Marc Lindsell
- Listed as
- architect, authorized agent-others, designer
- Firm
- 2m Architecture
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Aug 2026
138 permits since 2000 (architect on 135 permits, authorized agent-others on 3 permits, designer on 1 permit): 92 completed, 13 in progress, 15 never finaled, 18 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 138.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 255 Prospect Av | create (2) new roof dormers. create a new bathroom on 2/f.Details
create (2) new roof dormers. create a new bathroom on 2/f. | $75,000 | |
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 233 Douglass St | to create a new junior adu in the existing ground floor (using the state program).Details
to create a new junior adu in the existing ground floor (using the state program). | $50,000 | |
| Jul 8, 2026 | In progress issued Aug 2026 | 90 Ellsworth St | Pederson Construction Inc | to replace a wood-framed floor above the basement/garage and replace about 100-square feet of concrete slab in an existing storage/utility/laundry room on the 1st floor, and renovate the bathroom on the 2nd/main floor.Details
to replace a wood-framed floor above the basement/garage and replace about 100-square feet of concrete slab in an existing storage/utility/laundry room on the 1st floor, and renovate the bathroom on the 2nd/main floor. | $40,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 1930 33rd Av | Prosper Construction Dev Inc. | add conditioned space on 1st flr (700 sqft) & a (n) bathroom. infill lightwell (50sqft) on 2nd flr. add a (n) interior stairway. relocate kitchen on 1st flr.Details
add conditioned space on 1st flr (700 sqft) & a (n) bathroom. infill lightwell (50sqft) on 2nd flr. add a (n) interior stairway. relocate kitchen on 1st flr. | $175,000 |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 1264 03rd Av | Prosper Construction Dev Inc. | revisoin to bpa#202512242587. new 8x6.5 dormer in 3rd floor bedroom.Details
revisoin to bpa#202512242587. new 8x6.5 dormer in 3rd floor bedroom. | $10,000 |
| Apr 29, 2026 | In progress issued May 2026 | 617 Mississippi St | Perez Construction Llc. | to remodel unit 617 on 3rd floor, including a new kitchen location, renovated bathroom & add a new bathroom.Details
to remodel unit 617 on 3rd floor, including a new kitchen location, renovated bathroom & add a new bathroom. | $75,000 |
| Apr 28, 2026 | Completed final sign-off Sep 2026 | 324 Park St | Pederson Construction Inc | remodel bathroom, new layout for fixtures. change stair balustrade (guardrail). upgrade bath electrical.Details
remodel bathroom, new layout for fixtures. change stair balustrade (guardrail). upgrade bath electrical. | $50,000 |
| Mar 17, 2026 | In progress filed Mar 2026, not yet issued | 1264 03rd Av | Prosper Construction Dev Inc. | revision to permit#202512242587. new 8x8 dormer on 3rd floor for a new bathroom. new bedroom on 3rd floorDetails
revision to permit#202512242587. new 8x8 dormer on 3rd floor for a new bathroom. new bedroom on 3rd floor | $30,000 |
| Dec 24, 2025 | In progress issued Jan 2026 | 1264 03rd Av | Prosper Construction Dev Inc. | to install new heating system (baseboard radiators w/central boiler). interior renovation and replace (e) windows/doors. to comply with nov 202420749.Details
to install new heating system (baseboard radiators w/central boiler). interior renovation and replace (e) windows/doors. to comply with nov 202420749. | $275,000 |
| Dec 15, 2025 | Completed final sign-off Apr 2026 | 1293 28th Av | Prosper Construction Dev Inc. | to add bathroom on third floor.Details
to add bathroom on third floor. | $25,000 |
| Nov 12, 2025 | Completed final sign-off Aug 2026 | 75 Lurline St | to remodel existing kitchen and dining area. to replace existing windows in kind. alum clad wood slider.Details
to remodel existing kitchen and dining area. to replace existing windows in kind. alum clad wood slider. | $75,000 | |
| Nov 10, 2025 | In progress issued May 2026 | 1 Bradford St | Alward Const. Co Inc A Ca Corp | horizontal additions on 1/f & 2/f. vertical addition for new 3/f. create adu on 1/f using local program.Details
horizontal additions on 1/f & 2/f. vertical addition for new 3/f. create adu on 1/f using local program. | $550,000 |
