Frederic Grasset Design-Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Oct 2026
- Last 24 months
- 15 permits filed
65 permits since 2000: 39 completed, 13 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 561 Anderson St | change rear stair platform & stair to yard to concrete (previously wood). update internal stair configuration from 2nd to 3rd floor; add (1) entry step for code compliance. add stop @ ground floor. minor framing updatesDetails
change rear stair platform & stair to yard to concrete (previously wood). update internal stair configuration from 2nd to 3rd floor; add (1) entry step for code compliance. add stop @ ground floor. minor framing updates | |
| Aug 19, 2026 | In progress issued Aug 2026 | 166 Bonview St | 2nd revision to pa#202603036872, minor changes to layout and non-load baring walls, new overhang at the rear. replace window with glassblock.Details
2nd revision to pa#202603036872, minor changes to layout and non-load baring walls, new overhang at the rear. replace window with glassblock. | $8,500 |
| Apr 15, 2026 | In progress issued Apr 2026 | 166 Bonview St | revision to 202603036872, remnove & replace portions of (e) foundation, revisions to stairs & bathroom @ lower level, remove/replace stucco siding in front.Details
revision to 202603036872, remnove & replace portions of (e) foundation, revisions to stairs & bathroom @ lower level, remove/replace stucco siding in front. | $45,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 166 Bonview St | interior remodel to include kit. and bathroom remodel at the upper level. relocate int. stair case. new family room, study and 2 new bathrooms on the lower level. remodel existing rear yard deck. replace windows in front, relocate nw windows in the rear.Details
interior remodel to include kit. and bathroom remodel at the upper level. relocate int. stair case. new family room, study and 2 new bathrooms on the lower level. remodel existing rear yard deck. replace windows in front, relocate nw windows in the rear. | $129,000 |
| Jan 22, 2026 | In progress issued Apr 2026 | 561 Anderson St | revision to pa 202411134888 update front window operation & size, replace siding in-kind increase depth of entry westibule for accesible clearance. revise exterior stair to rear yard. internalwall layout updates framing/foundation revisions due to field conditionsDetails
revision to pa 202411134888 update front window operation & size, replace siding in-kind increase depth of entry westibule for accesible clearance. revise exterior stair to rear yard. internalwall layout updates framing/foundation revisions due to field conditions | |
| Jan 8, 2026 | In progress issued Mar 2026 | 871 Cayuga Av | 2nd fl - kitchen and bathroom remodel. no work visible from street. no exterior workDetails
2nd fl - kitchen and bathroom remodel. no work visible from street. no exterior work | $75,000 |
| Jan 5, 2026 | In progress issued Jan 2026 | 166 Bonview St | fix dryrot inkind at front side of buildling (~250 sqft). stucco. repair leaky roof at rear as needed, upgrade electrical thoughout home 1st flr, furnace. brace & bolt mudsil at garage: provide epoxy 5/8" dia threaded rod w/ 3x3x0.22 plate @ 4'. new gas line, kitchen remodel, new faucet, sink.Details
fix dryrot inkind at front side of buildling (~250 sqft). stucco. repair leaky roof at rear as needed, upgrade electrical thoughout home 1st flr, furnace. brace & bolt mudsil at garage: provide epoxy 5/8" dia threaded rod w/ 3x3x0.22 plate @ 4'. new gas line, kitchen remodel, new faucet, sink. | $15,000 |
| Nov 26, 2025 | In progress issued Nov 2025 | 2018 23rd St | removal of non-structural partitions @ stororage @ , repair of exterior stair, remodel of existing bathroom, removal of finishes on non-structural interior partitions per plan, new washer and dryer, new countertop in kitchen, new dish washer, kitchen window to be replaced in kind, new exterior door,Details
removal of non-structural partitions @ stororage @ , repair of exterior stair, remodel of existing bathroom, removal of finishes on non-structural interior partitions per plan, new washer and dryer, new countertop in kitchen, new dish washer, kitchen window to be replaced in kind, new exterior door, | $50,000 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 143 Newman St | bathroom surface remodel: replace tile, new sink, new bathtub, new toilet and add fan. all work is in-kind.Details
