Back to bathroom remodel contractors
Frederic Grasset Design-Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Oct 2026
- Last 24 months
- 15 permits filed
65 permits since 2000: 39 completed, 13 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 17 completed, 6 in progress, 2 never finaled, 3 expired or cancelled. Typically 14 days from filing to permit and 288 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2026 | In progress issued Apr 2026 | 166 Bonview St | revision to 202603036872, remnove & replace portions of (e) foundation, revisions to stairs & bathroom @ lower level, remove/replace stucco siding in front.Details
revision to 202603036872, remnove & replace portions of (e) foundation, revisions to stairs & bathroom @ lower level, remove/replace stucco siding in front. | $45,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 166 Bonview St | interior remodel to include kit. and bathroom remodel at the upper level. relocate int. stair case. new family room, study and 2 new bathrooms on the lower level. remodel existing rear yard deck. replace windows in front, relocate nw windows in the rear.Details
interior remodel to include kit. and bathroom remodel at the upper level. relocate int. stair case. new family room, study and 2 new bathrooms on the lower level. remodel existing rear yard deck. replace windows in front, relocate nw windows in the rear. | $129,000 |
| Jan 8, 2026 | In progress issued Mar 2026 | 871 Cayuga Av | 2nd fl - kitchen and bathroom remodel. no work visible from street. no exterior workDetails
2nd fl - kitchen and bathroom remodel. no work visible from street. no exterior work | $75,000 |
| Nov 26, 2025 | In progress issued Nov 2025 | 2018 23rd St | removal of non-structural partitions @ stororage @ , repair of exterior stair, remodel of existing bathroom, removal of finishes on non-structural interior partitions per plan, new washer and dryer, new countertop in kitchen, new dish washer, kitchen window to be replaced in kind, new exterior door,Details
removal of non-structural partitions @ stororage @ , repair of exterior stair, remodel of existing bathroom, removal of finishes on non-structural interior partitions per plan, new washer and dryer, new countertop in kitchen, new dish washer, kitchen window to be replaced in kind, new exterior door, | $50,000 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 143 Newman St | bathroom surface remodel: replace tile, new sink, new bathtub, new toilet and add fan. all work is in-kind.Details
bathroom surface remodel: replace tile, new sink, new bathtub, new toilet and add fan. all work is in-kind. | $7,500 |
| Jun 27, 2025 | In progress issued Jan 2026 | 871 Cayuga Av | ground floor remodel and minor 1 story horizontal addition at rear yard ground floor. (n) bedroom, family room, bathroom, laundry, mud room, and storage. no excavation or work visible from street.Details
ground floor remodel and minor 1 story horizontal addition at rear yard ground floor. (n) bedroom, family room, bathroom, laundry, mud room, and storage. no excavation or work visible from street. | $170,487 |
| Feb 4, 2025 | In progress issued May 2025 | 561 Anderson St | 1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,....Details
1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,.... | $235,000 |
| Jun 25, 2024 | Completed final sign-off Sep 2025 | 12 Eugenia Av | kitchen, bathroom & laundry room remodel. new closets on upper fl. new windows in the rear not street visible from the streetDetails
kitchen, bathroom & laundry room remodel. new closets on upper fl. new windows in the rear not street visible from the street | $65,000 |
| Apr 12, 2024 | Completed final sign-off Jan 2025 | 101 Stratford Dr | interior remodel at kitchen, bathrooms, and adjacent areas, including structural improvement.Details
interior remodel at kitchen, bathrooms, and adjacent areas, including structural improvement. | $150,000 |
| Jun 12, 2023 | Completed final sign-off Jul 2024 | 245 Sagamore St | to create a new junior adu on the first floor (in existing interior space) per state ordinance gcs #65852.2(a) thru (d). to remodel an existing kitchen and bath on the second floor. to create a new rear yard elevated deck and spiral stair to grade.Details
to create a new junior adu on the first floor (in existing interior space) per state ordinance gcs #65852.2(a) thru (d). to remodel an existing kitchen and bath on the second floor. to create a new rear yard elevated deck and spiral stair to grade. | $150,000 |
| May 31, 2023 | Completed final sign-off Oct 2023 | 133 Lundys Ln | to comply with nov 202305175: replace ship ladder with spiral stairs. replace 3 vinyl windows with wood windows, legalize lower level family room; study and bathroom and hot tub in side yard.Details
to comply with nov 202305175: replace ship ladder with spiral stairs. replace 3 vinyl windows with wood windows, legalize lower level family room; study and bathroom and hot tub in side yard. | $85,000 |
| Dec 8, 2022 | Completed final sign-off Mar 2024 | 2651 16th Av | interior remodel to include: (n) bedroom in lower level, relocate bathroom on the lower level. remodel kitchen and bathroom on upper level. (n) conditioned space = 241 sqft. remove ext. staircase for passageway.Details