| Sep 4, 2025 | Completed final sign-off Feb 2026 | 48 Sharon St | Pacific Construction | enlarge 1 swing door opening into a large sliding door; bathroom remodeling, upgrade fan, electrical, fxitures and shower pan same layout like to likeDetails
enlarge 1 swing door opening into a large sliding door; bathroom remodeling, upgrade fan, electrical, fxitures and shower pan same layout like to like | $28,960 |
| Aug 29, 2025 | In progress issued Sep 2025 | 99 Anderson St | to legalize existing habitable space on first floorDetails
to legalize existing habitable space on first floor | ||
| Aug 14, 2025 | Completed final sign-off Dec 2025 | 304 Winfield St | Her Construction | new stair and landing, like for like in front of home. street visible. tile installation on new stairs.Details
new stair and landing, like for like in front of home. street visible. tile installation on new stairs. | $21,000 |
| Aug 6, 2025 | In progress filed Aug 2025, not yet issued | 451 Anderson St | horizontal addition at back of house at 1st & 2nd floor & remodel interior stairway. add new skylights in (e) living area & (e) bedroom.Details
horizontal addition at back of house at 1st & 2nd floor & remodel interior stairway. add new skylights in (e) living area & (e) bedroom. | $350,000 | |
| Aug 5, 2025 | Completed final sign-off Nov 2025 | 149 Capistrano Av | Prosper Construction Dev Inc. | refrence 202507100573, renovate e kitchen, add new bath (257 sf)Details
refrence 202507100573, renovate e kitchen, add new bath (257 sf) | $75,000 |
| Jun 6, 2025 | Completed final sign-off Sep 2025 | 1274 Filbert St | Frederic Grasset Design-Build | #2: renovate existing kitchen, breakfast room, and pantry. new kitchen electrical circuits, 3) circuitsDetails
#2: renovate existing kitchen, breakfast room, and pantry. new kitchen electrical circuits, 3) circuits | $50,000 |
| May 8, 2025 | In progress issued Jun 2025 | 170 Northwood Dr | Murphy Construction Llc | to renovate e) 1st/f: remodel e) storage space into a family area, refinish e) bedroom, add a new bedroom, bathroom, & mudroom. to create a new stairway addition to rear of houseDetails
to renovate e) 1st/f: remodel e) storage space into a family area, refinish e) bedroom, add a new bedroom, bathroom, & mudroom. to create a new stairway addition to rear of house | $125,000 |
| Apr 30, 2025 | Completed final sign-off May 2026 | 75 Santa Marina St | L2m Builders | add bathroom on 1st fl and minor interior renovation. renovate bathroom on second fl. replace (e) furnace and ductwork . add air conditioning unitDetails
add bathroom on 1st fl and minor interior renovation. renovate bathroom on second fl. replace (e) furnace and ductwork . add air conditioning unit | $75,000 |
| Apr 10, 2025 | Completed final sign-off Feb 2026 | 30 Perego Tr | Francies Construction Inc | replace (e) gas furnace with (n) air handler and outdoor condenser unit. remodel (e) 3rd fl (no structural work). remodel bathroom & kitchen. replace (e) sliding doors (match size to existing) add new skylights on third floor.Details
replace (e) gas furnace with (n) air handler and outdoor condenser unit. remodel (e) 3rd fl (no structural work). remodel bathroom & kitchen. replace (e) sliding doors (match size to existing) add new skylights on third floor. | $95,000 |
| Feb 4, 2025 | Completed final sign-off Aug 2025 | 351 Richland Av | stair lift to be installed on front stairs.Details
stair lift to be installed on front stairs. | $7,738 | |
| Oct 28, 2024 | In progress issued Mar 2025 | 571 34th Av | Wei Li Construction | 1st flr - infill lightwell with new interior stair. -add new conditional space within garage - add new living space under existing second flr structure. second floor - infill lightwell - remodel interior space -add elevated deck at rear year with exterior stairs to grade.Details
1st flr - infill lightwell with new interior stair. -add new conditional space within garage - add new living space under existing second flr structure. second floor - infill lightwell - remodel interior space -add elevated deck at rear year with exterior stairs to grade. | $176,000 |
| Sep 12, 2024 | Completed final sign-off Mar 2025 | 211 Anderson St | Frederic Grasset Design-Build | replace existing siding at the rear. add (n) sheathing and insulation. replace (e) windows at the rear of the house. no change to front facadeDetails
replace existing siding at the rear. add (n) sheathing and insulation. replace (e) windows at the rear of the house. no change to front facade | $5,000 |
