Tritone Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Aug 2026
- Last 24 months
- 6 permits filed
52 permits since 2000: 34 completed, 7 in progress, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Aug 2026 | 335 Sweeny St | remodel (1) kitchen in kind. remodelincludes eletrical redo new panle, upgrade kitchen circuits (7 total) replace in-kind cabinets/resuse (e) countertops and perform necessary plumbing.Details
remodel (1) kitchen in kind. remodelincludes eletrical redo new panle, upgrade kitchen circuits (7 total) replace in-kind cabinets/resuse (e) countertops and perform necessary plumbing. | $15,000 |
| Jan 22, 2026 | In progress issued Mar 2026 | 1785 Fulton St | comply with nov 202649217 addition of hanging ceiling, plexiglass wall, plywood soffit over railing. no plumbing fixtures.Details
comply with nov 202649217 addition of hanging ceiling, plexiglass wall, plywood soffit over railing. no plumbing fixtures. | $54,000 |
| Oct 10, 2025 | In progress issued Oct 2025 | 1815 Felton St | removing approx 400 sqft of shingle siding. replace with new shingle siding in kind. add vapor barrier siding of building. not street visible.Details
removing approx 400 sqft of shingle siding. replace with new shingle siding in kind. add vapor barrier siding of building. not street visible. | $10,000 |
| Jul 14, 2025 | In progress filed Jul 2025, not yet issued | 88 King St | unit #121: bathroom remodel replace everything in kind. 1 new shower valve, 1 new tub, 1 new toilet, replace (e) lights and fan w/ new. remove and replace kitchen cabinets new countertop.Details
unit #121: bathroom remodel replace everything in kind. 1 new shower valve, 1 new tub, 1 new toilet, replace (e) lights and fan w/ new. remove and replace kitchen cabinets new countertop. | $20,000 |
| Jan 31, 2025 | In progress issued Jun 2025 | 25 Moulton St | 2nd & 3rd fl: remodel (e) kitchen area, to swap location of the living & bedroom. to remodel one full bath & add one full bathroom. add washer and dryer at the (n) living space. remove (e) fireplaceDetails
2nd & 3rd fl: remodel (e) kitchen area, to swap location of the living & bedroom. to remodel one full bath & add one full bathroom. add washer and dryer at the (n) living space. remove (e) fireplace | $70,000 |
| Nov 7, 2024 | Completed final sign-off Jan 2025 | 73 Idora Av | install 1 (n) deck with hot tub located at rear per plans. install 2 (n) doors, 1 outlet with shut off valvle. 2 (n) gfci outlets exterior. 1 (n) subpanel in garage and 1 outlet for ev charger, 1 (n) hose bib at deck levelDetails
install 1 (n) deck with hot tub located at rear per plans. install 2 (n) doors, 1 outlet with shut off valvle. 2 (n) gfci outlets exterior. 1 (n) subpanel in garage and 1 outlet for ev charger, 1 (n) hose bib at deck level | $20,000 |
| Aug 2, 2024 | Completed final sign-off May 2025 | 145 San Juan Av | remodel one bathroom, replace 1 shower pan in kind, repair dryrot to comply with nov#202420330 item added to pa#202404190362Details
remodel one bathroom, replace 1 shower pan in kind, repair dryrot to comply with nov#202420330 item added to pa#202404190362 | |
| Apr 19, 2024 | Completed final sign-off Aug 2024 | 145 San Juan Av | to comply with nov #202420330, items #1-10: replace garden window in kind- replace or repair 3 windows in bay window in kind- replace door to balcony in kind. repair handrail.Details
to comply with nov #202420330, items #1-10: replace garden window in kind- replace or repair 3 windows in bay window in kind- replace door to balcony in kind. repair handrail. | $5,000 |
| Dec 8, 2023 | In progress issued Dec 2023 | 151 Maywood Dr | rev to pa# 2023-1031-9871; replace (1) skylight in hallway and (1) sky light in bathroom in-kind with new, remove (1) sky light in kitchen and replace with new centered at room, remove (3) doors in non load bearing walls, replace with pocket doorsDetails
