Christopher Wilhite
- Listed as
- architect, engineer
- Firm
- Engineered Soil Repairs
- Based in
- Walnut Creek
- On San Francisco permits
- Aug 2005 to May 2025
13 permits since 2000 (engineer on 12 permits, architect on 1 permit): 13 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 12, 2025 | Completed final sign-off Dec 2025 | 2420 Leavenworth St | Engineered Soils Repairs | retaining wall stablization and drainage improvements. repair foundation cracksDetails
retaining wall stablization and drainage improvements. repair foundation cracks | $67,492 |
| May 12, 2025 | Completed final sign-off Dec 2025 | 2430 Leavenworth St | Engineered Soils Repairs | retaining wall stabilization on property line with 2420 leavenworth street includes tiebacks & deadman piers.Details
retaining wall stabilization on property line with 2420 leavenworth street includes tiebacks & deadman piers. | $67,492 |
| Jul 12, 2024 | Completed final sign-off Sep 2024 | 2375 15th Av | Engineered Soils Repairs | replace one existing cracked subfloor wood girdes postDetails
replace one existing cracked subfloor wood girdes post | $4,242 |
| Mar 18, 2022 | Completed final sign-off Dec 2022 | 85 Ora Wy | Engineered Soils Repairs | replace (e) wood retaining wall in common area with stoacked block wall with subdrain. height and length to match (e) wall near building 85 and units 101, 103, 105.Details
replace (e) wood retaining wall in common area with stoacked block wall with subdrain. height and length to match (e) wall near building 85 and units 101, 103, 105. | $35,736 |
| Oct 27, 2021 | Completed final sign-off Apr 2022 | 1948 Washington St | Engineered Soils Repairs | revision to pa 202008121661. underpin helical revision. underpin northeast corner of foundation (uphill side) to prepare for retaining wall replacement. voluntary workDetails
revision to pa 202008121661. underpin helical revision. underpin northeast corner of foundation (uphill side) to prepare for retaining wall replacement. voluntary work | |
| Oct 27, 2021 | Completed final sign-off Apr 2022 | 1946 Washington St | Engineered Soils Repairs | revision to pa 202008121660. retaining wall pier revision and height.Details
revision to pa 202008121660. retaining wall pier revision and height. | |
| Oct 27, 2021 | Completed final sign-off Apr 2022 | 1948 Washington St | Engineered Soils Repairs | revision to pa 202008121682. retaining wall pier revision and height.Details
revision to pa 202008121682. retaining wall pier revision and height. | |
| Jul 20, 2021 | Completed final sign-off Jan 2022 | 10 Imperial Al | Engineered Soils Repairs | cosmetic releveling of portion of residence w/ non skrink groot requires removal of lower protion of siding in the area and replace after relevel (visible from street).Details
cosmetic releveling of portion of residence w/ non skrink groot requires removal of lower protion of siding in the area and replace after relevel (visible from street). | $25,080 |
| Nov 16, 2020 | Completed final sign-off Nov 2021 | 43 Ora Wy | Engineered Soils Repairs | remove (e) railroad tie retaining wall and replace with a new solider pile and wood lagging retaining wall with a subdrain. approx 48lf at 2' and 5' ht range.same alignment as existing. work is in hoa common area adj to 80 ora way.Details
remove (e) railroad tie retaining wall and replace with a new solider pile and wood lagging retaining wall with a subdrain. approx 48lf at 2' and 5' ht range.same alignment as existing. work is in hoa common area adj to 80 ora way. | $74,804 |
| Jun 28, 2018 | Completed final sign-off Nov 2018 | 95 Ora Wy | Engineered Soils Repairs | install subdrain along the east perimeter wall of the north stairwell. install a new sump pump with electrical with automatic pump. collected water will be pumped to landscaped area near garage. remove and replace section of keystone and slab around garage vent as necessary to install subdrainDetails
install subdrain along the east perimeter wall of the north stairwell. install a new sump pump with electrical with automatic pump. collected water will be pumped to landscaped area near garage. remove and replace section of keystone and slab around garage vent as necessary to install subdrain | $37,979 |
| Nov 3, 2009 | Completed final sign-off Mar 2010 | 32 Cole St | Engineered Soils Repairs | remove & replace a failing concrete retaining wall.Details
remove & replace a failing concrete retaining wall. | $34,000 |
| Feb 28, 2008 | Completed final sign-off Apr 2008 | 1600 08th Av | Engineered Soils Repairs | install new plywood panel, holddowns and simpson h1 over (e) cripple wall in basement/garage areaDetails
install new plywood panel, holddowns and simpson h1 over (e) cripple wall in basement/garage area | $5,100 |
| Aug 4, 2005 | Completed final sign-off Aug 2005 | 2638 Baker St | Engineered Soils Repairs | install reinforced concrete wall a long (e) concrete/block wall. install geo composite. drainageDetails
install reinforced concrete wall a long (e) concrete/block wall. install geo composite. drainage | $15,000 |