Block 7531, lot 072
45 Ora Way
- City’s use
- Single Family Residential
- Built
- 1975
- Stories
- 1
- Units
- 1
- Rooms
- 1 bedroom, 2 bathrooms
- Building
- 684 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2025 | Completed final sign-off Mar 2026 | 45 Ora Wy | Fidelity Roof Company | re roofing: no hot works.Details
re roofing: no hot works. | $62,968 |
| Nov 13, 2023 | Completed final sign-off Mar 2024 | 43 Ora Wy | Siemens Industry, Inc. | 1st fl - fire only work to verify existing sound levels in sleeping areas, comply with sffc section 1103.7.6.3.1 no ref #Details
1st fl - fire only work to verify existing sound levels in sleeping areas, comply with sffc section 1103.7.6.3.1 no ref # | |
| Nov 16, 2020 | Completed final sign-off Nov 2021 | 43 Ora Wy | Engineered Soils Repairs | remove (e) railroad tie retaining wall and replace with a new solider pile and wood lagging retaining wall with a subdrain. approx 48lf at 2' and 5' ht range.same alignment as existing. work is in hoa common area adj to 80 ora way.Details
remove (e) railroad tie retaining wall and replace with a new solider pile and wood lagging retaining wall with a subdrain. approx 48lf at 2' and 5' ht range.same alignment as existing. work is in hoa common area adj to 80 ora way. | $74,804 |
| Sep 25, 2018 | Never finaled issued Sep 2018, no final | 45 Ora Wy | Sequoia Construction Services Inc | remove trim, siding, windows. rebuild like for like. r&r 14 windows. max u factor 0.32. not visible from street, same sizes and locations.Details
remove trim, siding, windows. rebuild like for like. r&r 14 windows. max u factor 0.32. not visible from street, same sizes and locations. | $15,000 |
| Jul 10, 2018 | Completed final sign-off Aug 2018 | 43 Ora Wy | Sequoia Construction Services Inc | reroofing.Details
reroofing. | $22,965 |
| Jul 5, 2018 | Completed final sign-off Feb 2019 | 45 Ora Wy | Sequoia Construction Services Inc | reroofingDetails
reroofing | $34,361 |
| Apr 30, 2018 | Completed final sign-off May 2018 | 45 Ora Wy | Rain Defense | reroofingDetails
reroofing | $16,500 |
| Sep 1, 2016 | Completed final sign-off Nov 2016 | 43 Ora Wy | Sequoia Construction Services Inc | remove e single pane glass & replace with new vinyl dual pane window. like for like. not visible from street.Details
remove e single pane glass & replace with new vinyl dual pane window. like for like. not visible from street. | $22,000 |
| Jul 28, 2015 | Completed final sign-off Sep 2015 | 43 Ora Wy | Aaron Gordon Construction Inc | exterior repair of common space, work to be done at 60 ora way, 2nd floor entrance/exit north. replace railings to meet code, install secondary ledger at garage side, replace decking board, all "in - kind". less than 50%.Details
exterior repair of common space, work to be done at 60 ora way, 2nd floor entrance/exit north. replace railings to meet code, install secondary ledger at garage side, replace decking board, all "in - kind". less than 50%. | $3,500 |
| May 18, 2015 | Completed final sign-off Sep 2015 | 45 Ora Wy | T T General Construction | 1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changesDetails
1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changes | $30,000 |
| May 13, 2015 | Completed final sign-off Jul 2015 | 43 Ora Wy | Aaron Gordon Construction Inc | replace 2 in kind 7ft beams, one in kind 6x6 post and in kind 15 ft railing at "common area bridges" at 85/95 goldmine passagewayDetails
replace 2 in kind 7ft beams, one in kind 6x6 post and in kind 15 ft railing at "common area bridges" at 85/95 goldmine passageway | $7,000 |
| Jul 23, 2014 | Completed final sign-off Sep 2014 | 43 Ora Wy | Aaron Gordon Construction Inc | replace 1 6x8x12 beam at deck.Details
replace 1 6x8x12 beam at deck. | $3,000 |
| Jul 3, 2014 | Completed final sign-off Aug 2014 | 45 Ora Wy | Community Reconstruction Solutions | bldg a: replace shingles on south wall in-kind like-for-like on all 3 stories. must maintain egress throughout construction.Details
bldg a: replace shingles on south wall in-kind like-for-like on all 3 stories. must maintain egress throughout construction. | $8,350 |
