Sven Eric Lavine
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Sven Lavine Architecture
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to May 2026
105 permits since 2000 (architect on 99 permits, authorized agent-others on 3 permits, engineer on 3 permits, pmt consultant/expediter on 2 permits): 59 completed, 11 in progress, 13 never finaled, 22 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 105.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2026 | In progress filed May 2026, not yet issued | 3958 Cesar Chavez St | vert & addition: 1/f: int renov/addition of bth,bed,laundry & sitting rm).2/f: bath,bed,kitchen, liv rm & din rm, rear deck. new 3/f: penthouse & powder rm, deck. skylight at roof. new int stairs connect 1/2/3 flrs & ext stairs connect patio to 2nd deck.Details
vert & addition: 1/f: int renov/addition of bth,bed,laundry & sitting rm).2/f: bath,bed,kitchen, liv rm & din rm, rear deck. new 3/f: penthouse & powder rm, deck. skylight at roof. new int stairs connect 1/2/3 flrs & ext stairs connect patio to 2nd deck. | $370,000 | |
| Jan 28, 2026 | In progress filed Jan 2026, not yet issued | 450 Prentiss St | vertical addition and 1/f horizontal addition. 1/f interior renovation/ addition 2 bedrooms, laundry & bath. 2/f interior renovation of living, dining, kitchen & powder room. new 3/f addtion of bedroom, office, bath & closet/laundry, front deck. new stairs connecting 1st/2nd/3rd flr. new rear yardDetails
vertical addition and 1/f horizontal addition. 1/f interior renovation/ addition 2 bedrooms, laundry & bath. 2/f interior renovation of living, dining, kitchen & powder room. new 3/f addtion of bedroom, office, bath & closet/laundry, front deck. new stairs connecting 1st/2nd/3rd flr. new rear yard | $350,000 | |
| Jan 5, 2026 | In progress filed Jan 2026, not yet issued | 457 Roosevelt Wy | legalization of changes pa 201708165047: subbasement addition.(p)subbasement:(p)office & gym.basement:(as-built) 1 bed,1 media rm,rear deck,(p)office.1/f:(as-built) gate & fene at front.(p) trash enclosure under (e) front stair.2/f:(as-built) living rm.ext (as-built) site stair connect yard to bsmt.Details
legalization of changes pa 201708165047: subbasement addition.(p)subbasement:(p)office & gym.basement:(as-built) 1 bed,1 media rm,rear deck,(p)office.1/f:(as-built) gate & fene at front.(p) trash enclosure under (e) front stair.2/f:(as-built) living rm.ext (as-built) site stair connect yard to bsmt. | $50,000 | |
| Dec 15, 2025 | Completed final sign-off Dec 2025 | 591 04th Av | L C Builders Inc. | revision to permit #201910174823, revise green landscaping ordiance at front setback.Details
revision to permit #201910174823, revise green landscaping ordiance at front setback. | |
| Nov 5, 2025 | In progress issued Dec 2025 | 573 Diamond St | Doran Construction & Design | revisioin to 202412136844. 1st fl: replace door with new window. lower garage window.Details
revisioin to 202412136844. 1st fl: replace door with new window. lower garage window. | $1,500 |
| Oct 9, 2025 | In progress issued Oct 2025 | 91 Coleridge St | Doran Construction & Design | unit 91 coleridge street unit a: 1st floor replace existing dryrot walls in kind at rear. (e) fixtures to be reused. repairs only.Details
unit 91 coleridge street unit a: 1st floor replace existing dryrot walls in kind at rear. (e) fixtures to be reused. repairs only. | $10,000 |
| Sep 18, 2025 | Completed final sign-off Sep 2026 | 82 Woodward St | Doran Construction & Design, Olive Remodeling | 2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work.Details
2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work. | $150,000 |
| Sep 16, 2025 | Completed final sign-off May 2026 | 4156 Folsom St | Cardenas Custom Builders Inc. | 1st floor: alteration two footing for new posts. 2nd floor: bath, kitchen, dining & living room renovation. roof:new skylight. total of two buildg 9n) 1 hr fire resistance rated parapet.Details
1st floor: alteration two footing for new posts. 2nd floor: bath, kitchen, dining & living room renovation. roof:new skylight. total of two buildg 9n) 1 hr fire resistance rated parapet. | $75,000 |
| Aug 19, 2025 | In progress issued Jun 2026 | 1406 Diamond St | Cardenas Custom Builders Inc. | 3/f vertical addition. 1/f: (n) entry.2/f: interior renovations (dining/living). (n) 3/f: 2 beds, 1 bath, 1 sitting rm. new int stairs connect 1/2/3. rear yd: new site stair connection 1/f to 2/f rear yard.Details
3/f vertical addition. 1/f: (n) entry.2/f: interior renovations (dining/living). (n) 3/f: 2 beds, 1 bath, 1 sitting rm. new int stairs connect 1/2/3. rear yd: new site stair connection 1/f to 2/f rear yard. | $400,000 |
| Jun 9, 2025 | In progress filed Jun 2025, not yet issued | 82 Woodward St | Doran Construction & Design | new gate and new garage entrance. metal gate to match (e) front entryDetails
new gate and new garage entrance. metal gate to match (e) front entry | $800 |
