Back to bathroom remodel contractors
Tritone Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Aug 2026
- Last 24 months
- 6 permits filed
52 permits since 2000: 34 completed, 7 in progress, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 13 completed, 4 in progress, 3 never finaled. Typically 0 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2025 | In progress filed Jul 2025, not yet issued | 88 King St | unit #121: bathroom remodel replace everything in kind. 1 new shower valve, 1 new tub, 1 new toilet, replace (e) lights and fan w/ new. remove and replace kitchen cabinets new countertop.Details
unit #121: bathroom remodel replace everything in kind. 1 new shower valve, 1 new tub, 1 new toilet, replace (e) lights and fan w/ new. remove and replace kitchen cabinets new countertop. | $20,000 |
| Jan 31, 2025 | In progress issued Jun 2025 | 25 Moulton St | 2nd & 3rd fl: remodel (e) kitchen area, to swap location of the living & bedroom. to remodel one full bath & add one full bathroom. add washer and dryer at the (n) living space. remove (e) fireplaceDetails
2nd & 3rd fl: remodel (e) kitchen area, to swap location of the living & bedroom. to remodel one full bath & add one full bathroom. add washer and dryer at the (n) living space. remove (e) fireplace | $70,000 |
| Aug 2, 2024 | Completed final sign-off May 2025 | 145 San Juan Av | remodel one bathroom, replace 1 shower pan in kind, repair dryrot to comply with nov#202420330 item added to pa#202404190362Details
remodel one bathroom, replace 1 shower pan in kind, repair dryrot to comply with nov#202420330 item added to pa#202404190362 | |
| Dec 8, 2023 | In progress issued Dec 2023 | 151 Maywood Dr | rev to pa# 2023-1031-9871; replace (1) skylight in hallway and (1) sky light in bathroom in-kind with new, remove (1) sky light in kitchen and replace with new centered at room, remove (3) doors in non load bearing walls, replace with pocket doorsDetails
rev to pa# 2023-1031-9871; replace (1) skylight in hallway and (1) sky light in bathroom in-kind with new, remove (1) sky light in kitchen and replace with new centered at room, remove (3) doors in non load bearing walls, replace with pocket doors | $4,000 |
| Oct 31, 2023 | In progress issued Oct 2023 | 151 Maywood Dr | remodel 1 kitchen; 2 bathroom in kind. kitchen: counter top, new electrical & plumbing fixture. bathrooms: eletric & plumbing upgrade, new fixtures replace in kindDetails
remodel 1 kitchen; 2 bathroom in kind. kitchen: counter top, new electrical & plumbing fixture. bathrooms: eletric & plumbing upgrade, new fixtures replace in kind | $50,000 |
| Jan 6, 2023 | Completed final sign-off Apr 2023 | 601 Van Ness Av | unit #75:add 6 additional led can lights in living room, resurfes all surfaces in master bathroom, install new shower valve in extg tub shower enclosure. replace one tub in guest bathroom, replace one shower valve in guest bthrm. retile guest bathrm tub surround & floor/paintDetails
unit #75:add 6 additional led can lights in living room, resurfes all surfaces in master bathroom, install new shower valve in extg tub shower enclosure. replace one tub in guest bathroom, replace one shower valve in guest bthrm. retile guest bathrm tub surround & floor/paint | $15,000 |
| Aug 23, 2022 | Completed final sign-off Aug 2025 | 88 King St | demo 2 bathtub shower combo's. build two showers in existing space, replace tile, replace toilets. add 4 led light in each bathroom run one new electrical line from existing gfci to toilet locatioon for bidet.Details
demo 2 bathtub shower combo's. build two showers in existing space, replace tile, replace toilets. add 4 led light in each bathroom run one new electrical line from existing gfci to toilet locatioon for bidet. | $15,000 |
| Dec 17, 2021 | Never finaled issued Dec 2021, no final | 88 King St | bathroom remodel - remove tub replace with new shower - new shower valve, new tile. kitchen upgrade with new cabinets in kind. replace existing bedroom doors with new, replace powder room vanity in kind. replace existing lights with new and 1 new pocket door.Details
bathroom remodel - remove tub replace with new shower - new shower valve, new tile. kitchen upgrade with new cabinets in kind. replace existing bedroom doors with new, replace powder room vanity in kind. replace existing lights with new and 1 new pocket door. | $50,000 |
| Jan 9, 2020 | Completed final sign-off Feb 2021 | 55 Santa Paula Av | removal of lath and plaster in key locations to expose framing. living room celing, partition wall, kitchen ceiling & partititon wall and bathroom ceiling and walls. lath and plaster to be replaced after discovery.Details