| Aug 27, 2024 | Completed final sign-off Mar 2025 | 501 Gates St | Quality Home Builders Construction Inc | revision to pa 202210285466 to repair an existing driveway and footing as required by field inspector (not visible from street)Details
revision to pa 202210285466 to repair an existing driveway and footing as required by field inspector (not visible from street) | $1,000 |
| Jul 23, 2024 | Completed final sign-off Nov 2024 | 272 Missouri St | Pederson Construction Inc | revision to pa# 2024-0617-4601 replace existing steel & glass guardrail with new steel & glass guardrail 42" highDetails
revision to pa# 2024-0617-4601 replace existing steel & glass guardrail with new steel & glass guardrail 42" high | $20,000 |
| Jul 15, 2024 | Expired or cancelled expired May 2026 | 4055 25th St | Francies Construction Inc | revision to permit 202310199063. remodel existing kitchen and laundry room on 1/f.Details
revision to permit 202310199063. remodel existing kitchen and laundry room on 1/f. | $15,000 |
| Mar 20, 2024 | Completed final sign-off May 2024 | 615 Mississippi St | Perez Construction Llc. | demo existing and build new one on second flr. approx. 100 sq. ft areaDetails
demo existing and build new one on second flr. approx. 100 sq. ft area | $7,500 |
| Mar 20, 2024 | Completed final sign-off Mar 2025 | 561 Banks St | Frederic Grasset Design-Build | revision to pa 202308094034 to replace (e) brick stair base with (n) concrete stair baseDetails
revision to pa 202308094034 to replace (e) brick stair base with (n) concrete stair base | $600 |
| Feb 26, 2024 | Completed final sign-off Jun 2024 | 1987 44th Av | Pederson Construction Inc | revision to permit# 202212148321: replacing (e) gas furnace with new.Details
revision to permit# 202212148321: replacing (e) gas furnace with new. | |
| Feb 12, 2024 | Completed final sign-off Jun 2024 | 106 Bennington St | Ayala Builder's And Company Inc | to renovate existing kitche, install new sliding door in dining area.Details
to renovate existing kitche, install new sliding door in dining area. | $39,500 |
| Feb 7, 2024 | Completed final sign-off Sep 2025 | 707 Cortland Av | Edri Construction Inc *See Notes* | to provide plans for all work described in nov# 202312732. to renovate an (e) commercial space. to upgrade the (e) front entry to accessible standard. change of use to trade office.Details
to provide plans for all work described in nov# 202312732. to renovate an (e) commercial space. to upgrade the (e) front entry to accessible standard. change of use to trade office. | $25,000 |
| Nov 22, 2023 | Completed final sign-off Sep 2024 | 633 San Jose Av | kitchen remodel, move doorway, close wall, redo all electrical workDetails
kitchen remodel, move doorway, close wall, redo all electrical work | $40,000 | |
| Oct 19, 2023 | Expired or cancelled expired Apr 2026 | 4057 25th St | Francies Construction Inc | to legalize existing dwelling unit (4057a) on the first floor. to remove an interior stair in order to separate 4057a from second floor unit 4055. sprinkle the legalized unit as per cbc 903.3 and to comply with current codes, make necessary upgrades to the unitDetails
to legalize existing dwelling unit (4057a) on the first floor. to remove an interior stair in order to separate 4057a from second floor unit 4055. sprinkle the legalized unit as per cbc 903.3 and to comply with current codes, make necessary upgrades to the unit | $50,000 |
| Oct 19, 2023 | Completed final sign-off May 2024 | 615 Mississippi St | Perez Construction Llc. | to repair in kind, existing front porch, including (<50%) dry rot framing, walking surface, stucco clading revision to 202307031376Details
to repair in kind, existing front porch, including (<50%) dry rot framing, walking surface, stucco clading revision to 202307031376 | $2,500 |
| Sep 7, 2023 | Completed final sign-off Jun 2024 | 615 Mississippi St | Perez Construction Llc. | revision to pa# 202307031376; to provide voluntary strengthening to the (e) structureDetails
revision to pa# 202307031376; to provide voluntary strengthening to the (e) structure | $2,500 |
| Aug 9, 2023 | Completed final sign-off Mar 2025 | 561 Banks St | Frederic Grasset Design-Build | repair existing front stairs less than 50%, replace existing front bay with a new bay, replace the existing front plasterDetails
repair existing front stairs less than 50%, replace existing front bay with a new bay, replace the existing front plaster | $10,000 |