rev to pa# 2023-1031-9871; replace (1) skylight in hallway and (1) sky light in bathroom in-kind with new, remove (1) sky light in kitchen and replace with new centered at room, remove (3) doors in non load bearing walls, replace with pocket doors | $4,000 |
| Oct 31, 2023 | In progress issued Oct 2023 | 151 Maywood Dr | remodel 1 kitchen; 2 bathroom in kind. kitchen: counter top, new electrical & plumbing fixture. bathrooms: eletric & plumbing upgrade, new fixtures replace in kindDetails
remodel 1 kitchen; 2 bathroom in kind. kitchen: counter top, new electrical & plumbing fixture. bathrooms: eletric & plumbing upgrade, new fixtures replace in kind | $50,000 |
| Jan 6, 2023 | Completed final sign-off Apr 2023 | 601 Van Ness Av | unit #75:add 6 additional led can lights in living room, resurfes all surfaces in master bathroom, install new shower valve in extg tub shower enclosure. replace one tub in guest bathroom, replace one shower valve in guest bthrm. retile guest bathrm tub surround & floor/paintDetails
unit #75:add 6 additional led can lights in living room, resurfes all surfaces in master bathroom, install new shower valve in extg tub shower enclosure. replace one tub in guest bathroom, replace one shower valve in guest bthrm. retile guest bathrm tub surround & floor/paint | $15,000 |
| Aug 23, 2022 | Completed final sign-off Aug 2025 | 88 King St | demo 2 bathtub shower combo's. build two showers in existing space, replace tile, replace toilets. add 4 led light in each bathroom run one new electrical line from existing gfci to toilet locatioon for bidet.Details
demo 2 bathtub shower combo's. build two showers in existing space, replace tile, replace toilets. add 4 led light in each bathroom run one new electrical line from existing gfci to toilet locatioon for bidet. | $15,000 |
| Dec 17, 2021 | Never finaled issued Dec 2021, no final | 88 King St | bathroom remodel - remove tub replace with new shower - new shower valve, new tile. kitchen upgrade with new cabinets in kind. replace existing bedroom doors with new, replace powder room vanity in kind. replace existing lights with new and 1 new pocket door.Details
bathroom remodel - remove tub replace with new shower - new shower valve, new tile. kitchen upgrade with new cabinets in kind. replace existing bedroom doors with new, replace powder room vanity in kind. replace existing lights with new and 1 new pocket door. | $50,000 |
| Apr 14, 2021 | Never finaled issued Jun 2021, no final | 73 Idora Av | demo a wall between kitchen & living room.Details
demo a wall between kitchen & living room. | $4,000 |
| Jan 9, 2020 | Completed final sign-off Feb 2021 | 55 Santa Paula Av | removal of lath and plaster in key locations to expose framing. living room celing, partition wall, kitchen ceiling & partititon wall and bathroom ceiling and walls. lath and plaster to be replaced after discovery.Details
removal of lath and plaster in key locations to expose framing. living room celing, partition wall, kitchen ceiling & partititon wall and bathroom ceiling and walls. lath and plaster to be replaced after discovery. | $2,000 |
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 266 Gates St | convert partially enclose rear porch to conditioned space. extend upper deck over (e) lower roof.Details
convert partially enclose rear porch to conditioned space. extend upper deck over (e) lower roof. | $100,000 |
| Feb 1, 2018 | Never finaled issued Feb 2018, no final | 266 Gates St | bathroom remodel. no reconfiguration. bring electrical to code.Details
bathroom remodel. no reconfiguration. bring electrical to code. | $20,000 |
| Jan 23, 2018 | Never finaled issued Jan 2018, no final | 574 Castro St | remodel 1 bathroom to (e) pa#2017-1211-6140 in-kind.Details
remodel 1 bathroom to (e) pa#2017-1211-6140 in-kind. | $12,000 |
| Dec 11, 2017 | Never finaled issued Dec 2017, no final | 574 Castro St | remodel kitchen: new cabinets, new electrical, plumbing to remain in same location. refinish floorsDetails
