Tritone Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Aug 2026
- Last 24 months
- 6 permits filed
52 permits since 2000: 34 completed, 7 in progress, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 never finaled. Typically 42 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2024 | Completed final sign-off Jan 2025 | 73 Idora Av | install 1 (n) deck with hot tub located at rear per plans. install 2 (n) doors, 1 outlet with shut off valvle. 2 (n) gfci outlets exterior. 1 (n) subpanel in garage and 1 outlet for ev charger, 1 (n) hose bib at deck levelDetails
install 1 (n) deck with hot tub located at rear per plans. install 2 (n) doors, 1 outlet with shut off valvle. 2 (n) gfci outlets exterior. 1 (n) subpanel in garage and 1 outlet for ev charger, 1 (n) hose bib at deck level | $20,000 |
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 266 Gates St | convert partially enclose rear porch to conditioned space. extend upper deck over (e) lower roof.Details
convert partially enclose rear porch to conditioned space. extend upper deck over (e) lower roof. | $100,000 |
| Jun 12, 2009 | Completed final sign-off May 2010 | 121 05th Av | (n) solarium addition on second floor, relocate wall/door to home office and new rear deck and stair.Details
(n) solarium addition on second floor, relocate wall/door to home office and new rear deck and stair. | $65,000 |