Back to bathroom remodel contractors
Ishsuren Battsooj
- Based in
- San Mateo
- On San Francisco permits
- Aug 2008 to Oct 2024
- Last 24 months
- 1 permit filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 62 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2024 | Completed final sign-off Dec 2024 | 3997 17th St | 2nd story residential kitchen & bath remodeling in kind. no moving walls. all fixtures to remain in same location. kitchen approx. 80 sq ft. bathroom approx 40 sq ft.Details
2nd story residential kitchen & bath remodeling in kind. no moving walls. all fixtures to remain in same location. kitchen approx. 80 sq ft. bathroom approx 40 sq ft. | $8,000 |
| Sep 30, 2010 | Completed final sign-off Apr 2011 | 922 Post St | #101- change kitchen & bathroom cabinets, painted apt. & replace tile kitchen floor, no change to lighting, no change to exhaust system.Details
#101- change kitchen & bathroom cabinets, painted apt. & replace tile kitchen floor, no change to lighting, no change to exhaust system. | $3,000 |
| Feb 8, 2010 | Completed final sign-off Feb 2010 | 800 Van Ness Av | revision to pa# 2009-0127-0923-add 1 door inside bathroom to access electrical panelDetails
revision to pa# 2009-0127-0923-add 1 door inside bathroom to access electrical panel | $10 |
| Nov 19, 2009 | Completed final sign-off Jan 2010 | 4532 Fulton St | remodel bathroom, replace plumbing fixtures and new tileDetails
remodel bathroom, replace plumbing fixtures and new tile | $9,000 |
| Aug 29, 2008 | Never finaled issued Aug 2008, no final | 650 Delancey St | work @ unit# 408 only. replace existing shower with a bathtub using existing plumbing in lower bathroom.Details
work @ unit# 408 only. replace existing shower with a bathtub using existing plumbing in lower bathroom. | $2,000 |