remodel kitchen: new cabinets, new electrical, plumbing to remain in same location. refinish floors | $20,000 |
| Aug 8, 2017 | Never finaled issued Aug 2017, no final | 922 Post St | to comply with complaint numbers: 201773502 and 200922469. replacing (20) hollow core doors to fire rated doors.Details
to comply with complaint numbers: 201773502 and 200922469. replacing (20) hollow core doors to fire rated doors. | $9,400 |
| Aug 3, 2017 | Completed final sign-off Aug 2017 | 851 27th St | to comply w/nov #201792221 - replacing existing window in front & sliding door in front off of balcony with larger window & sliding doors.Details
to comply w/nov #201792221 - replacing existing window in front & sliding door in front off of balcony with larger window & sliding doors. | $10,000 |
| Mar 31, 2017 | Completed final sign-off Jun 2017 | 851 27th St | revision to (e) pa#201611152777, convert (e) playroom into bedroom, add bathroom to bedroom downstairs (shower, toilet & sink).Details
revision to (e) pa#201611152777, convert (e) playroom into bedroom, add bathroom to bedroom downstairs (shower, toilet & sink). | $12,500 |
| Mar 9, 2017 | Completed final sign-off Oct 2017 | 3814 24th St | unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms.Details
unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms. | $55,000 |
| Jan 17, 2017 | Completed final sign-off Jul 2017 | 1473 Waller St | create opening in (e) bearing wall. remove portion of (e) partition. kitchen remodel. bath remodel. fill-in various partition wall openings. open various partition wallsDetails
create opening in (e) bearing wall. remove portion of (e) partition. kitchen remodel. bath remodel. fill-in various partition wall openings. open various partition walls | $60,000 |
| Nov 15, 2016 | Completed final sign-off Jun 2017 | 851 27th St | remove 2 walls, add one staircase glass railing(replacing extg half wall). add 2 skylights(less than 75 sq ft). replace extg french door with sliding door(rear of house same opening not visible from the street). update kitchen cabinets, main appliances.Details
remove 2 walls, add one staircase glass railing(replacing extg half wall). add 2 skylights(less than 75 sq ft). replace extg french door with sliding door(rear of house same opening not visible from the street). update kitchen cabinets, main appliances. | $31,360 |
| May 12, 2016 | Completed final sign-off Aug 2016 | 2304 Washington St | #200- removal of non bearing partition walls for master bathroom, remodel & convert (e) study into bedroom, interior remodel of bathroom. n/a ordinance #155-13Details
#200- removal of non bearing partition walls for master bathroom, remodel & convert (e) study into bedroom, interior remodel of bathroom. n/a ordinance #155-13 | $20,000 |
| May 5, 2016 | Completed final sign-off Sep 2016 | 255 Berry St | unit #107: selective demo of non bearing partition walls and new partitions to create office space(media rm). maher naDetails
unit #107: selective demo of non bearing partition walls and new partitions to create office space(media rm). maher na | $10,000 |
| Feb 8, 2016 | Completed final sign-off Dec 2016 | 301 Madison St | floor 2: remodel existing kitchen (new island) & bath. enlarge opening between kitchen & living room to 10'-3" wide. replace swing door in bathroom with new pocket door. remove existing skylight in kitchen (replace with new) in new opening. replace e 2x2 window with new 2x4 window facing felton stDetails
floor 2: remodel existing kitchen (new island) & bath. enlarge opening between kitchen & living room to 10'-3" wide. replace swing door in bathroom with new pocket door. remove existing skylight in kitchen (replace with new) in new opening. replace e 2x2 window with new 2x4 window facing felton st | $12,000 |
| May 27, 2015 | Completed final sign-off Feb 2016 | 950 Steiner St | to comply with physical inspection #cc - 7596Details