bathroom surface remodel: replace tile, new sink, new bathtub, new toilet and add fan. all work is in-kind. | $7,500 |
| Jun 27, 2025 | In progress issued Jan 2026 | 871 Cayuga Av | ground floor remodel and minor 1 story horizontal addition at rear yard ground floor. (n) bedroom, family room, bathroom, laundry, mud room, and storage. no excavation or work visible from street.Details
ground floor remodel and minor 1 story horizontal addition at rear yard ground floor. (n) bedroom, family room, bathroom, laundry, mud room, and storage. no excavation or work visible from street. | $170,487 |
| Jun 6, 2025 | Completed final sign-off Sep 2025 | 1274 Filbert St | #2: renovate existing kitchen, breakfast room, and pantry. new kitchen electrical circuits, 3) circuitsDetails
#2: renovate existing kitchen, breakfast room, and pantry. new kitchen electrical circuits, 3) circuits | $50,000 |
| Feb 7, 2025 | In progress issued Jul 2025 | 831 Hampshire St | remodel and alteration to a two-unit duplex. convert ground level to habitable space w/ new interior staircase to connect with lower unit. minor improvements to upper level. less than 50 c.y. of excavation. (n) conditioned area 855 sq.ft.Details
remodel and alteration to a two-unit duplex. convert ground level to habitable space w/ new interior staircase to connect with lower unit. minor improvements to upper level. less than 50 c.y. of excavation. (n) conditioned area 855 sq.ft. | $425,000 |
| Feb 4, 2025 | In progress issued May 2025 | 561 Anderson St | 1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,....Details
1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,.... | $235,000 |
| Jan 21, 2025 | In progress issued Jan 2025 | 559 Banks St | revision to pa #202501108080: to repair the existing dryrot at front (west) and side (south) and to provide new sheating beneath siding. to replace the existing front plaster finishes at areas of dryrot.Details
revision to pa #202501108080: to repair the existing dryrot at front (west) and side (south) and to provide new sheating beneath siding. to replace the existing front plaster finishes at areas of dryrot. | |
| Oct 8, 2024 | In progress issued Nov 2024 | 101 Stratford Dr | revision to pa# 202404129846: 1) existing guardrails to remain, no filet weld inspection. 2)conduct pull test for bolts installed in concrete.Details
revision to pa# 202404129846: 1) existing guardrails to remain, no filet weld inspection. 2)conduct pull test for bolts installed in concrete. | |
| Sep 12, 2024 | Completed final sign-off Mar 2025 | 211 Anderson St | replace existing siding at the rear. add (n) sheathing and insulation. replace (e) windows at the rear of the house. no change to front facadeDetails
replace existing siding at the rear. add (n) sheathing and insulation. replace (e) windows at the rear of the house. no change to front facade | $5,000 |
| Jun 25, 2024 | Completed final sign-off Sep 2025 | 12 Eugenia Av | kitchen, bathroom & laundry room remodel. new closets on upper fl. new windows in the rear not street visible from the streetDetails
kitchen, bathroom & laundry room remodel. new closets on upper fl. new windows in the rear not street visible from the street | $65,000 |
| Apr 12, 2024 | Completed final sign-off Jan 2025 | 101 Stratford Dr | interior remodel at kitchen, bathrooms, and adjacent areas, including structural improvement.Details
interior remodel at kitchen, bathrooms, and adjacent areas, including structural improvement. | $150,000 |
| Apr 12, 2024 | Completed final sign-off Jan 2025 | 101 Stratford Dr | replace 8 windows. not street facing.Details
replace 8 windows. not street facing. | $15,000 |
| Mar 20, 2024 | Completed final sign-off Mar 2025 | 561 Banks St | revision to pa 202308094034 to replace (e) brick stair base with (n) concrete stair baseDetails
revision to pa 202308094034 to replace (e) brick stair base with (n) concrete stair base | $600 |
| Jan 23, 2024 | Completed final sign-off Jul 2024 | 245 Sagamore St | revision to pa#202306129859: to install hydronic heating system, to revise structural plans as per site conditions, and to update plans as per site conditions.Details
revision to pa#202306129859: to install hydronic heating system, to revise structural plans as per site conditions, and to update plans as per site conditions. | $5,000 |
| Aug 9, 2023 | Completed final sign-off Mar 2025 | 561 Banks St | repair existing front stairs less than 50%, replace existing front bay with a new bay, replace the existing front plasterDetails
