Block 3532, lot 055
82 Woodward St
- City’s use
- Multi-Family Residential
- Built
- 1912
- Stories
- 2
- Units
- 2
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,582 sq ft
- Lot
- 1,624 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2025 | Completed final sign-off Sep 2026 | 82 Woodward St | Doran Construction & Design, Olive Remodeling | 2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work.Details
2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work. | $150,000 |
| Jun 9, 2025 | In progress filed Jun 2025, not yet issued | 82 Woodward St | Doran Construction & Design | new gate and new garage entrance. metal gate to match (e) front entryDetails
new gate and new garage entrance. metal gate to match (e) front entry | $800 |
| Jan 23, 2025 | Expired or cancelled withdrawn Oct 2025 | 82 Woodward St | Doran Construction & Design | 1/f: raised garage entry door. 2/f: remodel powder, bath and kitchen. 3/f: new office, dining, bed and bath. remodel powder, bath and kitchen. replace in kind window at rear 2/f and 3/f. new heat pump system.Details
1/f: raised garage entry door. 2/f: remodel powder, bath and kitchen. 3/f: new office, dining, bed and bath. remodel powder, bath and kitchen. replace in kind window at rear 2/f and 3/f. new heat pump system. | $85,000 |
| Dec 1, 2023 | Completed final sign-off Nov 2024 | 82 Woodward St | Doran Construction & Design | (e) middle beam strengethening with related footings (1st level). voluntary localized strengthening of 1st / garage level.Details
(e) middle beam strengethening with related footings (1st level). voluntary localized strengthening of 1st / garage level. | $35,000 |
| Jul 11, 2018 | Never finaled issued Jul 2018, no final | 82 Woodward St | street spaceDetails
street space | ||
| Jun 19, 2018 | Completed final sign-off Aug 2018 | 82 Woodward St | Dba Golden Gate Termite, Diodati Inc | perform the repairs as outlines in nov#201866351, items 3/4/5/6/7/10/11/12. note item 8 by owners licensed painting contractor; less than 50%, like for like.Details
perform the repairs as outlines in nov#201866351, items 3/4/5/6/7/10/11/12. note item 8 by owners licensed painting contractor; less than 50%, like for like. | $30,000 |
| Jun 19, 2018 | Completed final sign-off Aug 2018 | 82 Woodward St | Dba Golden Gate Termite, Diodati Inc | perform work as outlines in report 20917, item 5/6/7/8. like for like, less than 50%.Details
perform work as outlines in report 20917, item 5/6/7/8. like for like, less than 50%. | $22,000 |
| Oct 17, 2008 | Never finaled issued Oct 2008, no final | 82 Woodward St | street space permit only.Details
street space permit only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Doran Construction & Design (4), Dba Golden Gate Termite, Diodati Inc (2), Olive Remodeling
- Architects
- Sven Eric Lavine (3)
- Engineers
- Fareed Himmati (2), Fareed Himmati
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.