to comply with physical inspection #cc - 7596 | $10,000 |
| May 21, 2015 | Completed final sign-off Oct 2015 | 160 14th St | remove existing fire escape at front per plan. maher n/a.Details
remove existing fire escape at front per plan. maher n/a. | |
| Apr 16, 2015 | Completed final sign-off Jul 2016 | 160 14th St | replace stucco up to the cornice line with new "living wall" system consistin gof planted raw green over bituthene waterproof system. openings per historic placement. revision appl. 20153251907. maher n/a.Details
replace stucco up to the cornice line with new "living wall" system consistin gof planted raw green over bituthene waterproof system. openings per historic placement. revision appl. 20153251907. maher n/a. | $16,000 |
| Mar 25, 2015 | Completed final sign-off Jul 2016 | 160 14th St | removed window sill to repair dry rot and found additional rot. removed stucco and sheathing to access framing found rot issues with framing and repair replaced as needed. repair front approx 20'x 8'at first floor stucco in-kind.Details
removed window sill to repair dry rot and found additional rot. removed stucco and sheathing to access framing found rot issues with framing and repair replaced as needed. repair front approx 20'x 8'at first floor stucco in-kind. | $4,000 |
| Mar 24, 2015 | Completed final sign-off Jul 2016 | 460 Andover St | interior remodeling: add 2nd unit to ground floor, partial foundation replacement. no building enlargementDetails
interior remodeling: add 2nd unit to ground floor, partial foundation replacement. no building enlargement | $60,000 |
| Nov 20, 2014 | Completed final sign-off Nov 2014 | 24 Clyde St | common area- remove existing illegal 1/2 bath at ground level, restore to storage use. n/a ordinance #155-13Details
common area- remove existing illegal 1/2 bath at ground level, restore to storage use. n/a ordinance #155-13 | |
| Oct 31, 2014 | Completed final sign-off Nov 2014 | 1084 Capp St | install one 24,000 btu gree multi split ductless system in each unit (2 heat pumps one for each unit and 2 ductless inverters on each unit)Details
install one 24,000 btu gree multi split ductless system in each unit (2 heat pumps one for each unit and 2 ductless inverters on each unit) | $10,000 |
| Oct 7, 2014 | Completed final sign-off Nov 2014 | 18 Clyde St | to comply lwith physical inspection report #cc-7668. compliance with naher ordinance no 155-13 not required.Details
to comply lwith physical inspection report #cc-7668. compliance with naher ordinance no 155-13 not required. | $15,000 |
| Jul 1, 2014 | Completed final sign-off Sep 2014 | 1084 Capp St | to obtain final inspection for work approved under pa 200311140233; all work is completeDetails
to obtain final inspection for work approved under pa 200311140233; all work is complete | |
| Jul 1, 2014 | Completed final sign-off Nov 2014 | 1084 Capp St | to comply with physical inspection report #cc-7706Details
to comply with physical inspection report #cc-7706 | $25,000 |
| Apr 10, 2014 | Completed final sign-off Jun 2014 | 439 Waller St | to comply with physical inspection report #cc-7460, remodel bath, kitchen & powder rooms in units #439, #441 & 443.Details
to comply with physical inspection report #cc-7460, remodel bath, kitchen & powder rooms in units #439, #441 & 443. | $45,000 |
| May 7, 2010 | Never finaled issued May 2010, no final | 146 Stanyan St | to obtain final inspection for work approved under app #200712200986. all work has been completedDetails
to obtain final inspection for work approved under app #200712200986. all work has been completed | |
| Jun 12, 2009 | Completed final sign-off May 2010 | 121 05th Av | (n) solarium addition on second floor, relocate wall/door to home office and new rear deck and stair.Details
(n) solarium addition on second floor, relocate wall/door to home office and new rear deck and stair. | $65,000 |
