Permit 202609148046
660 03rd St
remove 8 (e) rooftop package units. replace with 8 new units. reconnect existing duct, electrical, gas pipe, drain line and thermostat wire.
- Outcome
- In progress (city status: issued, Oct 8, 2026)
- Filed
- Sep 14, 2026
- Permit issued
- Oct 8, 2026
- Declared cost
- $80,000
- Building use
- office
- Neighborhood
- South of Market (how long permits take there)
- Contractor
- Owner-builder: the owner is listed as the builder, so no contractor is ranked for this permit
- Property
- All permits at this address (block 3787, lot 008)
Everyone on the permit
The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.
- Owner-builder
- Owner
- Engineer
- Kevin T. O'keefe, Universal Structural Engineers (license S4192)
- Engineer
- Mazen Tawasha, Bayside Mechanical (license M32507)
- Authorized agent
- Maxmilian Pollack (no license listed), applicant