removal of lath and plaster in key locations to expose framing. living room celing, partition wall, kitchen ceiling & partititon wall and bathroom ceiling and walls. lath and plaster to be replaced after discovery. | $2,000 |
| Feb 1, 2018 | Never finaled issued Feb 2018, no final | 266 Gates St | bathroom remodel. no reconfiguration. bring electrical to code.Details
bathroom remodel. no reconfiguration. bring electrical to code. | $20,000 |
| Jan 23, 2018 | Never finaled issued Jan 2018, no final | 574 Castro St | remodel 1 bathroom to (e) pa#2017-1211-6140 in-kind.Details
remodel 1 bathroom to (e) pa#2017-1211-6140 in-kind. | $12,000 |
| Mar 31, 2017 | Completed final sign-off Jun 2017 | 851 27th St | revision to (e) pa#201611152777, convert (e) playroom into bedroom, add bathroom to bedroom downstairs (shower, toilet & sink).Details
revision to (e) pa#201611152777, convert (e) playroom into bedroom, add bathroom to bedroom downstairs (shower, toilet & sink). | $12,500 |
| Mar 9, 2017 | Completed final sign-off Oct 2017 | 3814 24th St | unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms.Details
unit #3 - kitchen remodel - replacement of (e) plywood shearwall w/steel moment frame; replace fixtures & finishes in existing bathrooms. | $55,000 |
| Jan 17, 2017 | Completed final sign-off Jul 2017 | 1473 Waller St | create opening in (e) bearing wall. remove portion of (e) partition. kitchen remodel. bath remodel. fill-in various partition wall openings. open various partition wallsDetails
create opening in (e) bearing wall. remove portion of (e) partition. kitchen remodel. bath remodel. fill-in various partition wall openings. open various partition walls | $60,000 |
| May 12, 2016 | Completed final sign-off Aug 2016 | 2304 Washington St | #200- removal of non bearing partition walls for master bathroom, remodel & convert (e) study into bedroom, interior remodel of bathroom. n/a ordinance #155-13Details
#200- removal of non bearing partition walls for master bathroom, remodel & convert (e) study into bedroom, interior remodel of bathroom. n/a ordinance #155-13 | $20,000 |
| Feb 8, 2016 | Completed final sign-off Dec 2016 | 301 Madison St | floor 2: remodel existing kitchen (new island) & bath. enlarge opening between kitchen & living room to 10'-3" wide. replace swing door in bathroom with new pocket door. remove existing skylight in kitchen (replace with new) in new opening. replace e 2x2 window with new 2x4 window facing felton stDetails
floor 2: remodel existing kitchen (new island) & bath. enlarge opening between kitchen & living room to 10'-3" wide. replace swing door in bathroom with new pocket door. remove existing skylight in kitchen (replace with new) in new opening. replace e 2x2 window with new 2x4 window facing felton st | $12,000 |
| Nov 20, 2014 | Completed final sign-off Nov 2014 | 24 Clyde St | common area- remove existing illegal 1/2 bath at ground level, restore to storage use. n/a ordinance #155-13Details
common area- remove existing illegal 1/2 bath at ground level, restore to storage use. n/a ordinance #155-13 | |
| Apr 10, 2014 | Completed final sign-off Jun 2014 | 439 Waller St | to comply with physical inspection report #cc-7460, remodel bath, kitchen & powder rooms in units #439, #441 & 443.Details
to comply with physical inspection report #cc-7460, remodel bath, kitchen & powder rooms in units #439, #441 & 443. | $45,000 |
| Feb 27, 2009 | Completed final sign-off May 2010 | 121 05th Av | first flr: add two posts (strucl) w/footings; 2nd floor: remodel kitchen incl w/new appliances; partially demo wall betw kitchen & dining room & replace/add two strucl posts w/bveam; add shear panels; demo fireplace. 3rd floor: remodel & expand bath #2; remodel bath #3 -demo wall & flue @ bedrom #2.Details
first flr: add two posts (strucl) w/footings; 2nd floor: remodel kitchen incl w/new appliances; partially demo wall betw kitchen & dining room & replace/add two strucl posts w/bveam; add shear panels; demo fireplace. 3rd floor: remodel & expand bath #2; remodel bath #3 -demo wall & flue @ bedrom #2. | $99,000 |
| Jul 16, 2007 | Completed final sign-off Feb 2008 | 1032 Capp St | unit #1032a-revision to permit #200704138707. existing bathroom to be remain and to be remodeled. add cabinets in kitchen along right hand sideDetails
unit #1032a-revision to permit #200704138707. existing bathroom to be remain and to be remodeled. add cabinets in kitchen along right hand side |