| Jul 3, 2023 | Completed final sign-off Jun 2024 | 615 Mississippi St | Perez Construction Llc. | remodel (e) kitchen and bathroom, add new half bathroom. replace most windows on 2/f & 3/f. new water heating system, both unit, relocated to garage.Details
remodel (e) kitchen and bathroom, add new half bathroom. replace most windows on 2/f & 3/f. new water heating system, both unit, relocated to garage. | $150,000 |
| Jun 20, 2023 | Completed final sign-off Jul 2024 | 2985 24th Av | Art Of Construction Inc | revision to pa# 202212087909. select foundation upgrades.Details
revision to pa# 202212087909. select foundation upgrades. | $4,000 |
| Jun 12, 2023 | Completed final sign-off Jul 2024 | 245 Sagamore St | Frederic Grasset Design-Build | to create a new junior adu on the first floor (in existing interior space) per state ordinance gcs #65852.2(a) thru (d). to remodel an existing kitchen and bath on the second floor. to create a new rear yard elevated deck and spiral stair to grade.Details
to create a new junior adu on the first floor (in existing interior space) per state ordinance gcs #65852.2(a) thru (d). to remodel an existing kitchen and bath on the second floor. to create a new rear yard elevated deck and spiral stair to grade. | $150,000 |
| Jun 12, 2023 | Completed final sign-off Aug 2023 | 138 Whitney St | Christopher Wells Construction Inc. | add 2 new skylightsDetails
add 2 new skylights | $2,500 |
| May 25, 2023 | Expired or cancelled withdrawn Nov 2023 | 71 Bradford St | to renovate an existing sfr including new kitchen & bathroom, to create new living space in an existing ground floor including 3 bedrooms & 1 bathroom, to upgrade hvac, water heating & electrical systemsDetails
to renovate an existing sfr including new kitchen & bathroom, to create new living space in an existing ground floor including 3 bedrooms & 1 bathroom, to upgrade hvac, water heating & electrical systems | $150,000 | |
| May 3, 2023 | Completed final sign-off Aug 2023 | 434 Naples St | rebuild (e) rear exterior stairway, same design as (e), in-kind.Details
rebuild (e) rear exterior stairway, same design as (e), in-kind. | $5,000 | |
| Jan 20, 2023 | Never finaled filed Jan 2023, never issued | 535 Stevenson St | to comply with 2022-000220enf - to correct the record to show accessary dwelling use under planning code 240.Details
to comply with 2022-000220enf - to correct the record to show accessary dwelling use under planning code 240. | ||
| Jan 18, 2023 | Expired or cancelled cancelled Jan 2026 | 101 Montcalm St | add an elevated deck to side of e single family res. add 1 exterior door and spiral stair. add a platform (deck) at lower level.Details
add an elevated deck to side of e single family res. add 1 exterior door and spiral stair. add a platform (deck) at lower level. | ||
| Dec 15, 2022 | Completed final sign-off Feb 2025 | 2727 41st Av | Salgo Constructions | to create new bedroom, new master bedroom, 2 baths on existing 1st fl. infill under existing permitted structure. seismic upgrade to (e) first floorDetails
to create new bedroom, new master bedroom, 2 baths on existing 1st fl. infill under existing permitted structure. seismic upgrade to (e) first floor | $150,000 |
| Dec 14, 2022 | Completed final sign-off Jun 2024 | 1987 44th Av | Pederson Construction Inc | 1/f: to create (2) new bedrooms and a new bathroom in an existing undeveloped space. to add a new skylight. to replace the hvac systemDetails
1/f: to create (2) new bedrooms and a new bathroom in an existing undeveloped space. to add a new skylight. to replace the hvac system | $90,000 |
| Dec 14, 2022 | Completed final sign-off Nov 2024 | 70 Montezuma St | A L V Construction Inc | to reconstruct an existing dryrot deck and provide a new code required firewall.Details
to reconstruct an existing dryrot deck and provide a new code required firewall. | $25,000 |
| Dec 8, 2022 | Completed final sign-off Jul 2024 | 2985 24th Av | alterations & addition to existing 2-story sfr, including : windows replacement, new internal stair, bathroom & kitchen renovations alons w/ certain foundation repair and bldg system upgrade. no vertical or horizontal additions to e bldg. 1st/ flr addition inside e garage space.Details
