Julie Jackson
- Listed as
- architect
- Firm
- Jackson Liles Architecture
- Based in
- Sf
- On San Francisco permits
- Aug 2006 to Dec 2020
25 permits since 2000 (architect on 25 permits): 20 completed, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2020 | Completed final sign-off Mar 2021 | 2190 46th Av | Derry Casey Builders Inc | revision to pa #202008111526 - to clarify existing room name to "storage." no other changesDetails
revision to pa #202008111526 - to clarify existing room name to "storage." no other changes | |
| Aug 11, 2020 | Completed final sign-off Mar 2021 | 2190 46th Av | Derry Casey Builders Inc | in-kind renovation of existing family room and bathroom on level 1. replace plumbing fixtures and cabinets in same location, new finishes and flooring. no changes to the exterior.Details
in-kind renovation of existing family room and bathroom on level 1. replace plumbing fixtures and cabinets in same location, new finishes and flooring. no changes to the exterior. | $18,000 |
| Aug 6, 2019 | Expired or cancelled withdrawn Jan 2021 | 969 Treat Av | Guzman Construction Group Inc. | grading and foundationDetails
grading and foundation | $173,250 |
| Jun 14, 2019 | Completed final sign-off Jan 2020 | 2325 03rd St | Huff Construction Company Inc | revision to pa 2018-0226-2265 and constructionof full heig walls at the entry and existing bathroom sink area to create a lactation room in suite 205Details
revision to pa 2018-0226-2265 and constructionof full heig walls at the entry and existing bathroom sink area to create a lactation room in suite 205 | |
| Jun 12, 2019 | Completed final sign-off Mar 2021 | 2190 46th Av | Derry Casey Builders Inc | capturing attic level as additonal new habitable space renovation of (e) single family home to include inteiorrenovations, replacement of (2) existing dormers w/(2) new dormers, new windows, new skylights, (2) new interior stairs & new deck & stairs to the rear yard.Details
capturing attic level as additonal new habitable space renovation of (e) single family home to include inteiorrenovations, replacement of (2) existing dormers w/(2) new dormers, new windows, new skylights, (2) new interior stairs & new deck & stairs to the rear yard. | $402,873 |
| Jan 17, 2019 | Completed final sign-off Nov 2019 | 969 Treat Av | Montes Bros Construction Inc | demolish one story type vb construction office building.Details
demolish one story type vb construction office building. | $20,000 |
| Jan 17, 2019 | Completed final sign-off Nov 2019 | 969 Treat Av | Montes Bros Construction Inc | demolish one story type vb construction storage shed.Details
demolish one story type vb construction storage shed. | $16,000 |
| Jan 17, 2019 | Completed final sign-off Nov 2019 | 969 Treat Av | Montes Bros Construction Inc | demolish one story type vb construction storage shed.Details
demolish one story type vb construction storage shed. | $3,000 |
| Oct 23, 2018 | Completed final sign-off Feb 2021 | 969 Treat Av | Guzman Construction Group Inc. | erect 2-story, type 5-b, no basement, no dwelling, for child care building. ** comply w/ maher ord# 155-13, route to health**Details
erect 2-story, type 5-b, no basement, no dwelling, for child care building. ** comply w/ maher ord# 155-13, route to health** | $2,500,000 |
| Feb 26, 2018 | Never finaled issued May 2018, no final | 2325 03rd St | Huff Construction Company Inc, Edenavow Construction & Design | create a doorway btw 2 adjacent tenant spaces, removal of a kitchen area, createof a small enclosed private work space. assoc mech/ele/plm/fire/life safety scopes to be design - build and to be under sep permits. scope of work is all int. no work affects the extDetails
create a doorway btw 2 adjacent tenant spaces, removal of a kitchen area, createof a small enclosed private work space. assoc mech/ele/plm/fire/life safety scopes to be design - build and to be under sep permits. scope of work is all int. no work affects the ext | $12,500 |