interior remodel to include: (n) bedroom in lower level, relocate bathroom on the lower level. remodel kitchen and bathroom on upper level. (n) conditioned space = 241 sqft. remove ext. staircase for passageway. | $175,000 |
| Feb 2, 2022 | Expired or cancelled cancelled Jan 2026 | 316 San Carlos St | per plumbing inspector's request, to correct description of previously approved pa# 202002134469 that contains 3 bathrooms (not 2 bathrooms). 2 on 3rd fl and 1 at basement. previously approved plans shows 3 bathrooms.Details
per plumbing inspector's request, to correct description of previously approved pa# 202002134469 that contains 3 bathrooms (not 2 bathrooms). 2 on 3rd fl and 1 at basement. previously approved plans shows 3 bathrooms. | |
| Dec 28, 2021 | Completed final sign-off Mar 2023 | 120 Forest Knolls Dr | kitchen remodel, new tile, and fixtures in bathrooms, alter (e) stairs to be code compliant, remodel & expand (e) family room, relocat powder roomDetails
kitchen remodel, new tile, and fixtures in bathrooms, alter (e) stairs to be code compliant, remodel & expand (e) family room, relocat powder room | $120,000 |
| Aug 25, 2020 | Completed final sign-off Jun 2021 | 166 Anderson St | kitchen & bathroom remodelDetails
kitchen & bathroom remodel | $85,000 |
| Jul 20, 2020 | Completed final sign-off Mar 2021 | 336 Prospect Av | renovate an (e) basement to create 2 (n) bedrooms & 1 bathroom. renovate (e) bathroom.Details
renovate an (e) basement to create 2 (n) bedrooms & 1 bathroom. renovate (e) bathroom. | $125,000 |
| Feb 13, 2020 | Completed final sign-off Apr 2023 | 316 San Carlos St | to construct a new 3rd story addition. consisting of 3 bedrooms and 2 baths.Details
to construct a new 3rd story addition. consisting of 3 bedrooms and 2 baths. | $275,000 |
| Dec 4, 2019 | Completed final sign-off Jan 2021 | 101 Appleton Av | infill lightwell, convert rear portion of garage into new bedroom, bathroom, and office. remodel (e) bathroom and stairs.Details
infill lightwell, convert rear portion of garage into new bedroom, bathroom, and office. remodel (e) bathroom and stairs. | $95,000 |
| Dec 12, 2018 | Completed final sign-off Oct 2019 | 639 Elizabeth St | new half bath on main floor. no other work.Details
new half bath on main floor. no other work. | $9,500 |
| May 5, 2011 | Completed final sign-off Sep 2012 | 235 Bonview St | remodel kitchen & bathroom, relocate stairway, installation of plywood panels to open stud walls & certain partition walls on lower level garage per plan, installation of connection hardward per plan.Details
remodel kitchen & bathroom, relocate stairway, installation of plywood panels to open stud walls & certain partition walls on lower level garage per plan, installation of connection hardward per plan. | $40,000 |
| Sep 9, 2010 | Completed final sign-off Feb 2011 | 847 Oak St | convert study into bathroom & enlarge (e) closetDetails
convert study into bathroom & enlarge (e) closet | $15,000 |
| Nov 19, 2009 | Completed final sign-off Apr 2010 | 762 Clayton St | revision to appl #200710034498: reduction of scope of work - proposed 3rd floor will not be built. revise 2nd floor plan to include new bathroom & new window & doors at rear. no structural work under this permit.Details
revision to appl #200710034498: reduction of scope of work - proposed 3rd floor will not be built. revise 2nd floor plan to include new bathroom & new window & doors at rear. no structural work under this permit. | |
| Mar 6, 2009 | Completed final sign-off Dec 2010 | 88 Museum Wy | interior remodel of (e) kitchen, master bath, bedroom, powder room & laundry. replacement of spiral stairway & railing.Details
interior remodel of (e) kitchen, master bath, bedroom, powder room & laundry. replacement of spiral stairway & railing. | $137,000 |
| Dec 17, 2007 | Never finaled issued Jun 2008, no final | 418 Eugenia Av | construct (2) story rear addition w/ basement level w/ (3) bathrooms & interior remodel of (n) kitchen. addition to expand building in lieu of (e) stair.Details
construct (2) story rear addition w/ basement level w/ (3) bathrooms & interior remodel of (n) kitchen. addition to expand building in lieu of (e) stair. | $150,000 |
| Oct 3, 2007 | Never finaled issued Nov 2008, no final | 762 Clayton St | convert of (e) attic space into living space. interior remodel to include (n) kitchen & bathrooms. rebuilding of (e) decks. installation of (n) skylights & replacement of some (e) windows.Details
convert of (e) attic space into living space. interior remodel to include (n) kitchen & bathrooms. rebuilding of (e) decks. installation of (n) skylights & replacement of some (e) windows. | $250,000 |
| May 23, 2006 | Expired or cancelled expired Nov 2006 | 1 Lupine Av | turn room at basement into storage office with one half bath storageDetails
turn room at basement into storage office with one half bath storage | $5,000 |
| Oct 18, 2005 | Completed final sign-off Mar 2006 | 250 Bonview St | bathroom remodel/ kchn remodel/relocate wndw & doorDetails
bathroom remodel/ kchn remodel/relocate wndw & door | $35,000 |
| Aug 31, 2005 | Expired or cancelled expired Mar 2013 | 135 Mountain Spring Av | enclose (e) porch to create foyer,add (2) baths, remodel (2) baths add. (2) bedrooms + playroom, add (3) skylights. size permit application.Details
enclose (e) porch to create foyer,add (2) baths, remodel (2) baths add. (2) bedrooms + playroom, add (3) skylights. size permit application. | $100,000 |