Back to kitchen remodel contractors
Tritone Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Aug 2026
- Last 24 months
- 6 permits filed
52 permits since 2000: 34 completed, 7 in progress, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 8 completed, 5 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Aug 2026 | 335 Sweeny St | remodel (1) kitchen in kind. remodelincludes eletrical redo new panle, upgrade kitchen circuits (7 total) replace in-kind cabinets/resuse (e) countertops and perform necessary plumbing.Details
remodel (1) kitchen in kind. remodelincludes eletrical redo new panle, upgrade kitchen circuits (7 total) replace in-kind cabinets/resuse (e) countertops and perform necessary plumbing. | $15,000 |
| Jul 14, 2025 | In progress filed Jul 2025, not yet issued | 88 King St | unit #121: bathroom remodel replace everything in kind. 1 new shower valve, 1 new tub, 1 new toilet, replace (e) lights and fan w/ new. remove and replace kitchen cabinets new countertop.Details
unit #121: bathroom remodel replace everything in kind. 1 new shower valve, 1 new tub, 1 new toilet, replace (e) lights and fan w/ new. remove and replace kitchen cabinets new countertop. | $20,000 |
| Jan 31, 2025 | In progress issued Jun 2025 | 25 Moulton St | 2nd & 3rd fl: remodel (e) kitchen area, to swap location of the living & bedroom. to remodel one full bath & add one full bathroom. add washer and dryer at the (n) living space. remove (e) fireplaceDetails
2nd & 3rd fl: remodel (e) kitchen area, to swap location of the living & bedroom. to remodel one full bath & add one full bathroom. add washer and dryer at the (n) living space. remove (e) fireplace | $70,000 |
| Dec 8, 2023 | In progress issued Dec 2023 | 151 Maywood Dr | rev to pa# 2023-1031-9871; replace (1) skylight in hallway and (1) sky light in bathroom in-kind with new, remove (1) sky light in kitchen and replace with new centered at room, remove (3) doors in non load bearing walls, replace with pocket doorsDetails
rev to pa# 2023-1031-9871; replace (1) skylight in hallway and (1) sky light in bathroom in-kind with new, remove (1) sky light in kitchen and replace with new centered at room, remove (3) doors in non load bearing walls, replace with pocket doors | $4,000 |
| Oct 31, 2023 | In progress issued Oct 2023 | 151 Maywood Dr | remodel 1 kitchen; 2 bathroom in kind. kitchen: counter top, new electrical & plumbing fixture. bathrooms: eletric & plumbing upgrade, new fixtures replace in kindDetails
remodel 1 kitchen; 2 bathroom in kind. kitchen: counter top, new electrical & plumbing fixture. bathrooms: eletric & plumbing upgrade, new fixtures replace in kind | $50,000 |
| Dec 17, 2021 | Never finaled issued Dec 2021, no final | 88 King St | bathroom remodel - remove tub replace with new shower - new shower valve, new tile. kitchen upgrade with new cabinets in kind. replace existing bedroom doors with new, replace powder room vanity in kind. replace existing lights with new and 1 new pocket door.Details
bathroom remodel - remove tub replace with new shower - new shower valve, new tile. kitchen upgrade with new cabinets in kind. replace existing bedroom doors with new, replace powder room vanity in kind. replace existing lights with new and 1 new pocket door. | $50,000 |
| Apr 14, 2021 | Never finaled issued Jun 2021, no final | 73 Idora Av | demo a wall between kitchen & living room.Details
demo a wall between kitchen & living room. | $4,000 |
| Jan 9, 2020 | Completed final sign-off Feb 2021 | 55 Santa Paula Av | removal of lath and plaster in key locations to expose framing. living room celing, partition wall, kitchen ceiling & partititon wall and bathroom ceiling and walls. lath and plaster to be replaced after discovery.Details
removal of lath and plaster in key locations to expose framing. living room celing, partition wall, kitchen ceiling & partititon wall and bathroom ceiling and walls. lath and plaster to be replaced after discovery. | $2,000 |