repair existing front stairs less than 50%, replace existing front bay with a new bay, replace the existing front plaster | $10,000 |
| Aug 1, 2023 | Expired or cancelled cancelled Jan 2024 | 1934 Jefferson St | to comply with his nov#202304057 dated 2/24/2023, new 1-hour fire protection wall @ rear roof deckDetails
to comply with his nov#202304057 dated 2/24/2023, new 1-hour fire protection wall @ rear roof deck | $10,000 |
| Jul 19, 2023 | Completed final sign-off May 2024 | 430 Gates St | 2/f: remodel to create open floor plan kitchen, structural improvements throughoutDetails
2/f: remodel to create open floor plan kitchen, structural improvements throughout | $95,000 |
| Jun 12, 2023 | Completed final sign-off Jul 2024 | 245 Sagamore St | to create a new junior adu on the first floor (in existing interior space) per state ordinance gcs #65852.2(a) thru (d). to remodel an existing kitchen and bath on the second floor. to create a new rear yard elevated deck and spiral stair to grade.Details
to create a new junior adu on the first floor (in existing interior space) per state ordinance gcs #65852.2(a) thru (d). to remodel an existing kitchen and bath on the second floor. to create a new rear yard elevated deck and spiral stair to grade. | $150,000 |
| May 31, 2023 | Completed final sign-off Oct 2023 | 133 Lundys Ln | to comply with nov 202305175: replace ship ladder with spiral stairs. replace 3 vinyl windows with wood windows, legalize lower level family room; study and bathroom and hot tub in side yard.Details
to comply with nov 202305175: replace ship ladder with spiral stairs. replace 3 vinyl windows with wood windows, legalize lower level family room; study and bathroom and hot tub in side yard. | $85,000 |
| May 2, 2023 | Completed final sign-off Jun 2023 | 260 Glenview Dr | deck replacement in response to complaints 202305846 and 202306957. str workDetails
deck replacement in response to complaints 202305846 and 202306957. str work | $12,000 |
| Apr 12, 2023 | Completed final sign-off Mar 2024 | 2651 16th Av | rev to pa# 2022-1208-7902 enlarge kitchen revised struct detailsDetails
rev to pa# 2022-1208-7902 enlarge kitchen revised struct details | $4,500 |
| Mar 29, 2023 | Completed final sign-off Jun 2025 | 260 Glenview Dr | repair fence, remove dryer vent, re-attach rain leaders, repair dryrot at rear facade of building. to comply with complaints: 202305708, 202305709, 202305629.Details
repair fence, remove dryer vent, re-attach rain leaders, repair dryrot at rear facade of building. to comply with complaints: 202305708, 202305709, 202305629. | $1,500 |
| Dec 8, 2022 | Completed final sign-off Mar 2024 | 2651 16th Av | interior remodel to include: (n) bedroom in lower level, relocate bathroom on the lower level. remodel kitchen and bathroom on upper level. (n) conditioned space = 241 sqft. remove ext. staircase for passageway.Details
interior remodel to include: (n) bedroom in lower level, relocate bathroom on the lower level. remodel kitchen and bathroom on upper level. (n) conditioned space = 241 sqft. remove ext. staircase for passageway. | $175,000 |
| Jul 20, 2022 | Completed final sign-off May 2023 | 320 San Carlos St | put in skylight and parapet wall.Details
put in skylight and parapet wall. | $1,800 |
| Feb 2, 2022 | Expired or cancelled cancelled Jan 2026 | 316 San Carlos St | per plumbing inspector's request, to correct description of previously approved pa# 202002134469 that contains 3 bathrooms (not 2 bathrooms). 2 on 3rd fl and 1 at basement. previously approved plans shows 3 bathrooms.Details
per plumbing inspector's request, to correct description of previously approved pa# 202002134469 that contains 3 bathrooms (not 2 bathrooms). 2 on 3rd fl and 1 at basement. previously approved plans shows 3 bathrooms. | |
| Dec 28, 2021 | Completed final sign-off Mar 2023 | 120 Forest Knolls Dr | kitchen remodel, new tile, and fixtures in bathrooms, alter (e) stairs to be code compliant, remodel & expand (e) family room, relocat powder roomDetails
kitchen remodel, new tile, and fixtures in bathrooms, alter (e) stairs to be code compliant, remodel & expand (e) family room, relocat powder room | $120,000 |
| Nov 21, 2020 | Completed final sign-off Mar 2021 | 336 Prospect Av | engineering revision to pa# 202007200519. add foundation replacement & foundation location adjustment; revise attic access location.Details
engineering revision to pa# 202007200519. add foundation replacement & foundation location adjustment; revise attic access location. | $12,000 |
