Block 1135, lot 012
146 Stanyan Blvd
- City’s use
- Multi-Family Residential
- Built
- 1936
- Stories
- 3
- Units
- 4
- Rooms
- 6 bathrooms
- Building
- 5,250 sq ft
- Lot
- 3,018 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 17, 2024 | Completed final sign-off Aug 2024 | 146 Stanyan St | Jemico Llc Dba Renewal By Andersen Of Sf | (e) wood, (n) alum clad wood - picture, casement style. no size change. < .30 max. replace (7) windows street visible - recessed.Details
(e) wood, (n) alum clad wood - picture, casement style. no size change. < .30 max. replace (7) windows street visible - recessed. | $27,953 |
| May 29, 2020 | Never finaled issued Jun 2020, no final | 146 Stanyan St | Mizen Construction Inc | replace loose stucco on 2/3's of the south side of the building only. not visible from streetDetails
replace loose stucco on 2/3's of the south side of the building only. not visible from street | $20,000 |
| Mar 10, 2020 | Never finaled issued Mar 2020, no final | 146 Stanyan St | street spaceDetails
street space | ||
| Jan 23, 2020 | Never finaled issued Jan 2020, no final | 146 Stanyan St | street spaceDetails
street space | ||
| Nov 28, 2016 | Never finaled issued Nov 2016, no final | 146 Stanyan St | Liske Construction | install boilts, 48"-60", where missing around the perimeter of the foundation with 8 1/2" embed. to install 1/2" plywood-cdx-in crawl spaces with nailed 4" o.c. around perimenter & 12" in field.Details
install boilts, 48"-60", where missing around the perimeter of the foundation with 8 1/2" embed. to install 1/2" plywood-cdx-in crawl spaces with nailed 4" o.c. around perimenter & 12" in field. | $2,500 |
| May 7, 2010 | Never finaled issued May 2010, no final | 146 Stanyan St | Tritone Construction | to obtain final inspection for work approved under app #200712200986. all work has been completedDetails
to obtain final inspection for work approved under app #200712200986. all work has been completed | |
| May 2, 2008 | Never finaled issued May 2008, no final | 146 Stanyan St | street space.Details
street space. | ||
| Dec 20, 2007 | Never finaled issued Dec 2007, no final | 146 Stanyan St | Tritone Construction | tile new shower/new pan, new tile, new fixtures, shower valve. no structural workDetails
tile new shower/new pan, new tile, new fixtures, shower valve. no structural work | $3,500 |
| Apr 25, 2005 | Completed final sign-off Jul 2005 | 146 Stanyan St | Markoff Structural Pest Control | termite report #05449 item #1,2,3,4,5 report #041362 item #3Details
termite report #05449 item #1,2,3,4,5 report #041362 item #3 | $15,000 |
| Jan 6, 2005 | Completed final sign-off Mar 2005 | 146 Stanyan St | Gil Construction & Assoc Inc. | at upper deck, install (4) redwood handrails. lower back deck & stairs to be repaired (repair work oDetails
at upper deck, install (4) redwood handrails. lower back deck & stairs to be repaired (repair work o | $2,300 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.