Thomas Engel
- Based in
- San Francisco
- On San Francisco permits
- Nov 2015 to Jun 2026
- Last 24 months
- 1 permit filed
8 permits since 2000: 7 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2026 | In progress issued Jun 2026 | 5546 Fulton St | exterior painting at rear, some interior painting, upgrade one bath, shower at 3rd floor. like, no lay out change.Details
exterior painting at rear, some interior painting, upgrade one bath, shower at 3rd floor. like, no lay out change. | $25,000 |
| Sep 26, 2024 | Completed final sign-off Feb 2026 | 268 Chestnut St | kitchen and bath refacing cabinet fronts, refinish flooring, hardwood, paitnting throughout, upgrade rechange interior doorsDetails
kitchen and bath refacing cabinet fronts, refinish flooring, hardwood, paitnting throughout, upgrade rechange interior doors | $178,000 |
| Sep 19, 2023 | Completed final sign-off Jun 2024 | 2121 Broadway | paiting througout, cabinet upgrade, bathroom remodelDetails
paiting througout, cabinet upgrade, bathroom remodel | $178,000 |
| May 27, 2020 | Completed final sign-off Feb 2021 | 2565 03rd St | removal of 1 non-structural, metal framed sheet rock partition wall and 2 sides of non-structural metal framed sheets rock walls at bathroom. no further demo work. all work performed in unit #221. building is asbestos free. sprinkler under sep permit.Details
removal of 1 non-structural, metal framed sheet rock partition wall and 2 sides of non-structural metal framed sheets rock walls at bathroom. no further demo work. all work performed in unit #221. building is asbestos free. sprinkler under sep permit. | $173,000 |
| Apr 12, 2019 | Completed final sign-off Jul 2019 | 2 Kronquist Ct | 1 bathroom remodel. no change in walls and openings layout.Details
1 bathroom remodel. no change in walls and openings layout. | $48,000 |
| Oct 10, 2018 | Completed final sign-off Mar 2019 | 2 Kronquist Ct | new tile, paint light fixture, new vanity, only surface remodel, non structural (2 bathrooms 50 sq ft & 25 sq ft. 75 sqft tottal)Details
new tile, paint light fixture, new vanity, only surface remodel, non structural (2 bathrooms 50 sq ft & 25 sq ft. 75 sqft tottal) | $73,000 |
| Feb 11, 2016 | Completed final sign-off Apr 2016 | 2569 03rd St | interior renovation of gift shop: removal of non-load bearing partial height partitons addition of new fixed casework and shelfing unit. n/a for maher.Details
interior renovation of gift shop: removal of non-load bearing partial height partitons addition of new fixed casework and shelfing unit. n/a for maher. | $30,000 |
| Nov 5, 2015 | Completed final sign-off Dec 2016 | 2569 03rd St | electric double faced signDetails
electric double faced sign | $7,000 |