of record at northwest corner brick chimneyDetails
provide emergency shoring under direction of (pat buscovich) s.e. engineer of record at northwest corner brick chimney | $5,000 |
| Jul 14, 2014 | Completed final sign-off Sep 2014 | 1504 Mcallister St | Flying Colors | replace kitchen cabinets and countertop. add dishwasher. add additional receptacles to 3 rooms.Details
replace kitchen cabinets and countertop. add dishwasher. add additional receptacles to 3 rooms. | $15,000 |
| Apr 17, 2014 | Completed final sign-off May 2014 | 1500 Mcallister St | Flying Colors | repairs to rear stairs - in kind - less than 50% to comply with nov #201463271.Details
repairs to rear stairs - in kind - less than 50% to comply with nov #201463271. | $10,000 |
| Jul 9, 2007 | Never finaled issued Jul 2007, no final | 1500 Mcallister St | street space permitDetails
street space permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Stephenson Construction Co (5), Flying Colors (2), Lewis M Merlo Inc, San Francisco Fire Protection, Todd Morris Fire Protection Inc.
- Architects
- Michael Harris (3), Michael Harris
- Engineers
- Rodrigo Santos (2), Patrick Buscovich
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.