alterations & addition to existing 2-story sfr, including : windows replacement, new internal stair, bathroom & kitchen renovations alons w/ certain foundation repair and bldg system upgrade. no vertical or horizontal additions to e bldg. 1st/ flr addition inside e garage space. | $150,000 | |
| Dec 8, 2022 | Completed final sign-off Sep 2023 | 937 Delano Av | Perez Construction Llc. | infill an (e) interior atrium. renovate a kitchen complete. install new skylights.Details
infill an (e) interior atrium. renovate a kitchen complete. install new skylights. | $95,000 |
| Oct 28, 2022 | Never finaled issued Oct 2022, no final | 4052 18th St | revision to 202207198862 to add 3 concrete stem walls to permitted matslab., add 1 interior shear wallDetails
revision to 202207198862 to add 3 concrete stem walls to permitted matslab., add 1 interior shear wall | $1,000 | |
| Aug 17, 2022 | Never finaled issued Aug 2022, no final | 437 Ellsworth St | Milo Construction | revision to bpa 202203301194. extend deck platform and add steps.Details
revision to bpa 202203301194. extend deck platform and add steps. | $750 |
| May 18, 2022 | Never finaled issued Aug 2023, no final | 1366 36th Av | Dotto Construction Co | to renovate the (e) second and third flr of the main residence complete. to add new bedroom and a bathroom on the third flr addition. legalize the (e) first flr dwelling unit under separate application#202205103951 sDetails
to renovate the (e) second and third flr of the main residence complete. to add new bedroom and a bathroom on the third flr addition. legalize the (e) first flr dwelling unit under separate application#202205103951 s | $275,000 |
| May 10, 2022 | Never finaled issued Aug 2023, no final | 1366 36th Av | Dotto Construction Co | to respond to nov 2020-004900enf and legalize the (e) first flr dwelling unit.Details
to respond to nov 2020-004900enf and legalize the (e) first flr dwelling unit. | $75,000 |
| May 2, 2022 | Completed final sign-off Jul 2022 | 4052 18th St | Qse Construction | to restore the existing first floor level to its original use as a dwelling. (no other changes) see 2022-00146 prvDetails
to restore the existing first floor level to its original use as a dwelling. (no other changes) see 2022-00146 prv | |
| Mar 30, 2022 | Completed final sign-off Sep 2022 | 437 Ellsworth St | Milo Construction | remove sliding door + replace with sliding egress window. install a new wood deck platform covering an existing step well.Details
remove sliding door + replace with sliding egress window. install a new wood deck platform covering an existing step well. | $5,000 |
| Mar 16, 2022 | Completed final sign-off May 2023 | 182 Flood Av | Perez Construction Llc. | infill addition below an existing stair landing.Details
infill addition below an existing stair landing. | $3,500 |
| Mar 3, 2022 | Completed final sign-off Feb 2024 | 164 Bonview St | Robert Howard Builders Inc. | to create a new master bedroom and bath in an extg basement space. to create a new interior stairway connecting the basement to the main level.Details
to create a new master bedroom and bath in an extg basement space. to create a new interior stairway connecting the basement to the main level. | $125,000 |
| Feb 7, 2022 | Completed final sign-off Jan 2024 | 28 Gladys St | repair an (e) dry-rot rear yard deck (less than 50% replacement). replace an (e) dryrot rear stair. create (n) 2nd story rear yard deck. repair (e) dryrot siding at rear elevation.Details
repair an (e) dry-rot rear yard deck (less than 50% replacement). replace an (e) dryrot rear stair. create (n) 2nd story rear yard deck. repair (e) dryrot siding at rear elevation. | $15,000 | |
| Feb 1, 2022 | Completed final sign-off May 2023 | 182 Flood Av | Perez Construction Llc. | create (n) family room & bathroom in (e) garage space. to infill under an (e) 2/f space.Details
create (n) family room & bathroom in (e) garage space. to infill under an (e) 2/f space. | $150,000 |
| Jan 26, 2022 | Never finaled issued Mar 2022, no final | 725 Banks St | to remove an (e) wall to connect two rooms.Details
to remove an (e) wall to connect two rooms. | $8,000 | |
| Aug 10, 2021 | Completed final sign-off Jun 2022 | 585 Buena Vista West Av | Pederson Construction Inc | revision to 2021 0303 5767. delete scope from project: (e) 4th fl bath to remain existing. 4th fl rear deck framing to remainDetails
revision to 2021 0303 5767. delete scope from project: (e) 4th fl bath to remain existing. 4th fl rear deck framing to remain | |
