Block 0654, lot 005
2001 Fillmore St
- City’s use
- Commercial Retail
- Built
- 1900
- Stories
- 2
- Units
- 10
- Rooms
- 4 bathrooms
- Building
- 6,927 sq ft
- Lot
- 3,281 sq ft
- Zoning
- FILLMR
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2026 | In progress filed Nov 2026, not yet issued | 2001 Fillmore St | revision to pa #202602276703: including interior trash room. walk-in cooler, metal floor framing, removal of lift framing scope and hvac plans and specsDetails
revision to pa #202602276703: including interior trash room. walk-in cooler, metal floor framing, removal of lift framing scope and hvac plans and specs | ||
| Oct 9, 2026 | In progress issued Oct 2026 | 2001 Fillmore St | Nabi Construction & Engineering Inc | revision to pa #202607084730 to remove existing wall and provide new bearing wall at gl-bDetails
revision to pa #202607084730 to remove existing wall and provide new bearing wall at gl-b | $8,000 |
| Jul 8, 2026 | In progress issued Aug 2026 | 2001 Fillmore St | Nabi Construction & Engineering Inc | @ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others.Details
@ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others. | $45,000 |
| Feb 27, 2026 | In progress issued Jul 2026 | 2001 Fillmore St | Alsterlind Construction Inc. | restaurant tenant improvement with entry relocation.Details
restaurant tenant improvement with entry relocation. | $250,000 |
| Sep 25, 2025 | In progress issued Oct 2025 | 2001 Fillmore St | T N T Demolition Dba T N T Construction | at (e) ground floor and mezzanine, interior non structural demo (e) finishes, non structgural walls, fixtures, furnisings within an (e) vacant restaurant space. in accordance with sfbc ab-17 access upgrades will be deferred.Details
at (e) ground floor and mezzanine, interior non structural demo (e) finishes, non structgural walls, fixtures, furnisings within an (e) vacant restaurant space. in accordance with sfbc ab-17 access upgrades will be deferred. | $35,000 |
| Jun 8, 2020 | Completed final sign-off Apr 2021 | 2001 Fillmore St | comply w/ abe program: finding of technical infeasibility. install accessible signage. install new compliant threshold. install warning aon exterior tread.Details
comply w/ abe program: finding of technical infeasibility. install accessible signage. install new compliant threshold. install warning aon exterior tread. | $125 | |
| Oct 29, 2018 | Never finaled issued Oct 2018, no final | 2001 Fillmore St | street space | ||
| Oct 24, 2018 | Never finaled filed Oct 2018, never issued | 2001 Fillmore St | street space | ||
| Sep 24, 2018 | Never finaled issued Sep 2018, no final | 2001 Fillmore St | street space | ||
| Aug 7, 2018 | Completed final sign-off Mar 2019 | 2001 Fillmore St | Boswell Builders | g/f-restaurant remodel and comply w/ complaint 201879512 and interior remodel to (e) restaurant, bathroom, bar area and new interior millwork. replacement of (e) front windows and skylights. maher n/a.Details
g/f-restaurant remodel and comply w/ complaint 201879512 and interior remodel to (e) restaurant, bathroom, bar area and new interior millwork. replacement of (e) front windows and skylights. maher n/a. | $150,000 |
| Jul 27, 2018 | Never finaled issued Jul 2018, no final | 2001 Fillmore St | street space | ||
| Jun 4, 2009 | Never finaled issued Jun 2009, no final | 2001 Fillmore St | International Fire Equip | install u300 hood & duct fire system.Details
install u300 hood & duct fire system. | $3,500 |
| May 4, 2006 | Never finaled issued May 2006, no final | 2001 Fillmore St | street space permit | ||
| Sep 5, 2001 | Expired or cancelled expired Jan 2002 | 2001 Fillmore St | International Commercial Awning, Inc. | install two canvas awnings over store front windowDetails
install two canvas awnings over store front window | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nabi Construction & Engineering Inc (2), Alsterlind Construction Inc., Boswell Builders, International Commercial Awning, Inc., International Fire Equip, T N T Demolition Dba T N T Construction
- Architects
- Brian Milford (2), Daniel Howard, E. B. Min, Javed J. Tharavi, Keith Trotman Kirley
- Engineers
- Javed Tharani
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.