| Jan 23, 2025 | In progress issued Feb 2025 | 321 Clipper St | Cardenas Custom Builders Inc. | front building: 2/f - convert (e)bedroom into family rm, (e)dining and (e) living rms into 2(n)bedrms. new opening between kitchen and family room. 1/f: structural upgrade as needed.Details
front building: 2/f - convert (e)bedroom into family rm, (e)dining and (e) living rms into 2(n)bedrms. new opening between kitchen and family room. 1/f: structural upgrade as needed. | $7,000 |
| Jan 23, 2025 | Expired or cancelled withdrawn Oct 2025 | 82 Woodward St | Doran Construction & Design | 1/f: raised garage entry door. 2/f: remodel powder, bath and kitchen. 3/f: new office, dining, bed and bath. remodel powder, bath and kitchen. replace in kind window at rear 2/f and 3/f. new heat pump system.Details
1/f: raised garage entry door. 2/f: remodel powder, bath and kitchen. 3/f: new office, dining, bed and bath. remodel powder, bath and kitchen. replace in kind window at rear 2/f and 3/f. new heat pump system. | $85,000 |
| Jan 20, 2025 | In progress issued Jun 2025 | 573 Diamond St | Doran Construction & Design | revision to permit#: 201908290257. 1st flr: no addition, remodel laundry and entry. 2nd flr: no addition, remodel entry, bath and music room. 3rd flr: reconfigure layout of master bed and dressing room. 4th flr: (n) bath. (reduce scope)Details
revision to permit#: 201908290257. 1st flr: no addition, remodel laundry and entry. 2nd flr: no addition, remodel entry, bath and music room. 3rd flr: reconfigure layout of master bed and dressing room. 4th flr: (n) bath. (reduce scope) | |
| Oct 25, 2024 | Completed final sign-off Aug 2025 | 321 Clipper St | Cardenas Custom Builders Inc. | interior bathroom renovation & new powder room (front building)Details
interior bathroom renovation & new powder room (front building) | $15,000 |
| Sep 11, 2024 | Expired or cancelled expired Jun 2026 | 1414 06th Av | Mc Gowan Builders | rev 202201065454: new exterior stair connectiong rear yard & 2/f deck.Details
rev 202201065454: new exterior stair connectiong rear yard & 2/f deck. | $2,000 |
| May 17, 2023 | In progress issued Jan 2025 | 91 Coleridge St | Doran Construction & Design | front & rear yard addition. rear yard variance. 1st: (n) porch @ front. 2nd: (n) addition @ m.bath to align w/ floor below. renovation of 2 baths, (n) hallway to rear yard. roof: (n) skylight. (n) ext. stairs @ front of buildingDetails
front & rear yard addition. rear yard variance. 1st: (n) porch @ front. 2nd: (n) addition @ m.bath to align w/ floor below. renovation of 2 baths, (n) hallway to rear yard. roof: (n) skylight. (n) ext. stairs @ front of building | $50,000 |
| Oct 20, 2022 | Expired or cancelled expired Jul 2025 | 144 Bonview St | Cardenas Custom Builders Inc. | revision to bpa#202010227155/r6. changing sprinkler building nfpa 13r to nfpa 13d - under separate permit. bldg to reclassify as 3 stories over basement from previous 4 story approved plans.Details
revision to bpa#202010227155/r6. changing sprinkler building nfpa 13r to nfpa 13d - under separate permit. bldg to reclassify as 3 stories over basement from previous 4 story approved plans. | |
| Sep 2, 2022 | Completed final sign-off May 2023 | 198 Valencia St | Sweitzer Inc. | tenant improvement of (e) warm shell space for a new restaurant. 1st time tenant in new space. adding a sushi counter, prep areas, warewash, storage & trash room. non-load bearing partition walls for a restaurant without a cook line.Details
tenant improvement of (e) warm shell space for a new restaurant. 1st time tenant in new space. adding a sushi counter, prep areas, warewash, storage & trash room. non-load bearing partition walls for a restaurant without a cook line. | $385,000 |
| Apr 28, 2022 | Never finaled filed Apr 2022, never issued | 1284 Dolores St | vertical&horizontal addition. reconfigure dwelling units. sub-floor: new garage 1st & 2nd: new 2 bedrooms, 2 bathrooms, kitchen and living room, 2nd: new dining, infill lightwell, new stairs connecting 2nd/3rd. 3rd: new 3 bedroom, 2 bathrooms, siting, & deck@front.Details
vertical&horizontal addition. reconfigure dwelling units. sub-floor: new garage 1st & 2nd: new 2 bedrooms, 2 bathrooms, kitchen and living room, 2nd: new dining, infill lightwell, new stairs connecting 2nd/3rd. 3rd: new 3 bedroom, 2 bathrooms, siting, & deck@front. | $300,000 | |
| Jan 19, 2022 | Never finaled filed Jan 2022, never issued | 11 Wright St | rear horizintal addition at 1st/3rd. variance: sec.242(e)(3) mass reduction requirements for rh-1. 1st flr: (n) den & office. 2nd: (n) rear deck. 3rd flr: (n) bed, bath, m, suite(bath & bed), & rear deck. rear yard: (m) stair connection rear yard to 2nd deck.Details
rear horizintal addition at 1st/3rd. variance: sec.242(e)(3) mass reduction requirements for rh-1. 1st flr: (n) den & office. 2nd: (n) rear deck. 3rd flr: (n) bed, bath, m, suite(bath & bed), & rear deck. rear yard: (m) stair connection rear yard to 2nd deck. | $150,000 | |
| Jan 6, 2022 | Completed final sign-off Jun 2026 | 1414 06th Av | Mc Gowan Builders | vertical addition. 2nd fl: (n) library, powder rm, kitchen & dining rm, & rear deck. new 3rd fl: (n) 3 bedrooms, bath, master suite & rear deck. roof: (n) skylightsDetails