| Feb 27, 2009 | Completed final sign-off May 2010 | 121 05th Av | first flr: add two posts (strucl) w/footings; 2nd floor: remodel kitchen incl w/new appliances; partially demo wall betw kitchen & dining room & replace/add two strucl posts w/bveam; add shear panels; demo fireplace. 3rd floor: remodel & expand bath #2; remodel bath #3 -demo wall & flue @ bedrom #2.Details
first flr: add two posts (strucl) w/footings; 2nd floor: remodel kitchen incl w/new appliances; partially demo wall betw kitchen & dining room & replace/add two strucl posts w/bveam; add shear panels; demo fireplace. 3rd floor: remodel & expand bath #2; remodel bath #3 -demo wall & flue @ bedrom #2. | $99,000 |
| Oct 17, 2008 | Completed final sign-off Nov 2008 | 111 Telegraph Hill Bl | remove and replace garage door.Details
remove and replace garage door. | $5,000 |
| Apr 4, 2008 | Completed final sign-off Dec 2008 | 651 27th St | we will be refinishing garage floor w/ epoxy some cement repair before epoxy is installed. install cabinets and counter with built in utility sink some work to fix crack in concrete on driveway. all work in garage.Details
we will be refinishing garage floor w/ epoxy some cement repair before epoxy is installed. install cabinets and counter with built in utility sink some work to fix crack in concrete on driveway. all work in garage. | $8,000 |
| Feb 28, 2008 | Completed final sign-off Apr 2008 | 961 Sanchez St | to comply w/nov#200736872. repair rotter and damage steps and stringers. less than 50% of stairway . no change in existing, windows & doors.Details
to comply w/nov#200736872. repair rotter and damage steps and stringers. less than 50% of stairway . no change in existing, windows & doors. | $1,500 |
| Dec 20, 2007 | Never finaled issued Dec 2007, no final | 146 Stanyan St | tile new shower/new pan, new tile, new fixtures, shower valve. no structural workDetails
tile new shower/new pan, new tile, new fixtures, shower valve. no structural work | $3,500 |
| Dec 10, 2007 | Completed final sign-off Feb 2008 | 4052 18th St | to comply with physical inspection 3r-4976Details
to comply with physical inspection 3r-4976 | $7,000 |
| Oct 4, 2007 | Expired or cancelled expired Feb 2010 | 4054 18th St | remove existing cabinets open walls to run new electric and plumbing patch sheetrock. install new cabinet and counter top open wall 3' from finish floor. revision to appl #200709213389. (all work at kitchen).Details
remove existing cabinets open walls to run new electric and plumbing patch sheetrock. install new cabinet and counter top open wall 3' from finish floor. revision to appl #200709213389. (all work at kitchen). | |
| Sep 21, 2007 | Never finaled issued Sep 2007, no final | 4054 18th St | demo lath and plaster, insulate walls and cieling, replace with new sheet rock, install cabinets and new counter tops. bring electrical and plmg to code. one kchn only. to comply with title 24 energy codesDetails
demo lath and plaster, insulate walls and cieling, replace with new sheet rock, install cabinets and new counter tops. bring electrical and plmg to code. one kchn only. to comply with title 24 energy codes | $10,000 |
| Jul 16, 2007 | Completed final sign-off Feb 2008 | 1032 Capp St | unit #1032a-revision to permit #200704138707. existing bathroom to be remain and to be remodeled. add cabinets in kitchen along right hand sideDetails
unit #1032a-revision to permit #200704138707. existing bathroom to be remain and to be remodeled. add cabinets in kitchen along right hand side | |
| Jun 12, 2007 | Completed final sign-off Sep 2007 | 4052 18th St | re-construction of rear yard stairs. require second means of egressDetails
re-construction of rear yard stairs. require second means of egress | $2,500 |
| Jun 12, 2007 | Completed final sign-off Sep 2007 | 4052 18th St | construction of a new retaining wall only. no other work with this permitDetails
construction of a new retaining wall only. no other work with this permit | $10,000 |