Douglas Hohbach
- Listed as
- engineer
- Firm
- Hohbach-Lewin, Inc.
- Based in
- Palo Alto
- On San Francisco permits
- May 2022 to May 2024
4 permits since 2000 (engineer on 4 permits): 2 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2024 | Completed final sign-off Jan 2025 | 390 09th St | Rossi Builders Inc. | voluntary seismic upgrade. add power door operator to restroom 1, replace (e) restroom signage, replace (e) stair handrails and guardrailsDetails
voluntary seismic upgrade. add power door operator to restroom 1, replace (e) restroom signage, replace (e) stair handrails and guardrails | $250,000 |
| Mar 14, 2023 | Expired or cancelled expired Feb 2025 | 299 Edgewood Av | Eastwood Development Incorporated | structural revision to permit 201809059130 to include taller concrete walls and wider footings along northern and southern elevators.Details
structural revision to permit 201809059130 to include taller concrete walls and wider footings along northern and southern elevators. | |
| Oct 20, 2022 | Expired or cancelled expired Feb 2025 | 299 Edgewood Av | Eastwood Development Incorporated | structural revision to permit 201809059130 to include slope and seismic hazard zone protection checklist along with revised foundation detail on s5.2.Details
structural revision to permit 201809059130 to include slope and seismic hazard zone protection checklist along with revised foundation detail on s5.2. | |
| May 6, 2022 | Completed final sign-off May 2023 | 2525 03rd St | Dome Construction Corp | renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work.Details
renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work. | $3,242,000 |