vertical addition. 2nd fl: (n) library, powder rm, kitchen & dining rm, & rear deck. new 3rd fl: (n) 3 bedrooms, bath, master suite & rear deck. roof: (n) skylights | $275,000 |
| Dec 3, 2021 | Expired or cancelled cancelled Jan 2026 | 1422 06th Av | 1st/fl: enlarge garage door, relocate garage entry door. reuse (e) brick to fill in opening @ front. 2nd/fl: fill in rear wall, remodel kitchen, remove fireplace in living room. (n) stair connect 1st/2nd fl.Details
1st/fl: enlarge garage door, relocate garage entry door. reuse (e) brick to fill in opening @ front. 2nd/fl: fill in rear wall, remodel kitchen, remove fireplace in living room. (n) stair connect 1st/2nd fl. | $40,000 | |
| Jun 15, 2021 | Completed final sign-off Sep 2021 | 311 Baden St | Edenavow Construction & Design | legalize work at ground fl. full bath and bedroomDetails
legalize work at ground fl. full bath and bedroom | |
| Feb 17, 2021 | Completed final sign-off Oct 2021 | 838 Page St | Hive Builds Inc. | revision to app#201711154089. title 24 revision: new combined hydronic heating system to replace extg furnace and water heater.Details
revision to app#201711154089. title 24 revision: new combined hydronic heating system to replace extg furnace and water heater. | $1,000 |
| Dec 29, 2020 | Completed final sign-off Apr 2021 | 1435 05th Av | Hive Builds Inc. | revision to pa# 201810193728 1st floor wet barDetails
revision to pa# 201810193728 1st floor wet bar | $500 |
| Dec 29, 2020 | Expired or cancelled cancelled Jan 2026 | 619 21st Av | 2nd floor:kitchen remodel, powder room and rear deck. rear yard: stair connectiong rear yard to 2nd deck. adu on a seperate permitDetails
2nd floor:kitchen remodel, powder room and rear deck. rear yard: stair connectiong rear yard to 2nd deck. adu on a seperate permit | $30,000 | |
| Nov 13, 2020 | In progress issued May 2026 | 619 21st Av | rear addition @ 1st floor - 1/f: (n) 1 bed, sitting, bath,laundry; 2/f: (n) kitchen, powder rm & rear deck. (n) skylight, (n) int. stair connecting 1/f & 2/f; rear yard: (n) spiral stair connecting rear yard to 2nd deck.Details
rear addition @ 1st floor - 1/f: (n) 1 bed, sitting, bath,laundry; 2/f: (n) kitchen, powder rm & rear deck. (n) skylight, (n) int. stair connecting 1/f & 2/f; rear yard: (n) spiral stair connecting rear yard to 2nd deck. | $280,000 | |
| Oct 22, 2020 | Expired or cancelled expired Jul 2025 | 144 Bonview St | Cardenas Custom Builders Inc. | vertical & rear horizontal addition.ref. variance: 2019-002916env1st: (n) beds, bath, stor.2nd: (n) beds, bath & rear deck3rd: (n) bed, bath, auxiliary, laund, & gara.. rear deck4th: (n) kit, pwdr, living, dining & bay window @ front. rear deckrear yard: (n) terrace & plantersprinkler bldgDetails
vertical & rear horizontal addition.ref. variance: 2019-002916env1st: (n) beds, bath, stor.2nd: (n) beds, bath & rear deck3rd: (n) bed, bath, auxiliary, laund, & gara.. rear deck4th: (n) kit, pwdr, living, dining & bay window @ front. rear deckrear yard: (n) terrace & plantersprinkler bldg | $250,000 |
| Oct 6, 2020 | Completed final sign-off Jul 2021 | 119 Forest Side Av | Mc Gowan Builders | revision to pa 201909272931. extend 2nd flr deck cantilever 3' ft into rear yard. (n) concrete steps at side yard. remove fireplace, firebox, chimney. revise 2nd flr structure at bathroom.Details
revision to pa 201909272931. extend 2nd flr deck cantilever 3' ft into rear yard. (n) concrete steps at side yard. remove fireplace, firebox, chimney. revise 2nd flr structure at bathroom. | $12,000 |
| Jan 21, 2020 | Never finaled issued Feb 2020, no final | 451 Buena Vista East Av | Doran Construction & Design | rev to pa# 201711174287; replace failing retaining walls at rear yardDetails
rev to pa# 201711174287; replace failing retaining walls at rear yard | |
| Oct 17, 2019 | Completed final sign-off Dec 2025 | 589 04th Av | L C Builders Inc. | raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balconyDetails
raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balcony | $400,000 |
| Sep 27, 2019 | Completed final sign-off Jul 2021 | 119 Forest Side Av | Mc Gowan Builders | rear horizontal addition. 1st floor: new bedroom, master suite, dressing area & bath. 2nd floor: new bath, kitchen, sitting area & roofdeck. new interior stair connecting 1st and 2nd floor.Details
rear horizontal addition. 1st floor: new bedroom, master suite, dressing area & bath. 2nd floor: new bath, kitchen, sitting area & roofdeck. new interior stair connecting 1st and 2nd floor. | $175,000 |
| Aug 29, 2019 | Never finaled issued Mar 2023, no final | 573 Diamond St | Doran Construction & Design | rear horizontal & vertical addition. 1st fl:remoddel bed & bath, 2nd floor kitchen, dining, living & bath remodel. 3rd floor: master bed & bath remodel. 4th floor; penthouse addiiton.Details
rear horizontal & vertical addition. 1st fl:remoddel bed & bath, 2nd floor kitchen, dining, living & bath remodel. 3rd floor: master bed & bath remodel. 4th floor; penthouse addiiton. | $500,000 |