| Nov 20, 2020 | Completed final sign-off Apr 2021 | 672 Moultrie St | revision to pa# 201911147287. new foundation and framing reinforcement. change front fence and railing design.Details
revision to pa# 201911147287. new foundation and framing reinforcement. change front fence and railing design. | $8,000 |
| Aug 25, 2020 | Completed final sign-off Jun 2021 | 166 Anderson St | kitchen & bathroom remodelDetails
kitchen & bathroom remodel | $85,000 |
| Jul 20, 2020 | Completed final sign-off Mar 2021 | 336 Prospect Av | renovate an (e) basement to create 2 (n) bedrooms & 1 bathroom. renovate (e) bathroom.Details
renovate an (e) basement to create 2 (n) bedrooms & 1 bathroom. renovate (e) bathroom. | $125,000 |
| Feb 13, 2020 | Completed final sign-off Apr 2023 | 316 San Carlos St | to construct a new 3rd story addition. consisting of 3 bedrooms and 2 baths.Details
to construct a new 3rd story addition. consisting of 3 bedrooms and 2 baths. | $275,000 |
| Dec 4, 2019 | Completed final sign-off Jan 2021 | 101 Appleton Av | infill lightwell, convert rear portion of garage into new bedroom, bathroom, and office. remodel (e) bathroom and stairs.Details
infill lightwell, convert rear portion of garage into new bedroom, bathroom, and office. remodel (e) bathroom and stairs. | $95,000 |
| Nov 14, 2019 | Completed final sign-off Apr 2021 | 672 Moultrie St | alt to the facade and front stairs to include new windows, remove protruding bay window & new siding and railings.Details
alt to the facade and front stairs to include new windows, remove protruding bay window & new siding and railings. | $40,000 |
| Dec 12, 2018 | Completed final sign-off Oct 2019 | 639 Elizabeth St | new half bath on main floor. no other work.Details
new half bath on main floor. no other work. | $9,500 |
| Jul 2, 2013 | Never finaled issued Jul 2013, no final | 721 Shrader St | remodel kitchen & dining room. work location: 723 shrader streetDetails
remodel kitchen & dining room. work location: 723 shrader street | $35,000 |
| May 2, 2012 | Completed final sign-off May 2012 | 1154 Clayton St | replace 7 windows in kind, max u factor 0.40.Details
replace 7 windows in kind, max u factor 0.40. | $7,000 |
| Jun 28, 2011 | Never finaled issued Jun 2011, no final | 1255 07th Av | repair front stairs - less than 50%Details
repair front stairs - less than 50% | $500 |
| May 5, 2011 | Completed final sign-off Sep 2012 | 235 Bonview St | remodel kitchen & bathroom, relocate stairway, installation of plywood panels to open stud walls & certain partition walls on lower level garage per plan, installation of connection hardward per plan.Details
remodel kitchen & bathroom, relocate stairway, installation of plywood panels to open stud walls & certain partition walls on lower level garage per plan, installation of connection hardward per plan. | $40,000 |
| Dec 14, 2010 | Expired or cancelled expired Mar 2013 | 22 Costa St | new retaining wall at existing retaining wall on the property line.Details
new retaining wall at existing retaining wall on the property line. | $4,000 |
| Sep 9, 2010 | Completed final sign-off Feb 2011 | 847 Oak St | convert study into bathroom & enlarge (e) closetDetails
convert study into bathroom & enlarge (e) closet | $15,000 |
| Jul 9, 2010 | Completed final sign-off Jan 2014 | 1468 Masonic Av | alteration of existing 1 story family room at the ground level/rear of building horizontally, add skylites, remove existing wood deck and stair.Details
alteration of existing 1 story family room at the ground level/rear of building horizontally, add skylites, remove existing wood deck and stair. | $35,000 |
| Dec 9, 2009 | Completed final sign-off Mar 2011 | 762 Clayton St | revision to structural portion of appl #200710034498-s, reduction of scope of work - in cojunction w/revision pa #200911191688 - originally proposed 3rd floor will not be built.Details
revision to structural portion of appl #200710034498-s, reduction of scope of work - in cojunction w/revision pa #200911191688 - originally proposed 3rd floor will not be built. | |
| Nov 19, 2009 | Completed final sign-off Apr 2010 | 762 Clayton St | revision to appl #200710034498: reduction of scope of work - proposed 3rd floor will not be built. revise 2nd floor plan to include new bathroom & new window & doors at rear. no structural work under this permit.Details
