- Aug 2014 to Sep 2026
25 permits since 2000 (engineer on 24 permits, architect on 1 permit): 14 completed, 5 in progress, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 660 03rd St | Bayside Mechanical Inc | remove 8 (e) rooftop package units. replace with 8 new units. reconnect existing duct, electrical, gas pipe, drain line and thermostat wire.Details
remove 8 (e) rooftop package units. replace with 8 new units. reconnect existing duct, electrical, gas pipe, drain line and thermostat wire. | $80,000 |
| May 27, 2026 | In progress issued Aug 2026 | 345 California St | Skyline Construction | 6/f & 7/f: installation office phone booth anchorage & structural details included.Details
6/f & 7/f: installation office phone booth anchorage & structural details included. | $66,000 |
| May 23, 2026 | In progress filed May 2026, not yet issued | 3958 Cesar Chavez St | vert & addition: 1/f: int renov/addition of bth,bed,laundry & sitting rm).2/f: bath,bed,kitchen, liv rm & din rm, rear deck. new 3/f: penthouse & powder rm, deck. skylight at roof. new int stairs connect 1/2/3 flrs & ext stairs connect patio to 2nd deck.Details
vert & addition: 1/f: int renov/addition of bth,bed,laundry & sitting rm).2/f: bath,bed,kitchen, liv rm & din rm, rear deck. new 3/f: penthouse & powder rm, deck. skylight at roof. new int stairs connect 1/2/3 flrs & ext stairs connect patio to 2nd deck. | $370,000 | |
| Jan 27, 2026 | In progress filed Jan 2026, not yet issued | 664 44th Av | horizontal additional and remodel. extension under overhead structure. new kitchen and bathrooms.Details
horizontal additional and remodel. extension under overhead structure. new kitchen and bathrooms. | $573,000 | |
| Feb 20, 2025 | In progress issued Apr 2026 | 65 Oak Grove St | Bradshaw Group Inc | new exterior facade main entry and paint around. maintain andupdate the (e) g/f interior parking and including a new 2-story entry lobby including (n) elevator and grand stair to 2/f. ti on 2/f:reception,offices, conference room areas,meeting room,restrooms and office support areas. skylight and pv.Details
new exterior facade main entry and paint around. maintain andupdate the (e) g/f interior parking and including a new 2-story entry lobby including (n) elevator and grand stair to 2/f. ti on 2/f:reception,offices, conference room areas,meeting room,restrooms and office support areas. skylight and pv. | $2,000,000 |
| Aug 22, 2024 | Completed final sign-off Apr 2025 | 101 California St | Source Planning And Construction Inc | ramp, stair, upper floor railing. ramp interior work in parking lot. reference: 202303103491Details
ramp, stair, upper floor railing. ramp interior work in parking lot. reference: 202303103491 | $30,000 |
| Oct 28, 2022 | Completed final sign-off Feb 2023 | 419 Peru Av | revision to pa# 202011038039 to change expansion anchors to j-bolts cast in place concrete. remove expansion achor special inspection.Details
revision to pa# 202011038039 to change expansion anchors to j-bolts cast in place concrete. remove expansion achor special inspection. | ||
| Aug 3, 2022 | Completed final sign-off Jan 2024 | 3982 Cesar Chavez St | Edenavow Construction & Design | interior remodel including kitchen and bathroom on 1/f. new electrical and plumbing at rea of new work. new exterior door & windows at area of new work (not street facing). deck addition to rear yard. replacement of rotten siding at area of new work.Details
interior remodel including kitchen and bathroom on 1/f. new electrical and plumbing at rea of new work. new exterior door & windows at area of new work (not street facing). deck addition to rear yard. replacement of rotten siding at area of new work. | $100,000 |
| Jun 15, 2022 | Completed final sign-off Jun 2023 | 3 Embarcadero Center | Peacock Construction | 3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.Details
3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep. | $1,025,089 |
| Mar 15, 2022 | Completed final sign-off Dec 2022 | 595 Market St | Source Planning And Construction Inc | rev to pa 202111172568 movable framed glass doors/structural drawingDetails
rev to pa 202111172568 movable framed glass doors/structural drawing | |