| Apr 15, 2019 | Completed final sign-off Sep 2021 | 4725 Irving St | American Builders | add units per ord 162-16. (n) adu @ 1st floor: (n) kitchen, bath, dinning & studio. extend (e) fire sprinkler & alarm throughout 1st floor under separate permit.Details
add units per ord 162-16. (n) adu @ 1st floor: (n) kitchen, bath, dinning & studio. extend (e) fire sprinkler & alarm throughout 1st floor under separate permit. | $50,000 |
| Mar 29, 2019 | Expired or cancelled expired Jul 2026 | 869 Darien Wy | S O D Home Group | 1st story horizontal addition (media room). 2nd story: kitchen remodel. new doors / windows, decks. 3rd story: horizontal addition (master suite & bath).Details
1st story horizontal addition (media room). 2nd story: kitchen remodel. new doors / windows, decks. 3rd story: horizontal addition (master suite & bath). | $190,084 |
| Feb 20, 2019 | Completed final sign-off Apr 2022 | 289 Bradford St | L C Builders Inc. | converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side.Details
converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side. | $90,000 |
| Feb 20, 2019 | Completed final sign-off Sep 2020 | 451 Buena Vista East Av | Doran Construction & Design | revision to pa #201708023666. remove exterior stair connecting 2nd & 3rd fl. fire sprinkler throughout per nfpa 13r under sep permit. (n) siding at rear & side facade.Details
revision to pa #201708023666. remove exterior stair connecting 2nd & 3rd fl. fire sprinkler throughout per nfpa 13r under sep permit. (n) siding at rear & side facade. | $15,000 |
| Oct 24, 2018 | Expired or cancelled cancelled Jan 2024 | 569 Pennsylvania Av | horizontal & vertical addition, adu per ord 162-16. complete interior renovation, create 2nd dwelling & adu, (n) driveway & curb cut. sprinkler building nfpa 13r under separate permit.Details
horizontal & vertical addition, adu per ord 162-16. complete interior renovation, create 2nd dwelling & adu, (n) driveway & curb cut. sprinkler building nfpa 13r under separate permit. | $380,000 | |
| Oct 19, 2018 | Completed final sign-off Apr 2021 | 1435 05th Av | Hive Builds Inc. | horizontal rear addition. 1st floor - (n) family, laundry & mech room , rear balcony. 2nd floor - rear deck. (n) exterior connecting 1st floor to rear yard.Details
horizontal rear addition. 1st floor - (n) family, laundry & mech room , rear balcony. 2nd floor - rear deck. (n) exterior connecting 1st floor to rear yard. | $85,000 |
| Aug 24, 2018 | Expired or cancelled cancelled Nov 2022 | 1256 York St | 1st/2nd flr: enclosed entry. 3rd/4th flr: (n) stairs. (n) 4th flr addition: (n) bedrooms, bath, master suite & roof deck. sprinkler building nfpa 13r under separate permit.Details
1st/2nd flr: enclosed entry. 3rd/4th flr: (n) stairs. (n) 4th flr addition: (n) bedrooms, bath, master suite & roof deck. sprinkler building nfpa 13r under separate permit. | $200,000 | |
| Oct 11, 2017 | Completed final sign-off Sep 2018 | 37 Aztec St | J Reilly Construction | replace (e) front windows with new aluminum windows.Details
replace (e) front windows with new aluminum windows. | $1,500 |
| Aug 2, 2017 | Completed final sign-off Sep 2018 | 251 Foerster St | High Ground Construction | exterior: rear yard (n) balcony & gangway, patio, retaining wall, and exterior stairs. interior: 1stfl: (n) bedrm & bath, m. bedrm, bath & dresing area. mech and storage & laundry. (n) stairs connecting 1st & 2nd fl.Details
exterior: rear yard (n) balcony & gangway, patio, retaining wall, and exterior stairs. interior: 1stfl: (n) bedrm & bath, m. bedrm, bath & dresing area. mech and storage & laundry. (n) stairs connecting 1st & 2nd fl. | $150,000 |
| Aug 2, 2017 | Completed final sign-off Sep 2020 | 451 Buena Vista East Av | Doran Construction & Design | convert to 2 units. int reno: 1st- new kit, partitions @ lobby, refinish (e) stair & bath. 2nd - new kit, fam rm, dining & bath, refinish (e) stair adding new guard/handrail. 3rd flr - new laundry, refinish bath, infill covered deck. new ext wind/doors @rear. remove ext stairs 2nd/3rd. fire sepDetails
convert to 2 units. int reno: 1st- new kit, partitions @ lobby, refinish (e) stair & bath. 2nd - new kit, fam rm, dining & bath, refinish (e) stair adding new guard/handrail. 3rd flr - new laundry, refinish bath, infill covered deck. new ext wind/doors @rear. remove ext stairs 2nd/3rd. fire sep | $230,000 |
| Jun 1, 2017 | Completed final sign-off May 2019 | 309 Holly Park Cr | L C Builders Inc. | rear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths.Details
rear @ vertical addition. fill in (e) open under-deck / house area to create storage. legalize / reduce (e) rear decks. sprinkler building. interior renovation. 2 new bedroom & 2 new baths. | $280,000 |
| May 19, 2017 | Never finaled issued Jun 2017, no final | 1426 06th Av | Amone Corp | new curb cutDetails
new curb cut | $1,000 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 1843 Church St | Mc Gowan Builders | interior renovation @ 3rd floor unit - new powder room, closets, laundry room & kitchen renovation, new lighting in bedrooms.Details
