Block 7537, lot 002
2306 Castro St
- City’s use
- Single Family Residential
- Built
- 2021
- Stories
- 3
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,850 sq ft
- Lot
- 1,999 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 28, 2021 | Completed final sign-off Jun 2021 | 2306 Castro St | Doran Construction & Design | to obtain final inspection for work approved under permit app # 2017-0822-5555. all work is complete.Details
to obtain final inspection for work approved under permit app # 2017-0822-5555. all work is complete. | |
| Feb 6, 2019 | Completed final sign-off Mar 2019 | 2306 Castro St | San Francisco Fire Protection | sprinikler waterflow and sup system install new conrol unit, radio communicator, heat detector and pull station in garage area. install monitor modules, to fie in flow and tamper switch to be monitor 201806202357Details
sprinikler waterflow and sup system install new conrol unit, radio communicator, heat detector and pull station in garage area. install monitor modules, to fie in flow and tamper switch to be monitor 201806202357 | $3,000 |
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 2306 Castro St | street spaceDetails
street space | ||
| Jun 20, 2018 | Completed final sign-off Mar 2019 | 2306 Castro St | Todd Morris Fire Protection Inc. | ref pa# 201510230698; install new 2" copper-k underground and automatic sprinklers system for home being remodeled nfpa 13r for residential and nfpa 13 for garage. sprinkler monitoring separate permit.Details
ref pa# 201510230698; install new 2" copper-k underground and automatic sprinklers system for home being remodeled nfpa 13r for residential and nfpa 13 for garage. sprinkler monitoring separate permit. | $13,000 |
| Dec 7, 2017 | Never finaled issued Dec 2017, no final | 2306 Castro St | street spaceDetails
street space | ||
| Nov 15, 2017 | Completed final sign-off Jun 2021 | 2306 Castro St | Doran Construction & Design | revision to approved permit #201510230698. shifting 2nd/3rd fl real wall 6" east (aligning w/ adjacent building to the south). reconfigure interior partions to accomodate the 6" shiftDetails
revision to approved permit #201510230698. shifting 2nd/3rd fl real wall 6" east (aligning w/ adjacent building to the south). reconfigure interior partions to accomodate the 6" shift | |
| Aug 22, 2017 | Completed final sign-off Jun 2021 | 2306 Castro St | Doran Construction & Design | revision to pa# 201510230698 (s-1) grade beam foundation, revised to grade beam and pier system to comply with geotech requirementsDetails
revision to pa# 201510230698 (s-1) grade beam foundation, revised to grade beam and pier system to comply with geotech requirements | $8,000 |
| Oct 23, 2015 | Completed final sign-off Jul 2021 | 2306 Castro St | Doran Construction & Design | to erect 3 stories, no basement, single family building.Details
to erect 3 stories, no basement, single family building. | $350,000 |
| Oct 13, 2015 | Completed final sign-off Mar 2018 | 2306 Castro St | Hurricane Hauling Inc. | to demolish 1 story single family dwelling.Details
to demolish 1 story single family dwelling. | $14,750 |
| Jun 15, 2015 | Expired or cancelled expired Jun 2021 | 2306 Castro St | Cornerstone Dba Ag Construction | revision to app#201310189745. new interior stair, coner window at facade, new skylights. 1st floor: excavate to increase ceiling hight. convert extg unconditoin space to habitable. master bed & bath. 2nd fl: structural & non-structural partition changes. remodel entire flr including kitchenDetails
revision to app#201310189745. new interior stair, coner window at facade, new skylights. 1st floor: excavate to increase ceiling hight. convert extg unconditoin space to habitable. master bed & bath. 2nd fl: structural & non-structural partition changes. remodel entire flr including kitchen | $70,000 |
| Jul 29, 2014 | Expired or cancelled withdrawn Jun 2015 | 2306 Castro St | remodel (e) 1st floor. new bedroom, walk-in closet, full bathroom & wet bar. remodel (e) 2/fl, relocate (e) kitchen, convert (e) bedroom to new family. 3/fl vertical addition for bedrooms and 2 full bath. new interior stair, 1 level wood deck, new roof deck. all work per plan.Details
remodel (e) 1st floor. new bedroom, walk-in closet, full bathroom & wet bar. remodel (e) 2/fl, relocate (e) kitchen, convert (e) bedroom to new family. 3/fl vertical addition for bedrooms and 2 full bath. new interior stair, 1 level wood deck, new roof deck. all work per plan. | $49,000 | |
| Oct 18, 2013 | Expired or cancelled expired Jun 2021 | 2306 Castro St | Mz Construction Company | kitchen remodel, remove walls at kitchen, legalize storage rooms at gr flDetails
kitchen remodel, remove walls at kitchen, legalize storage rooms at gr fl | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Doran Construction & Design (4), Cornerstone Dba Ag Construction, Hurricane Hauling Inc., Mz Construction Company, San Francisco Fire Protection, Todd Morris Fire Protection Inc.
- Architects
- Sven Eric Lavine (2), Xie Xing Guan
- Engineers
- Fareed Himmati
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.