| Mar 3, 2021 | Expired or cancelled cancelled Jan 2026 | 3181 Mission St | to create a new accessible restroom and office in an existing commercial space.Details
to create a new accessible restroom and office in an existing commercial space. | $25,000 | |
| Mar 3, 2021 | Completed final sign-off Jun 2022 | 585 Buena Vista West Av | Pederson Construction Inc | replace (e) dryrot roof decking and framing. renovate an (e) bathroom. provide a new mini split hvac system to the upper floor.Details
replace (e) dryrot roof decking and framing. renovate an (e) bathroom. provide a new mini split hvac system to the upper floor. | $75,000 |
| Nov 21, 2020 | Completed final sign-off Mar 2021 | 336 Prospect Av | Frederic Grasset Design-Build | engineering revision to pa# 202007200519. add foundation replacement & foundation location adjustment; revise attic access location.Details
engineering revision to pa# 202007200519. add foundation replacement & foundation location adjustment; revise attic access location. | $12,000 |
| Nov 5, 2020 | Completed final sign-off Apr 2021 | 164 Bonview St | Robert Howard Builders Inc. | replace (e) dry-rot damanged rear stair with new code compliant stair.Details
replace (e) dry-rot damanged rear stair with new code compliant stair. | $15,000 |
| Oct 17, 2020 | Completed final sign-off Apr 2021 | 92 Santa Marina St | Tapia Construction & Restoration | remove 2 interior walls. replace kitchen cabinets equipment & finishes. install beams per plan.Details
remove 2 interior walls. replace kitchen cabinets equipment & finishes. install beams per plan. | $15,000 |
| Oct 7, 2020 | Never finaled filed Oct 2020, never issued | 1109 De Haro St | renovations to interior of existing two story dwelling plus roof deck and unconditioned roof pavilion/penthouse. interior renovations to include modifications to existing kitchen, removal of one bathroom and bedroom, and installation of a new bathroom.Details
renovations to interior of existing two story dwelling plus roof deck and unconditioned roof pavilion/penthouse. interior renovations to include modifications to existing kitchen, removal of one bathroom and bedroom, and installation of a new bathroom. | $360,215 | |
| Sep 26, 2020 | Never finaled issued Jul 2022, no final | 434 Naples St | add a new rear yard addition for a stairway connecting upper and lower levels and to add a new rear yard deck, to an existing 2-story, single family residenceDetails
add a new rear yard addition for a stairway connecting upper and lower levels and to add a new rear yard deck, to an existing 2-story, single family residence | $125,000 | |
| Jul 20, 2020 | Completed final sign-off Mar 2021 | 336 Prospect Av | Frederic Grasset Design-Build | renovate an (e) basement to create 2 (n) bedrooms & 1 bathroom. renovate (e) bathroom.Details
renovate an (e) basement to create 2 (n) bedrooms & 1 bathroom. renovate (e) bathroom. | $125,000 |
| Feb 13, 2020 | Completed final sign-off Apr 2023 | 316 San Carlos St | Frederic Grasset Design-Build | to construct a new 3rd story addition. consisting of 3 bedrooms and 2 baths.Details
to construct a new 3rd story addition. consisting of 3 bedrooms and 2 baths. | $275,000 |
| Oct 10, 2019 | Completed final sign-off Feb 2020 | 95 Arago St | John O'donovan | revision to app#201701257910 to relocate proposed new bathroomDetails
revision to app#201701257910 to relocate proposed new bathroom | |
| Oct 2, 2019 | Expired or cancelled withdrawn Feb 2020 | 77 Anderson St | replace stucco portion of street facade with wood panelsDetails
replace stucco portion of street facade with wood panels | $20,000 | |
| Aug 12, 2019 | Expired or cancelled withdrawn Jan 2020 | 733 Castro St | expand an (e) 1st story with (n) storage, expand an (e) 2nd fl kitchen, remodel an (e) 3rd story bath & create a (n) bath, create a (n) roof deck & external stairs.Details
expand an (e) 1st story with (n) storage, expand an (e) 2nd fl kitchen, remodel an (e) 3rd story bath & create a (n) bath, create a (n) roof deck & external stairs. | $175,000 | |
| Aug 12, 2019 | Completed final sign-off Jun 2020 | 77 Anderson St | Wallace Remodeling,Inc., Francies Construction Inc | replace siding at side of building & at upper story on rear. replace doors & windows at rear, replace 2 (e) skylights in-kind, reroof house.Details
replace siding at side of building & at upper story on rear. replace doors & windows at rear, replace 2 (e) skylights in-kind, reroof house. | $25,000 |