interior renovation @ 3rd floor unit - new powder room, closets, laundry room & kitchen renovation, new lighting in bedrooms. | $12,000 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 945 Woolsey St | Andrew Zhao's Construction Co | revision to pa #201504214188: 2nd floor: new closet, bay winodws & deck (takeout -omit new stair & sunroom). 1st floor: new storage under stair.Details
revision to pa #201504214188: 2nd floor: new closet, bay winodws & deck (takeout -omit new stair & sunroom). 1st floor: new storage under stair. | |
| Dec 5, 2016 | Completed final sign-off Nov 2017 | 1426 06th Av | Amone Corp | revision to pa 2014-1010-8689, (n) stair @ front hall coneecting 2nd & 3rd floor. new hallway @ 1st story front storageDetails
revision to pa 2014-1010-8689, (n) stair @ front hall coneecting 2nd & 3rd floor. new hallway @ 1st story front storage | $1,200 |
| Nov 30, 2016 | Never finaled issued Sep 2022, no final | 309 Rutledge St | L C Builders Inc. | restore (e) front portion of bldg. replace (e) illegal rear addition with a 2-story addition @ the rear portion of the building.Details
restore (e) front portion of bldg. replace (e) illegal rear addition with a 2-story addition @ the rear portion of the building. | $280,000 |
| Aug 24, 2016 | Completed final sign-off Jul 2019 | 91 Canyon Dr | Andrew Zhao's Construction Co | 2 story rear and side addition, interior renovations(n) stair connect 1st & 2nd floors;(n)finishes@exterior facade(stucco & tile);(n) 1st story awning (n)garage door to match (e)in site;replace windows (n)front planters and 6' wood fence/gae 1 new bath on 2nd floorDetails
2 story rear and side addition, interior renovations(n) stair connect 1st & 2nd floors;(n)finishes@exterior facade(stucco & tile);(n) 1st story awning (n)garage door to match (e)in site;replace windows (n)front planters and 6' wood fence/gae 1 new bath on 2nd floor | $90,000 |
| Jan 6, 2016 | Completed final sign-off Nov 2016 | 109 Gates St | Lee & Company Contractors Inc | rev. to pa#201310038400, & new skylight on 3/f, not visable from street -new skylight at roof, new rear window at 2nd. exclude proposed rear deck at 1st flr. new structural angle brace at exisitng rear deck. new master bedroom and bathroom at 3rd floorDetails
rev. to pa#201310038400, & new skylight on 3/f, not visable from street -new skylight at roof, new rear window at 2nd. exclude proposed rear deck at 1st flr. new structural angle brace at exisitng rear deck. new master bedroom and bathroom at 3rd floor | $20,000 |
| Nov 18, 2015 | Never finaled issued Mar 2017, no final | 335 Brentwood Av | (n) vertical addition (addition to 2/f); 1 bedroom, 1 bath. (n) front story facade; (n) front stair and coveredDetails
(n) vertical addition (addition to 2/f); 1 bedroom, 1 bath. (n) front story facade; (n) front stair and covered | $90,000 | |
| Oct 23, 2015 | Completed final sign-off Jul 2021 | 2306 Castro St | Doran Construction & Design | to erect 3 stories, no basement, single family building.Details
to erect 3 stories, no basement, single family building. | $350,000 |
| Sep 25, 2015 | Expired or cancelled cancelled Jul 2022 | 111 Hahn St | horizontal addition. 1st story addition; (n) bedroom, 2nd story addition: (n) sun room & deck. (n) rear stair.Details
horizontal addition. 1st story addition; (n) bedroom, 2nd story addition: (n) sun room & deck. (n) rear stair. | $120,000 | |
| Jul 30, 2015 | Completed final sign-off Jan 2017 | 111 Hahn St | American Construction | revision to pa #2015.0703.0645 - add new bath at 1st floor, new bath, renovatiion of kitchen, family & bedroom #2, new skylight with parapet on roof.Details
revision to pa #2015.0703.0645 - add new bath at 1st floor, new bath, renovatiion of kitchen, family & bedroom #2, new skylight with parapet on roof. | $47,000 |
| Jul 22, 2015 | Completed final sign-off Jan 2019 | 2151 Scott St | T T General Construction | interior renovation: 1st flr: convert unconditioned to fam room & bath. enlcose entry foyer. 2nd flr: remodel entire flr - kitchen, bath & add powder rm/ 3rd flr: convert 2 bedrms to master & new baths, new skylights, windows, reconfigure (e) stair.Details
interior renovation: 1st flr: convert unconditioned to fam room & bath. enlcose entry foyer. 2nd flr: remodel entire flr - kitchen, bath & add powder rm/ 3rd flr: convert 2 bedrms to master & new baths, new skylights, windows, reconfigure (e) stair. | $117,000 |
| Jul 13, 2015 | Completed final sign-off Feb 2019 | 1331 San Bruno Av | Throne Builders Inc | horizontal & vertical addition. replace foundation, bring front & rear facades level, more front steps. change windows & doors. add 3rd story @ back at the house. add decks in back 2nd story & front 3rd story. add bathroom 3rd story.Details
horizontal & vertical addition. replace foundation, bring front & rear facades level, more front steps. change windows & doors. add 3rd story @ back at the house. add decks in back 2nd story & front 3rd story. add bathroom 3rd story. | $600,000 |