| Dec 11, 2017 | Never finaled issued Dec 2017, no final | 574 Castro St | remodel kitchen: new cabinets, new electrical, plumbing to remain in same location. refinish floorsDetails
remodel kitchen: new cabinets, new electrical, plumbing to remain in same location. refinish floors | $20,000 |
| Mar 9, 2017 | Completed final sign-off Oct 2017 | 3814 24th St | unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms.Details
unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms. | $55,000 |
| Jan 17, 2017 | Completed final sign-off Jul 2017 | 1473 Waller St | create opening in (e) bearing wall. remove portion of (e) partition. kitchen remodel. bath remodel. fill-in various partition wall openings. open various partition wallsDetails
create opening in (e) bearing wall. remove portion of (e) partition. kitchen remodel. bath remodel. fill-in various partition wall openings. open various partition walls | $60,000 |
| Nov 15, 2016 | Completed final sign-off Jun 2017 | 851 27th St | remove 2 walls, add one staircase glass railing(replacing extg half wall). add 2 skylights(less than 75 sq ft). replace extg french door with sliding door(rear of house same opening not visible from the street). update kitchen cabinets, main appliances.Details
remove 2 walls, add one staircase glass railing(replacing extg half wall). add 2 skylights(less than 75 sq ft). replace extg french door with sliding door(rear of house same opening not visible from the street). update kitchen cabinets, main appliances. | $31,360 |
| Feb 8, 2016 | Completed final sign-off Dec 2016 | 301 Madison St | floor 2: remodel existing kitchen (new island) & bath. enlarge opening between kitchen & living room to 10'-3" wide. replace swing door in bathroom with new pocket door. remove existing skylight in kitchen (replace with new) in new opening. replace e 2x2 window with new 2x4 window facing felton stDetails
floor 2: remodel existing kitchen (new island) & bath. enlarge opening between kitchen & living room to 10'-3" wide. replace swing door in bathroom with new pocket door. remove existing skylight in kitchen (replace with new) in new opening. replace e 2x2 window with new 2x4 window facing felton st | $12,000 |
| Apr 10, 2014 | Completed final sign-off Jun 2014 | 439 Waller St | to comply with physical inspection report #cc-7460, remodel bath, kitchen & powder rooms in units #439, #441 & 443.Details
to comply with physical inspection report #cc-7460, remodel bath, kitchen & powder rooms in units #439, #441 & 443. | $45,000 |
| Feb 27, 2009 | Completed final sign-off May 2010 | 121 05th Av | first flr: add two posts (strucl) w/footings; 2nd floor: remodel kitchen incl w/new appliances; partially demo wall betw kitchen & dining room & replace/add two strucl posts w/bveam; add shear panels; demo fireplace. 3rd floor: remodel & expand bath #2; remodel bath #3 -demo wall & flue @ bedrom #2.Details
first flr: add two posts (strucl) w/footings; 2nd floor: remodel kitchen incl w/new appliances; partially demo wall betw kitchen & dining room & replace/add two strucl posts w/bveam; add shear panels; demo fireplace. 3rd floor: remodel & expand bath #2; remodel bath #3 -demo wall & flue @ bedrom #2. | $99,000 |
| Oct 4, 2007 | Expired or cancelled expired Feb 2010 | 4054 18th St | remove existing cabinets open walls to run new electric and plumbing patch sheetrock. install new cabinet and counter top open wall 3' from finish floor. revision to appl #200709213389. (all work at kitchen).Details
remove existing cabinets open walls to run new electric and plumbing patch sheetrock. install new cabinet and counter top open wall 3' from finish floor. revision to appl #200709213389. (all work at kitchen). | |
| Jul 16, 2007 | Completed final sign-off Feb 2008 | 1032 Capp St | unit #1032a-revision to permit #200704138707. existing bathroom to be remain and to be remodeled. add cabinets in kitchen along right hand sideDetails
unit #1032a-revision to permit #200704138707. existing bathroom to be remain and to be remodeled. add cabinets in kitchen along right hand side |