| Jun 21, 2019 | Completed final sign-off Aug 2024 | 9 Roscoe St | G B U Construction Development | horizontal at 3/f. interior remodelDetails
horizontal at 3/f. interior remodel | $150,000 |
| Jun 14, 2019 | Expired or cancelled cancelled Jan 2026 | 143 Willard North St | to create a new 5'-6" high glass windscreen & guardrail at an existing 4th stor rear yard roof deckDetails
to create a new 5'-6" high glass windscreen & guardrail at an existing 4th stor rear yard roof deck | $10,000 | |
| May 16, 2019 | Completed final sign-off Jul 2019 | 77 Anderson St | to comply with planning enforcement case #2019002189enf. to legalize unauthorized alterations to the front facade of bldg and front yard.Details
to comply with planning enforcement case #2019002189enf. to legalize unauthorized alterations to the front facade of bldg and front yard. | $10,000 | |
| Dec 4, 2018 | Completed final sign-off Feb 2019 | 33 Saturn St | Murphymckenna Construction | revision to pa #2018059525. to connect with (e) first floor & 2nd floor of the same residential unit with new spiral stairway.Details
revision to pa #2018059525. to connect with (e) first floor & 2nd floor of the same residential unit with new spiral stairway. | |
| Nov 16, 2018 | Expired or cancelled withdrawn Dec 2018 | 33 Saturn St | revision to pa 2018-0518-9525 reconfigure mudroom/laundryDetails
revision to pa 2018-0518-9525 reconfigure mudroom/laundry | ||
| Oct 3, 2018 | Expired or cancelled withdrawn Apr 2019 | 77 Anderson St | replace failed stuco at street facade with rain screen panels. replace t-iii siding at east (rear)& south (side) with horiz plank. relocate 2 windows at rear. enlarge 1 window to slide door. add deck under 2nd floor overhang.Details
replace failed stuco at street facade with rain screen panels. replace t-iii siding at east (rear)& south (side) with horiz plank. relocate 2 windows at rear. enlarge 1 window to slide door. add deck under 2nd floor overhang. | $125,000 | |
| Aug 13, 2018 | Never finaled issued Dec 2019, no final | 1483 Funston Av | expand (e) 3rd story consisting of (2)(n) bedrooms & a bathroom.Details
expand (e) 3rd story consisting of (2)(n) bedrooms & a bathroom. | $125,000 | |
| Jun 14, 2018 | Completed final sign-off Apr 2019 | 629 Crescent Av | Milo Construction | replace exterior stucco at street facade. replace partial wood siding w/stucco at street facade. repalce 4 (e) windows in (e) openings. replace shingles on canopy. replace stair threads. maher n/aDetails
replace exterior stucco at street facade. replace partial wood siding w/stucco at street facade. repalce 4 (e) windows in (e) openings. replace shingles on canopy. replace stair threads. maher n/a | $20,000 |
| May 18, 2018 | Completed final sign-off Feb 2019 | 33 Saturn St | Murphymckenna Construction | remodel e 1st fl living room and bath to create a new bedroom from living rm space to replace (3) e rear windows + 1 light well window to connect 1st and 2nd floors with a new spiral stairDetails
remodel e 1st fl living room and bath to create a new bedroom from living rm space to replace (3) e rear windows + 1 light well window to connect 1st and 2nd floors with a new spiral stair | $25,000 |
| May 11, 2018 | Completed final sign-off Feb 2019 | 33 Saturn St | Murphymckenna Construction | remodel (e) kitchen, 2 bathrooms and bedroom, exhaust fans. replace several (e) windows at lightwells and rear of building.Details
remodel (e) kitchen, 2 bathrooms and bedroom, exhaust fans. replace several (e) windows at lightwells and rear of building. | $50,000 |
| Apr 26, 2018 | Expired or cancelled withdrawn May 2018 | 33 Saturn St | remodel (e) kitchen, 3 bathrooms and 1 bedroom, add new spiral stair to lower floor. replace several (e) windows at light wells and rear o f building , add bedroom on 1st floorDetails
remodel (e) kitchen, 3 bathrooms and 1 bedroom, add new spiral stair to lower floor. replace several (e) windows at light wells and rear o f building , add bedroom on 1st floor | $95,000 | |
| Mar 12, 2018 | Completed final sign-off Feb 2019 | 44 Prospect Av | A Plus Builders | to remodel an extg sitting room to a new bedroom. to create a new bathroom. to replace a window on the front facade in kind.Details
to remodel an extg sitting room to a new bedroom. to create a new bathroom. to replace a window on the front facade in kind. | $12,000 |