| Jul 8, 2015 | Expired or cancelled cancelled Jan 2026 | 331 Collingwood St | add 2nd dwelling, add window at rearDetails
add 2nd dwelling, add window at rear | $2,000 | |
| Jun 15, 2015 | Expired or cancelled expired Jun 2021 | 2306 Castro St | Cornerstone Dba Ag Construction | revision to app#201310189745. new interior stair, coner window at facade, new skylights. 1st floor: excavate to increase ceiling hight. convert extg unconditoin space to habitable. master bed & bath. 2nd fl: structural & non-structural partition changes. remodel entire flr including kitchenDetails
revision to app#201310189745. new interior stair, coner window at facade, new skylights. 1st floor: excavate to increase ceiling hight. convert extg unconditoin space to habitable. master bed & bath. 2nd fl: structural & non-structural partition changes. remodel entire flr including kitchen | $70,000 |
| May 18, 2015 | Completed final sign-off Sep 2015 | 45 Ora Wy | T T General Construction | 1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changesDetails
1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changes | $30,000 |
| Apr 21, 2015 | Never finaled issued Jun 2016, no final | 945 Woolsey St | Andrew Zhao's Construction Co | 2 story rear addition, 1st floor: laundry, 1 bedroom, 1 bath, 2nd floor: sun roomDetails
2 story rear addition, 1st floor: laundry, 1 bedroom, 1 bath, 2nd floor: sun room | $100,000 |
| Mar 4, 2015 | Never finaled issued Jan 2018, no final | 41 Peralta Av | Promax Builders Inc Dba Procraft Builder | renovation to 2nd story new deck on 2nd floor, add dormers to 3rd story.Details
renovation to 2nd story new deck on 2nd floor, add dormers to 3rd story. | $100,000 |
| Nov 21, 2014 | Never finaled issued Apr 2015, no final | 2400 Green St | remove (e) roof deck & trellis, add new roof deck & required structure.Details
remove (e) roof deck & trellis, add new roof deck & required structure. | $30,000 | |
| Sep 19, 2014 | Never finaled issued Aug 2015, no final | 734 Andover St | vertical addition of 9'-7" (2nd story). horizontal addition to front. add master bedroom, bath, sitting room & garage.Details
vertical addition of 9'-7" (2nd story). horizontal addition to front. add master bedroom, bath, sitting room & garage. | $180,000 | |
| Jul 31, 2014 | Completed final sign-off May 2016 | 3303 Folsom St | T T General Construction | revision to appl #2014.0321.1414 - convert from 1 dwelling unit to 2 dwelling units (floors 1&2 one unit, floors 3 & 4 second unit). new bathroom on 1st floor, new kitchen, remove int stair on 2nd floor. change sprinklers to nfpa 13.Details
revision to appl #2014.0321.1414 - convert from 1 dwelling unit to 2 dwelling units (floors 1&2 one unit, floors 3 & 4 second unit). new bathroom on 1st floor, new kitchen, remove int stair on 2nd floor. change sprinklers to nfpa 13. | $20,000 |
| Jun 23, 2014 | Expired or cancelled cancelled Mar 2020 | 97 Anderson St | raise roof by 4'. reconfigure floor plan to include 4 bedrooms & 3 baths.Details
raise roof by 4'. reconfigure floor plan to include 4 bedrooms & 3 baths. | $200,000 | |
| Jun 20, 2014 | Completed final sign-off May 2015 | 3701 Clay St | Doran Construction & Design | construction of new stairway (exterior), replace existing. demo and reconfigure partiton walls, kitchen remodel, bath remodelDetails
construction of new stairway (exterior), replace existing. demo and reconfigure partiton walls, kitchen remodel, bath remodel | $165,000 |
| Jun 20, 2014 | Completed final sign-off Apr 2015 | 3701 Clay St | Doran Construction & Design | replace e window as noted on plans with wood to match (e) size, configuration, profile u factor 0.47 or greater. match ogee lugs. see permit applic. #201406208956.Details
replace e window as noted on plans with wood to match (e) size, configuration, profile u factor 0.47 or greater. match ogee lugs. see permit applic. #201406208956. | $10,000 |
| Mar 25, 2014 | Completed final sign-off Jan 2017 | 1682 44th Av | Lee & Company Contractors Inc | rear 1-story addition: master bedroom & bathDetails
rear 1-story addition: master bedroom & bath | $35,000 |
| Mar 25, 2014 | Never finaled issued Feb 2020, no final | 4123 23rd St | basement & rear horizontal addition. (n) stairs connecting 1st & basement floor. building to remain as 2 dwelling units.Details
basement & rear horizontal addition. (n) stairs connecting 1st & basement floor. building to remain as 2 dwelling units. | $200,000 | |
| Mar 25, 2014 | Completed final sign-off Aug 2020 | 116 Laidley St | Barrera & Associates Construction Inc | front addition, one bedroom and 3/4 bath, add garage. (n) site stair.Details
front addition, one bedroom and 3/4 bath, add garage. (n) site stair. | $180,000 |
| Mar 21, 2014 | Completed final sign-off May 2016 | 3303 Folsom St | T T General Construction | convert 2 extg floors to habitable. lower floor at story 2. repair extg decks.Details
convert 2 extg floors to habitable. lower floor at story 2. repair extg decks. | $120,000 |
| Jan 8, 2014 | Completed final sign-off Oct 2014 | 3702 Folsom St | T T General Construction | convert basement to habitable, new foundation walls, lower slab @ basement, new doors & windows as shown. slightly enlarge garage door.Details