| Apr 22, 2014 | Completed final sign-off Aug 2014 | 45 Ora Wy | Siemens Industry, Inc. | voluntary replacement of the fire alarm panel per csfm 12-001, which includes changing out 1 existing annunciator, 15 pull stations, 37 smoke detectors, 3 heat detectors, and a module, existing horn/stroves will be reconnected onto the new panel. this panel also serves the building at 55 ora way.Details
voluntary replacement of the fire alarm panel per csfm 12-001, which includes changing out 1 existing annunciator, 15 pull stations, 37 smoke detectors, 3 heat detectors, and a module, existing horn/stroves will be reconnected onto the new panel. this panel also serves the building at 55 ora way. | $21,450 |
| Jun 28, 2012 | Completed final sign-off Jul 2012 | 43 Ora Wy | Community Reconstruction Solutions | replace in kind 6 (e) windows in kind. max u factor .77. not visible from street.Details
replace in kind 6 (e) windows in kind. max u factor .77. not visible from street. | $3,250 |
| Jul 27, 2011 | Completed final sign-off Aug 2011 | 45 Ora Wy | Community Reconstruction Solutions | siding and trim repair on units 102, 202, 302. approximate 150 s.f. total.Details
siding and trim repair on units 102, 202, 302. approximate 150 s.f. total. | $4,750 |
| Nov 20, 2009 | Completed final sign-off Apr 2010 | 43 Ora Wy | R. C. Construction | unit#a302 - convert portion of upper level into new bathroom. contractor to obtain req'd plbg, elec & plbg permits.Details
unit#a302 - convert portion of upper level into new bathroom. contractor to obtain req'd plbg, elec & plbg permits. | $20,000 |
| Mar 4, 2008 | Completed final sign-off Aug 2008 | 45 Ora Wy | Bay City Boiler & Engineering Co. Inc. | renew pa# 200702013144 & 200610276271Details
renew pa# 200702013144 & 200610276271 | |
| Oct 2, 2007 | Never finaled issued Oct 2007, no final | 43 Ora Wy | street spaceDetails
street space | ||
| Jul 18, 2007 | Expired or cancelled expired Nov 2008 | 43 Ora Wy | Draeger Construction Inc. | remove windows and install new ones, remove siding install new siding and trim. repair dryrot as need it. siting/panel (4'x10') under replacement window only. (furr-down header). no structural work. u factor 0.67. min.Details
remove windows and install new ones, remove siding install new siding and trim. repair dryrot as need it. siting/panel (4'x10') under replacement window only. (furr-down header). no structural work. u factor 0.67. min. | $91,000 |
| Sep 13, 2005 | Expired or cancelled expired Mar 2007 | 43 Ora Wy | Simplex Grinnell | bldg# 85 - fire alarm replacemtn for building 85. device for device change out including facp.Details
bldg# 85 - fire alarm replacemtn for building 85. device for device change out including facp. | $14,000 |
| Nov 4, 2003 | Expired or cancelled expired May 2004 | 45 Ora Wy | Kinney Construction | to renew app#2003/04/01/1156 for final inspection.Details
to renew app#2003/04/01/1156 for final inspection. | |
| Apr 1, 2003 | Completed final sign-off Nov 2003 | 45 Ora Wy | Kinney Construction | removing & replacing kitchen cabinets installing new sink,dishwasher,garbage disposal,range, &Details
removing & replacing kitchen cabinets installing new sink,dishwasher,garbage disposal,range, & | $12,000 |
| Feb 18, 2003 | Completed final sign-off Aug 2003 | 45 Ora Wy | J M S Construction | carports 13, replace wood carports with aluminumDetails
carports 13, replace wood carports with aluminum | $50,000 |
| Jun 12, 2002 | Completed final sign-off Sep 2002 | 45 Ora Wy | fill core holes in concrete slab w/ fire retardant insulation per n.o.v.#200228587Details
fill core holes in concrete slab w/ fire retardant insulation per n.o.v.#200228587 | $500 | |
| May 17, 2000 | Completed final sign-off Aug 2000 | 45 Ora Wy | Mullins General Construction & Fine Pain | replace 3 existing windows & 1 (e) sliding door w/ new sbl pane one & door "in kind"Details
replace 3 existing windows & 1 (e) sliding door w/ new sbl pane one & door "in kind" | $3,600 |
| Apr 19, 2000 | Completed final sign-off Mar 2001 | 45 Ora Wy | Mullins General Construction & Fine Pain | replace trim and siding in kind, with new 5/8" cedar siding & redwood trim,Details
replace trim and siding in kind, with new 5/8" cedar siding & redwood trim, | $27,000 |
| Jan 28, 2000 | Completed final sign-off Mar 2001 | 43 Ora Wy | replace 2 6x6 post & install new tempered glass panelsDetails
replace 2 6x6 post & install new tempered glass panels | $14,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.