| Jan 31, 2018 | Completed final sign-off Mar 2023 | 281 Nevada St | Barahona Brothers Construction Inc. | to construct a new 2-story front yard addition to an (e) house. scope includes a new 1-car garage, family rm, (2) bdrms & (2) bathrms. variance app #2017-006809 var.Details
to construct a new 2-story front yard addition to an (e) house. scope includes a new 1-car garage, family rm, (2) bdrms & (2) bathrms. variance app #2017-006809 var. | $250,000 |
| Jan 31, 2018 | Completed final sign-off Jul 2022 | 2207 24th Av | Headlands Construction Co | to create a new enclosed entry & covered porch in the front yard. variance app #2017-010226 var.Details
to create a new enclosed entry & covered porch in the front yard. variance app #2017-010226 var. | $8,500 |
| Jan 30, 2018 | Completed final sign-off May 2018 | 143 Willard North St | Lokman Construction | renovate existing bathroom including change of (e) layout, window replacement, electical & plumbing works.Details
renovate existing bathroom including change of (e) layout, window replacement, electical & plumbing works. | $10,000 |
| Jan 22, 2018 | Completed final sign-off Apr 2019 | 259 Tocoloma Av | Barahona Brothers Construction Inc. | to remodel and enlarge an extg ground floor space to create a new master suite and family room.Details
to remodel and enlarge an extg ground floor space to create a new master suite and family room. | $65,000 |
| Nov 22, 2017 | Completed final sign-off Mar 2020 | 232 Miguel St | Wallace Remodeling,Inc. | interior renovation, bathroom addition and rear yard horizontal addition.Details
interior renovation, bathroom addition and rear yard horizontal addition. | $95,000 |
| Nov 8, 2017 | Completed final sign-off Feb 2021 | 627 Anderson St | Tapia Construction & Restoration | to expand (e) attic bedroom and add a (n) bath. to infill a corner of (e) main floor. to remove a non-compliant stairway. to expand (e) basement level.Details
to expand (e) attic bedroom and add a (n) bath. to infill a corner of (e) main floor. to remove a non-compliant stairway. to expand (e) basement level. | $125,000 |
| Oct 18, 2017 | Never finaled issued Dec 2017, no final | 1591 Jackson St | Tomasz R Podsiadly Construction | #17 - kitchen & two bathrooms remodeling.Details
#17 - kitchen & two bathrooms remodeling. | $180,000 |
| Apr 27, 2017 | Completed final sign-off Jul 2018 | 427 Joost Av | Beyond The Horizon Construction, Munoz Construction | to correct items in nov 201650053 per unit legalization ordinance #43-14, legalizing an (e) ground floor unit, work comprises legalize existing kitchen and door to an existing space permitted by bpa #200110039853. convert playroom to bedroom.Details
to correct items in nov 201650053 per unit legalization ordinance #43-14, legalizing an (e) ground floor unit, work comprises legalize existing kitchen and door to an existing space permitted by bpa #200110039853. convert playroom to bedroom. | $4,500 |
| Apr 12, 2017 | Expired or cancelled cancelled Jan 2026 | 1206 40th Av | to replace an existing perimeter footing and slab at a rear bedroom; replace (e) windows at rear bedrromDetails
to replace an existing perimeter footing and slab at a rear bedroom; replace (e) windows at rear bedrrom | $15,000 | |
| Mar 9, 2017 | Never finaled issued Sep 2017, no final | 2427 03rd St | Collier-Ostrom Enterprise | expand an (e) restaurant kitchen into an adajacent space maher naDetails
expand an (e) restaurant kitchen into an adajacent space maher na | $7,500 |
| Mar 9, 2017 | Completed final sign-off Oct 2017 | 3814 24th St | Tritone Construction | unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms.Details
unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms. | $55,000 |
| Feb 7, 2017 | Completed final sign-off Sep 2017 | 717 Corbett Av | to remove an (e) bathroom. to remove 2 property line windows and replace woth 1 new fixed window 45 min fire rated windowDetails
to remove an (e) bathroom. to remove 2 property line windows and replace woth 1 new fixed window 45 min fire rated window | $30,000 | |
| Jan 25, 2017 | Expired or cancelled expired Feb 2020 | 95 Arago St | John O'donovan | to construct a new upper story addition to an existing single family residence consisting of a new bedroom and bath.Details
to construct a new upper story addition to an existing single family residence consisting of a new bedroom and bath. | $65,000 |