convert basement to habitable, new foundation walls, lower slab @ basement, new doors & windows as shown. slightly enlarge garage door. | $75,000 |
| Oct 3, 2013 | Completed final sign-off Nov 2016 | 109 Gates St | convert (e) loft to habitable space. add shed roof to north side of roof. (n) window at front.Details
convert (e) loft to habitable space. add shed roof to north side of roof. (n) window at front. | $50,000 | |
| Oct 3, 2013 | Completed final sign-off Aug 2014 | 1108 Rhode Island St | T T General Construction | fill in light well at north side, kitchen remodel 2nd fl, new window at lightwell, add 2 skylightsDetails
fill in light well at north side, kitchen remodel 2nd fl, new window at lightwell, add 2 skylights | $25,000 |
| Jul 31, 2013 | Completed final sign-off Jan 2014 | 933 20th St | T T General Construction | revision to pa #201306078960, add residetial style (non commercial)kitchen to messanine.Details
revision to pa #201306078960, add residetial style (non commercial)kitchen to messanine. | $12,000 |
| Jul 12, 2013 | Completed final sign-off Jan 2014 | 933 20th St | T T General Construction | revision to 201306078960 - omit sparayed on fireproofing. substitute gyp bd. fireproofing. omit fireproofing to stairs as shown in 2013-0607-8960.Details
revision to 201306078960 - omit sparayed on fireproofing. substitute gyp bd. fireproofing. omit fireproofing to stairs as shown in 2013-0607-8960. | |
| Jun 19, 2013 | Completed final sign-off Oct 2013 | 2170 Pacific Av | Lee & Company Contractors Inc | bathroom remodel - remove non-load bearing partitions, relcoate fixtures, relocate elec panel. remove window & replace with smaller unit.Details
bathroom remodel - remove non-load bearing partitions, relcoate fixtures, relocate elec panel. remove window & replace with smaller unit. | $40,000 |
| Apr 9, 2013 | Completed final sign-off Mar 2015 | 1610 Sanchez St | L C Builders Inc. | rear horizontal addition. 3rd story vertical addition.Details
rear horizontal addition. 3rd story vertical addition. | $150,000 |
| Mar 13, 2013 | Completed final sign-off Jul 2014 | 43 Powers Av | T T General Construction | variance in process (tara sullivan): 2012.1075v. expand (e) 2nd story deck, (n) roof deck over 2nd story roof @ rear of bldgDetails
variance in process (tara sullivan): 2012.1075v. expand (e) 2nd story deck, (n) roof deck over 2nd story roof @ rear of bldg | $10,000 |
| Sep 7, 2012 | Completed final sign-off Jan 2014 | 1417 Dolores St | Phil Park Construction | remove (e) walls. structural improvements. remove chimney. kitchen remodelDetails
remove (e) walls. structural improvements. remove chimney. kitchen remodel | $7,000 |
| Aug 21, 2012 | Expired or cancelled cancelled Jan 2024 | 3771 Clay St | At6 Design Build | 4-story rear addition. new front entry stair & guardrails. replace (e) windows at front of house. remodel kitchen.Details
4-story rear addition. new front entry stair & guardrails. replace (e) windows at front of house. remodel kitchen. | $360,000 |
| May 24, 2012 | Expired or cancelled expired Mar 2017 | 560 Precita Av | horizontal addition at rear over basement 2 story, new master bedroom and bathroom. enlarged kitchen and new family room at basement level. no increase in building height.Details
horizontal addition at rear over basement 2 story, new master bedroom and bathroom. enlarged kitchen and new family room at basement level. no increase in building height. | $130,000 | |
| Apr 20, 2012 | Expired or cancelled cancelled Jan 2026 | 1972 10th Av | convert (e) covered entry & open light well to conditioned space. renovate (e) lower level. new bedroom, new laundry room, new bathroom and family room at ground floor. replace window at fron of house in kind.Details
convert (e) covered entry & open light well to conditioned space. renovate (e) lower level. new bedroom, new laundry room, new bathroom and family room at ground floor. replace window at fron of house in kind. | $60,000 | |
| Feb 1, 2012 | Completed final sign-off Aug 2012 | 1087 Francisco St | add roof deck & spiral stair. convert 2 units to 1 unit under pa# 2011/01/03/7790.Details
add roof deck & spiral stair. convert 2 units to 1 unit under pa# 2011/01/03/7790. | $15,000 | |
| Jan 4, 2012 | Completed final sign-off Jun 2012 | 64 Pierce St | Teutonic Construction Inc | replace driveway slope to match (e), create planter beds & 30" high diverter, add curb to street tree, obtain encroachment permit.Details
replace driveway slope to match (e), create planter beds & 30" high diverter, add curb to street tree, obtain encroachment permit. | $8,000 |
| May 17, 2011 | Completed final sign-off Sep 2012 | 17 Bennington St | expand (e) 2nd floor room & rear of bldg to create new master suite. relocate (e) interior stair. relocate (e) kitchen.Details
expand (e) 2nd floor room & rear of bldg to create new master suite. relocate (e) interior stair. relocate (e) kitchen. | $60,000 | |