revision to appl #200710034498: reduction of scope of work - proposed 3rd floor will not be built. revise 2nd floor plan to include new bathroom & new window & doors at rear. no structural work under this permit. | |
| Sep 14, 2009 | Never finaled issued Sep 2009, no final | 238 Bonview St | replace window aluminum clad windows, front and back approx 19. install hardyplank siding at rear of buildingDetails
replace window aluminum clad windows, front and back approx 19. install hardyplank siding at rear of building | $22,000 |
| Jul 28, 2009 | Never finaled issued Jul 2009, no final | 418 Eugenia Av | renew pa# 2007/12/17/0650 to obtain final inspection. all work has been completed.Details
renew pa# 2007/12/17/0650 to obtain final inspection. all work has been completed. | $40,000 |
| May 26, 2009 | Completed final sign-off Jun 2009 | 1191 Oak St | abate violation complaint# 200902784 & # 200228829. see attached. garbage receptacle open to the air.Details
abate violation complaint# 200902784 & # 200228829. see attached. garbage receptacle open to the air. | $3,000 |
| Apr 23, 2009 | Completed final sign-off May 2009 | 445 Banks St | install skylight above bedroomDetails
install skylight above bedroom | $1,800 |
| Mar 6, 2009 | Completed final sign-off Dec 2010 | 88 Museum Wy | interior remodel of (e) kitchen, master bath, bedroom, powder room & laundry. replacement of spiral stairway & railing.Details
interior remodel of (e) kitchen, master bath, bedroom, powder room & laundry. replacement of spiral stairway & railing. | $137,000 |
| Dec 17, 2007 | Never finaled issued Jun 2008, no final | 418 Eugenia Av | construct (2) story rear addition w/ basement level w/ (3) bathrooms & interior remodel of (n) kitchen. addition to expand building in lieu of (e) stair.Details
construct (2) story rear addition w/ basement level w/ (3) bathrooms & interior remodel of (n) kitchen. addition to expand building in lieu of (e) stair. | $150,000 |
| Oct 3, 2007 | Never finaled issued Nov 2008, no final | 762 Clayton St | convert of (e) attic space into living space. interior remodel to include (n) kitchen & bathrooms. rebuilding of (e) decks. installation of (n) skylights & replacement of some (e) windows.Details
convert of (e) attic space into living space. interior remodel to include (n) kitchen & bathrooms. rebuilding of (e) decks. installation of (n) skylights & replacement of some (e) windows. | $250,000 |
| Oct 18, 2006 | Completed final sign-off Nov 2006 | 1 Lupine Av | to renew app #200605232257 onlyDetails
to renew app #200605232257 only | |
| Jul 18, 2006 | Expired or cancelled expired Apr 2007 | 954 Carolina St | foundation work and wall re-inorcement, approx 25lfDetails
foundation work and wall re-inorcement, approx 25lf | $10,000 |
| May 23, 2006 | Expired or cancelled expired Nov 2006 | 1 Lupine Av | turn room at basement into storage office with one half bath storageDetails
turn room at basement into storage office with one half bath storage | $5,000 |
| May 2, 2006 | Completed final sign-off Mar 2007 | 1089 Chestnut St | remodel kchn, replace e. exterior door in 3rd floor kchn with new sliding glass doorDetails
remodel kchn, replace e. exterior door in 3rd floor kchn with new sliding glass door | $65,000 |
| Nov 16, 2005 | Completed final sign-off Mar 2006 | 250 Bonview St | rebuild dinner area to codeand add 2 skylight no increase in size of building (double glazed skylight) devision to permit appl:200510125827Details
rebuild dinner area to codeand add 2 skylight no increase in size of building (double glazed skylight) devision to permit appl:200510125827 | $5,000 |
| Nov 7, 2005 | Expired or cancelled expired Mar 2013 | 135 Mountain Spring Av | remove (e) wall and patio doors, expand (e) play area width and install new doors and wall & portion roof above.Details
remove (e) wall and patio doors, expand (e) play area width and install new doors and wall & portion roof above. | $8,000 |
| Oct 18, 2005 | Completed final sign-off Mar 2006 | 250 Bonview St | bathroom remodel/ kchn remodel/relocate wndw & doorDetails
bathroom remodel/ kchn remodel/relocate wndw & door | $35,000 |
| Aug 31, 2005 | Expired or cancelled expired Mar 2013 | 135 Mountain Spring Av | enclose (e) porch to create foyer,add (2) baths, remodel (2) baths add. (2) bedrooms + playroom, add (3) skylights. size permit application.Details
enclose (e) porch to create foyer,add (2) baths, remodel (2) baths add. (2) bedrooms + playroom, add (3) skylights. size permit application. | $100,000 |