Block 2607, lot 062
451 A Buena Vista Ave East
- City’s use
- Multi-Family Residential
- Built
- 1939
- Stories
- 3
- Units
- 2
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,391 sq ft
- Lot
- 3,123 sq ft
- Zoning
- RH3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 8, 2020 | Completed final sign-off Sep 2020 | 451 Buena Vista Ave East Av | Doran Construction & Design | revision to pa# 201708023666 & 201803295037 & 201702203342. (n) skylights at roof.Details
revision to pa# 201708023666 & 201803295037 & 201702203342. (n) skylights at roof. | $500 |
| Feb 19, 2020 | Never finaled issued Feb 2020, no final | 451 Buena Vista East Av | streetspaceDetails
streetspace | ||
| Jan 21, 2020 | Never finaled issued Feb 2020, no final | 451 Buena Vista East Av | Doran Construction & Design | rev to pa# 201711174287; replace failing retaining walls at rear yardDetails
rev to pa# 201711174287; replace failing retaining walls at rear yard | |
| Dec 12, 2019 | Completed final sign-off Apr 2020 | 451 Buena Vista East Av | San Francisco Fire Protection | install new sprinkler monitoring system. install facp, heat detector, pull station, monitoring modules on waterflow and tamper switchDetails
install new sprinkler monitoring system. install facp, heat detector, pull station, monitoring modules on waterflow and tamper switch | $5,000 |
| Oct 23, 2019 | Never finaled issued Mar 2021, no final | 451 Buena Vista East Av | Doran Construction & Design | new rear yard fencesDetails
new rear yard fences | $3,000 |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 451 Buena Vista East Av | street spaceDetails
street space | ||
| Apr 11, 2019 | Completed final sign-off Mar 2020 | 451 Buena Vista East Av | Todd Morris Fire Protection Inc. | install new 2" copper dedicated fire underground and nfpa13r system for buildng being remodeled ref: pa201902203342Details
install new 2" copper dedicated fire underground and nfpa13r system for buildng being remodeled ref: pa201902203342 | $19,900 |
| Mar 20, 2019 | Never finaled issued Mar 2019, no final | 451 Buena Vista Ave East Av | street spaceDetails
street space | ||
| Feb 20, 2019 | Completed final sign-off Sep 2020 | 451 Buena Vista East Av | Doran Construction & Design | revision to pa #201708023666. remove exterior stair connecting 2nd & 3rd fl. fire sprinkler throughout per nfpa 13r under sep permit. (n) siding at rear & side facade.Details
revision to pa #201708023666. remove exterior stair connecting 2nd & 3rd fl. fire sprinkler throughout per nfpa 13r under sep permit. (n) siding at rear & side facade. | $15,000 |
| Sep 28, 2018 | Never finaled issued Sep 2018, no final | 451 Buena Vista East Av | street space onlyDetails
street space only | ||
| Mar 29, 2018 | Completed final sign-off Sep 2020 | 451 Buena Vista East Av | Doran Construction & Design | revision to 201708023666. remove permitted sprinkler system. e exterior stair to remain. replace front windows with clad wood windowsl remove front planter beds. minor int and elec changes per plans. clarify that e non convorming stair will be allowed to remain w wall removed. minor alterations to eDetails
revision to 201708023666. remove permitted sprinkler system. e exterior stair to remain. replace front windows with clad wood windowsl remove front planter beds. minor int and elec changes per plans. clarify that e non convorming stair will be allowed to remain w wall removed. minor alterations to e | |
| Nov 17, 2017 | Completed final sign-off Sep 2020 | 451 Buena Vista East Av | Doran Construction & Design | infill third floor. new 1st floor front gate. new 2nd floor front windows, new 3rd floor windows and doors. new front facade standing seam metal siding. new siding at rear, deck and stairs.Details
infill third floor. new 1st floor front gate. new 2nd floor front windows, new 3rd floor windows and doors. new front facade standing seam metal siding. new siding at rear, deck and stairs. | $60,000 |
| Aug 2, 2017 | Completed final sign-off Sep 2020 | 451 Buena Vista East Av | Doran Construction & Design | convert to 2 units. int reno: 1st- new kit, partitions @ lobby, refinish (e) stair & bath. 2nd - new kit, fam rm, dining & bath, refinish (e) stair adding new guard/handrail. 3rd flr - new laundry, refinish bath, infill covered deck. new ext wind/doors @rear. remove ext stairs 2nd/3rd. fire sepDetails
convert to 2 units. int reno: 1st- new kit, partitions @ lobby, refinish (e) stair & bath. 2nd - new kit, fam rm, dining & bath, refinish (e) stair adding new guard/handrail. 3rd flr - new laundry, refinish bath, infill covered deck. new ext wind/doors @rear. remove ext stairs 2nd/3rd. fire sep | $230,000 |
| Sep 30, 2014 | Completed final sign-off Oct 2014 | 451 Buena Vista East Av | Britannia Construction, Inc. | to obtain final inspection for work approved under pa201308013331Details
to obtain final inspection for work approved under pa201308013331 | |
| Aug 1, 2013 | Never finaled issued Aug 2013, no final | 451 Buena Vista East Av | Britannia Construction, Inc. | vehicle damaged repair to garage wood, visible from the street.Details
vehicle damaged repair to garage wood, visible from the street. | $950 |
| Apr 7, 2008 | Completed final sign-off Apr 2008 | 451 Buena Vista East Av | Quality Roofing | reroofingDetails
reroofing | $3,900 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Doran Construction & Design (7), Britannia Construction, Inc. (2), Quality Roofing, San Francisco Fire Protection, Todd Morris Fire Protection Inc.
- Architects
- Sven Erik Lavine (3), Sven Lavine
Find contractors for work like this