| Jan 3, 2011 | Completed final sign-off Aug 2012 | 1087 Francisco St | convert 2 dwelling units to 1. interior remodel. replace windows remove (e) ext stair in lightwell (west). infill (east) light well @ ground floor. repaire facade. replace garage door. convert area at rear of garage to habitable.Details
convert 2 dwelling units to 1. interior remodel. replace windows remove (e) ext stair in lightwell (west). infill (east) light well @ ground floor. repaire facade. replace garage door. convert area at rear of garage to habitable. | $200,000 | |
| Dec 17, 2010 | Completed final sign-off Jul 2011 | 197 Gates St | interior remodel including removal of interior pantry wall, kitchen remodel - larger openings between rooms. additional plumbing for new kitchen sink. no mov eof gas lines, replace cabinets & counters. all work to be done in downstairs uit #197.Details
interior remodel including removal of interior pantry wall, kitchen remodel - larger openings between rooms. additional plumbing for new kitchen sink. no mov eof gas lines, replace cabinets & counters. all work to be done in downstairs uit #197. | $25,000 | |
| Jun 23, 2010 | Completed final sign-off Jul 2012 | 23 Porter St | 1 story rear addition @ 2nd floor over existing 1st floor family room. addition will add 1 bedroom. rear yard & parking variance has been approved.Details
1 story rear addition @ 2nd floor over existing 1st floor family room. addition will add 1 bedroom. rear yard & parking variance has been approved. | $75,000 | |
| Jun 23, 2010 | Completed final sign-off Jun 2012 | 64 Pierce St | Teutonic Construction Inc | add a 1st story horizontal addition in place of 1st story rear deck (variance in process). add bay window to rear 2nd story (variance in process) convert attic & part of basement to habitable. add dormers to rear portion of attic.Details
add a 1st story horizontal addition in place of 1st story rear deck (variance in process). add bay window to rear 2nd story (variance in process) convert attic & part of basement to habitable. add dormers to rear portion of attic. | $275,000 |
| Apr 22, 2010 | Expired or cancelled expired Oct 2013 | 3702 Folsom St | Fahey Building/Remodeling | legalize/remodel master bath on 2nd floor. enlarge window at bedroom, roof deck above sundroom, property line window per ab009, skylightDetails
legalize/remodel master bath on 2nd floor. enlarge window at bedroom, roof deck above sundroom, property line window per ab009, skylight | $25,000 |
| Mar 31, 2009 | Completed final sign-off Mar 2010 | 115 Fillmore St | J C Woodworks & Design | repair extg stairway(required means of egress) in kind. repair extg rear sunroom portion of house. relocate extg kchn to sunroom at 3rd floor. new bay wndw at 3rd floor and rear of bldg. remodel kchn at 2nd floor. replace windows at kitchen & sunroom.Details
repair extg stairway(required means of egress) in kind. repair extg rear sunroom portion of house. relocate extg kchn to sunroom at 3rd floor. new bay wndw at 3rd floor and rear of bldg. remodel kchn at 2nd floor. replace windows at kitchen & sunroom. | $40,000 |
| Jan 29, 2009 | Completed final sign-off Mar 2010 | 3 Nebraska St | Dlw Construction Inc. | reconfigure, remodel kitchen & laundry area, relocate 1st fl bathroom, add gas fireplace, replace rear french door w/ large slider door, add skylights.Details
reconfigure, remodel kitchen & laundry area, relocate 1st fl bathroom, add gas fireplace, replace rear french door w/ large slider door, add skylights. | $75,000 |
| Apr 16, 2008 | Completed final sign-off Sep 2008 | 270 Lobos St | Hammerhouse Construction | bathroom remodel, new radiant heat system, electrical upgrades, dryrot repair, new laundry room (conditioned space at garage), chairlift at entry posts.Details
bathroom remodel, new radiant heat system, electrical upgrades, dryrot repair, new laundry room (conditioned space at garage), chairlift at entry posts. | $75,000 |
| Apr 3, 2008 | Completed final sign-off Aug 2008 | 64 Pierce St | Sean T Condry | new master bathroom serving (e) master bedroomDetails
new master bathroom serving (e) master bedroom | $20,000 |
| Mar 18, 2008 | Expired or cancelled expired Apr 2010 | 2226 Clay St | new bathroom serving (e) guest bedroom at ground levelDetails
new bathroom serving (e) guest bedroom at ground level | $30,000 | |
| Feb 8, 2008 | Completed final sign-off May 2008 | 3433 Broderick St | enlarge existing opening in 2nd flo bearing wall between kitchen and hall wayDetails
enlarge existing opening in 2nd flo bearing wall between kitchen and hall way | $1,500 | |
| Mar 26, 2007 | Expired or cancelled expired Mar 2008 | 3730 Folsom St | Delta Builders Inc. | replace (e) window @ front of bldg. add box b at window @ 2nd floro, relocate wall in recessed entry. new siding, new awning.Details
replace (e) window @ front of bldg. add box b at window @ 2nd floro, relocate wall in recessed entry. new siding, new awning. | $2,000 |
| Feb 1, 2007 | Completed final sign-off May 2008 | 119 Hoffman Av | two story horizontal additionDetails
two story horizontal addition | $35,000 |