| Nov 17, 2021 | Never finaled issued Dec 2021, no final | 595 Market St | Source Planning And Construction Inc | 11/f suite 1100: ti to combine 2 existing suites into a single suite (#1100). demolition of (e) wall, finishes, replacement of ceiling system. lighting, millwork and finishes. new walls, doors. new 1 single use restroom and modify (e) mep system.Details
11/f suite 1100: ti to combine 2 existing suites into a single suite (#1100). demolition of (e) wall, finishes, replacement of ceiling system. lighting, millwork and finishes. new walls, doors. new 1 single use restroom and modify (e) mep system. | $1,800,000 |
| Oct 18, 2021 | Completed final sign-off Oct 2022 | 360 Langton St | Bayside Mechanical Inc | replace 4 existing ac units and 2 split systems with newDetails
replace 4 existing ac units and 2 split systems with new | $45,000 |
| Jun 28, 2021 | Completed final sign-off Feb 2022 | 630 Vermont St | revision to pa# 201808207817/s-1. make few structural changes to the original plans.Details
revision to pa# 201808207817/s-1. make few structural changes to the original plans. | ||
| Feb 8, 2021 | Never finaled issued Apr 2021, no final | 360 03rd St | Bcci Construction Company | 5/f structural revision to approved pa202010206988. strutural calcs and ref drawnings included. maher n/a.Details
5/f structural revision to approved pa202010206988. strutural calcs and ref drawnings included. maher n/a. | $50,000 |
| Jan 27, 2021 | Completed final sign-off Dec 2021 | 385 Castenada Av | change opening from door & 2 picture full size windows to 12' opening for sliding doors.Details
change opening from door & 2 picture full size windows to 12' opening for sliding doors. | $5,000 | |
| Jan 26, 2021 | Completed final sign-off Mar 2023 | 385 Castenada Av | new guardrail and 2 balconies replacement. add spiral staircase to deck level from garden level.Details
new guardrail and 2 balconies replacement. add spiral staircase to deck level from garden level. | $15,000 | |
| Nov 3, 2020 | Completed final sign-off Feb 2023 | 419 Peru Av | Trinity Building Co Llc | voluntary structural upgrade of masonry foundation. addition of bath in basement. all work within (e) footprint. no facade work. no work in public right of way. interior work only.Details
voluntary structural upgrade of masonry foundation. addition of bath in basement. all work within (e) footprint. no facade work. no work in public right of way. interior work only. | $75,000 |
| Oct 20, 2020 | Never finaled issued Dec 2020, no final | 360 03rd St | Bcci Construction Company | 5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations.Details
5th flr. t.i to (e) equipment rooms limited to minor architectural, hvac and t.i alterations. | $1,000,000 |
| Feb 5, 2020 | Expired or cancelled cancelled Jan 2026 | 75 Boardman Pl | Skyline Construction | ref pa# 201910305958; revision to t.i. to add structural for seismic anchoring of lifts and pallet racksDetails
ref pa# 201910305958; revision to t.i. to add structural for seismic anchoring of lifts and pallet racks | $10,000 |
| May 8, 2019 | Completed final sign-off Jul 2019 | 495 Fulton St | Edenavow Construction & Design | remove and replace e staircase inkindDetails
remove and replace e staircase inkind | $10,000 |
| Dec 21, 2018 | Expired or cancelled withdrawn Aug 2019 | 970 Tennessee St | Platinum Builders Inc | revision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes.Details
revision to pa #201807255461. office renovation w/accessory lab, accessible toilet rooms, conference room, lighting & hvac revised, no exterior changes. | |
| Mar 27, 2018 | Completed final sign-off Oct 2018 | 811 Geary St | brick repair as needed.rebar with epoxy in to brick. ref to engineered report and nov 201844395Details
brick repair as needed.rebar with epoxy in to brick. ref to engineered report and nov 201844395 | $5,000 | |
| Aug 30, 2017 | Completed final sign-off Nov 2018 | 246 Missouri St | Custom 6 Builders | raise rear roof 2 feet. relace rear windows, not visible from street.Details
raise rear roof 2 feet. relace rear windows, not visible from street. | $50,000 |
| Sep 22, 2015 | Never finaled issued Sep 2015, no final | 3260 19th St | install auto lifts @ auto shopDetails
install auto lifts @ auto shop | $2,500 | |
| Aug 29, 2014 | Completed final sign-off Dec 2014 | 60 Collingwood St | Rocha & Son Construction | skylight and closet buildout at 3rd floor unit. glass panel walkwayDetails
skylight and closet buildout at 3rd floor unit. glass panel walkway | $10,000 |