Ishsuren Battsooj
- Based in
- San Mateo
- On San Francisco permits
- Aug 2008 to Oct 2024
- Last 24 months
- 1 permit filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2024 | Completed final sign-off Dec 2024 | 3997 17th St | 2nd story residential kitchen & bath remodeling in kind. no moving walls. all fixtures to remain in same location. kitchen approx. 80 sq ft. bathroom approx 40 sq ft.Details
2nd story residential kitchen & bath remodeling in kind. no moving walls. all fixtures to remain in same location. kitchen approx. 80 sq ft. bathroom approx 40 sq ft. | $8,000 |
| Mar 26, 2024 | Completed final sign-off May 2024 | 1483 34th Av | remove some areas of stucco on front of hous to repair/replace water damaged wood, replace down spout drain from roof, gutter to drain pipe at ground. repair in kind.Details
remove some areas of stucco on front of hous to repair/replace water damaged wood, replace down spout drain from roof, gutter to drain pipe at ground. repair in kind. | $11,000 |
| Nov 7, 2023 | Completed final sign-off Dec 2023 | 3900 17th St | to comply with abe ord 51-16 abe 202206211602 technical infeasibility, equivalent facilitation. install power door operator & kick plateDetails
to comply with abe ord 51-16 abe 202206211602 technical infeasibility, equivalent facilitation. install power door operator & kick plate | $10,000 |
| Sep 30, 2010 | Completed final sign-off Apr 2011 | 922 Post St | #101- change kitchen & bathroom cabinets, painted apt. & replace tile kitchen floor, no change to lighting, no change to exhaust system.Details
#101- change kitchen & bathroom cabinets, painted apt. & replace tile kitchen floor, no change to lighting, no change to exhaust system. | $3,000 |
| Feb 8, 2010 | Completed final sign-off Feb 2010 | 800 Van Ness Av | revision to pa# 2009-0127-0923-add 1 door inside bathroom to access electrical panelDetails
revision to pa# 2009-0127-0923-add 1 door inside bathroom to access electrical panel | $10 |
| Dec 14, 2009 | Completed final sign-off Feb 2010 | 800 Van Ness Av | revision to 200901270923. move wall at restroomDetails
revision to 200901270923. move wall at restroom | |
| Nov 19, 2009 | Completed final sign-off Jan 2010 | 4532 Fulton St | remodel bathroom, replace plumbing fixtures and new tileDetails
remodel bathroom, replace plumbing fixtures and new tile | $9,000 |
| May 12, 2009 | Completed final sign-off Jul 2009 | 4532 Fulton St | kitchen remodel. replace cabinets, appliances. same size & location of existing kitchen. no new walls. no modification to existing walls.Details
kitchen remodel. replace cabinets, appliances. same size & location of existing kitchen. no new walls. no modification to existing walls. | $15,000 |
| Mar 17, 2009 | Completed final sign-off Apr 2009 | 75 Vasquez Av | kitchen remodeling replace cabinet remodeling, replace cabinet, appliancesDetails
kitchen remodeling replace cabinet remodeling, replace cabinet, appliances | $13,790 |
| Jan 27, 2009 | Completed final sign-off Feb 2010 | 800 Van Ness Av | convert portion of existing restaurant to office space at second fl, new work include new walls, doors interior glazing, millwork & finishes, plus two new single occupant restrooms, mep & fire sprinkler work to be separately permited.Details
convert portion of existing restaurant to office space at second fl, new work include new walls, doors interior glazing, millwork & finishes, plus two new single occupant restrooms, mep & fire sprinkler work to be separately permited. | $70,000 |
| Aug 29, 2008 | Never finaled issued Aug 2008, no final | 650 Delancey St | work @ unit# 408 only. replace existing shower with a bathtub using existing plumbing in lower bathroom.Details
work @ unit# 408 only. replace existing shower with a bathtub using existing plumbing in lower bathroom. | $2,000 |