Block 0301, lot 008
922 Post St
- City’s use
- Multi-Family Residential
- Built
- 1914
- Stories
- 6
- Units
- 36
- Rooms
- 36 bathrooms
- Building
- 19,380 sq ft
- Lot
- 4,726 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2024 | Completed final sign-off May 2024 | 922 Post St | Innovative Technologies | ref 202312152581- as built drawing to show final layout of fire alarm system complying with 1103.7.6.1Details
ref 202312152581- as built drawing to show final layout of fire alarm system complying with 1103.7.6.1 | |
| Dec 15, 2023 | Completed final sign-off May 2024 | 922 Post St | Innovative Technologies | upgrade of fire alarm system to comply with sffc 1103.7.6.1 installation of low frequency sounders in sleeping areasDetails
upgrade of fire alarm system to comply with sffc 1103.7.6.1 installation of low frequency sounders in sleeping areas | $15,000 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 922 Post St | Smelly Mel's Plumbing Inc | street spaceDetails
street space | |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 922 Post St | to obtain final inspection for work approved under pa# 201708084162. all work is complete. to comply with nov 201773502Details
to obtain final inspection for work approved under pa# 201708084162. all work is complete. to comply with nov 201773502 | ||
| Jul 9, 2018 | Never finaled issued Jul 2018, no final | 922 Post St | Super Roofing Company | reroofing.Details
reroofing. | $32,500 |
| Oct 27, 2017 | Never finaled issued Oct 2017, no final | 922 Post St | street spaceDetails
street space | ||
| Aug 8, 2017 | Never finaled issued Aug 2017, no final | 922 Post St | Tritone Construction | to comply with complaint numbers: 201773502 and 200922469. replacing (20) hollow core doors to fire rated doors.Details
to comply with complaint numbers: 201773502 and 200922469. replacing (20) hollow core doors to fire rated doors. | $9,400 |
| Aug 8, 2017 | Completed final sign-off Jan 2018 | 922 Post St | Maap Corp Dba Save Energy Co | replace 41 wood windows visible from street - no structural changes. max u factor. wood to wood hange out with ogee lugs to match existing window detail. double hung. no other work.Details
replace 41 wood windows visible from street - no structural changes. max u factor. wood to wood hange out with ogee lugs to match existing window detail. double hung. no other work. | $64,307 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 922 Post St | Maap Corp Dba Save Energy Co | replace 189 windows on back of building, not visible to street. no structural changes. max u-factor 0.32 or better. white vinyl.Details
replace 189 windows on back of building, not visible to street. no structural changes. max u-factor 0.32 or better. white vinyl. | $159,910 |
| Dec 17, 2010 | Expired or cancelled cancelled Aug 2022 | 922 Post St | replace rotten sashes on front (few) 8 sides (most) of buildingDetails
replace rotten sashes on front (few) 8 sides (most) of building | $11,987 | |
| Dec 17, 2010 | Completed final sign-off Apr 2011 | 922 Post St | The Window And Door Shop Inc | replace rotten sashes on front (field) 8-side (most) of bldg./wood in-kind. to comply w/his nov#201057626, 201072009, 201072008, 201033001 dated: 7/20/10, 10/8/10, 10/8/10 & 2/4/10.Details
replace rotten sashes on front (field) 8-side (most) of bldg./wood in-kind. to comply w/his nov#201057626, 201072009, 201072008, 201033001 dated: 7/20/10, 10/8/10, 10/8/10 & 2/4/10. | $11,987 |
| Sep 30, 2010 | Completed final sign-off Apr 2011 | 922 Post St | Ishsuren Battsooj | #101- change kitchen & bathroom cabinets, painted apt. & replace tile kitchen floor, no change to lighting, no change to exhaust system.Details
#101- change kitchen & bathroom cabinets, painted apt. & replace tile kitchen floor, no change to lighting, no change to exhaust system. | $3,000 |
| Jun 28, 2010 | Expired or cancelled expired Jul 2013 | 922 Post St | Cenco | unit 203 tub, toilet, sink. ref 200910058319 for construction costDetails
unit 203 tub, toilet, sink. ref 200910058319 for construction cost | |
| Jun 28, 2010 | Completed final sign-off Jun 2010 | 922 Post St | Cenco | revision to appl #200910058319 to document that no work was done in unit 202 as stated in permit application work was actually done in units #204 & 304.Details
revision to appl #200910058319 to document that no work was done in unit 202 as stated in permit application work was actually done in units #204 & 304. | |
| Mar 11, 2010 | Never finaled issued Mar 2010, no final | 922 Post St | street spaceDetails
street space | ||
| Oct 5, 2009 | Completed final sign-off Jun 2010 | 922 Post St | Cenco | 1st floor storage room only - replace 3 ceiling joist, 8 wall studs, 1 door. unit 202 & 204 only @ 2nd floor - 8 ft of kitchen cabinets, 2 toilets, 3 sinks, drywall (5/8" gyp b d, type 'x') new lighting, plumbing reapir as neded, elect as needed. repair in kind. no exterior chagnes.Details
1st floor storage room only - replace 3 ceiling joist, 8 wall studs, 1 door. unit 202 & 204 only @ 2nd floor - 8 ft of kitchen cabinets, 2 toilets, 3 sinks, drywall (5/8" gyp b d, type 'x') new lighting, plumbing reapir as neded, elect as needed. repair in kind. no exterior chagnes. | $105,000 |
| Sep 17, 2009 | Never finaled issued Sep 2009, no final | 922 Post St | street space & mta.Details
street space & mta. | ||
| Feb 24, 2009 | Never finaled issued Feb 2009, no final | 922 Post St | replace 6 wood windows visible from the street in kind, replace 2 sink formica counter tops, work to be done in apts 503 & 504 no change in cabinetDetails
replace 6 wood windows visible from the street in kind, replace 2 sink formica counter tops, work to be done in apts 503 & 504 no change in cabinet | $1,860 | |
| Jul 16, 2004 | Never finaled issued Jul 2004, no final | 922 Post St | street spaceDetails
street space | ||
| Feb 18, 2004 | Never finaled issued Feb 2004, no final | 922 Post St | #5 & #7- replace kitchen cabinets,replacement in kindDetails
#5 & #7- replace kitchen cabinets,replacement in kind | $1,000 | |
| Aug 19, 2003 | Never finaled issued Aug 2003, no final | 922 Post St | kitchen remodel in kitchen to be installedDetails
kitchen remodel in kitchen to be installed | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cenco (3), Innovative Technologies (2), Maap Corp Dba Save Energy Co (2), Ishsuren Battsooj, Smelly Mel's Plumbing Inc, Super Roofing Company, The Window And Door Shop Inc, Tritone Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.