| Sep 22, 2017 | Completed final sign-off Dec 2017 | 2095 Jerrold Av | O'dwyer Construction Inc | t.i. to (e) sf wholesale produce market offices to combine 3 tenant office spaces into 1 conference rm. scope includes demo of e walls,doors, patch and repair of finishes, new finishes and paint throughout. new casework,lighting outlets, av systems to be installed. n/a maher.(e) hvac sys to remainDetails
t.i. to (e) sf wholesale produce market offices to combine 3 tenant office spaces into 1 conference rm. scope includes demo of e walls,doors, patch and repair of finishes, new finishes and paint throughout. new casework,lighting outlets, av systems to be installed. n/a maher.(e) hvac sys to remain | $50,927 |
| May 8, 2017 | Never finaled issued May 2017, no final | 307 Baden St | Edenavow Construction & Design | demolition, renovation and new construction (at "infill") to renovate and create living space on the ground floor. a new stair connection, new bedroom and bathroom & storage areas. the kitchen will be renovated. (n) walls, doors, windows, finishes, plumbing & electrical per plansDetails
demolition, renovation and new construction (at "infill") to renovate and create living space on the ground floor. a new stair connection, new bedroom and bathroom & storage areas. the kitchen will be renovated. (n) walls, doors, windows, finishes, plumbing & electrical per plans | $93,389 |
| Jan 6, 2017 | Completed final sign-off Sep 2017 | 901 Rankin St | Terence Mcmahon Construction | revisiont to pa 2016-1028-1410 to add prep room adjacent to kitchen, snack area & dry storage areaDetails
revisiont to pa 2016-1028-1410 to add prep room adjacent to kitchen, snack area & dry storage area | $17,000 |
| Oct 28, 2016 | Completed final sign-off Sep 2017 | 901 Rankin St | Terence Mcmahon Construction | 2nd flr: demo and construction of new walls, doors and windows to provide a commercial kitchen at the good eggs tenant space. a dry storage & snack area will also be constructed. new finishes & new lighting will be provided in a portion of the space. mep/fire/life saftey under sep permit maher naDetails
2nd flr: demo and construction of new walls, doors and windows to provide a commercial kitchen at the good eggs tenant space. a dry storage & snack area will also be constructed. new finishes & new lighting will be provided in a portion of the space. mep/fire/life saftey under sep permit maher na | $121,853 |
| Sep 14, 2016 | Completed final sign-off Mar 2017 | 459 Geary St | Modern Construction Inc | #400-tenant improvemnt on 4th fl of e recently renovated building in medical dermatology office. reception/waiting area, 5 consultation rooms, aestheticians room, doctor and assistant offices, and supporting spaces. accessible restrooms and exiting have been provided under 201206082224Details
#400-tenant improvemnt on 4th fl of e recently renovated building in medical dermatology office. reception/waiting area, 5 consultation rooms, aestheticians room, doctor and assistant offices, and supporting spaces. accessible restrooms and exiting have been provided under 201206082224 | $230,830 |
| Jul 12, 2016 | Expired or cancelled cancelled Nov 2024 | 1897 Funston Av | erect 4 story, type v, single family dwelling building.Details
erect 4 story, type v, single family dwelling building. | $623,000 | |
| Sep 25, 2015 | Completed final sign-off Feb 2016 | 946 Wisconsin St | Saturn Construction Co | revision to pa #201504234415 - add bathroom on 2nd level where closet currently exists in lower unit.Details
revision to pa #201504234415 - add bathroom on 2nd level where closet currently exists in lower unit. | $9,000 |
| Mar 3, 2015 | Completed final sign-off Feb 2016 | 901 Rankin St | Principal Builders Inc. | deferred submittal for pa#201502047447 includes: (2) storefront windows & (n) opening at demising wall between tenant & 2 warehouse spaces. n/a ordinance #155-13.Details
deferred submittal for pa#201502047447 includes: (2) storefront windows & (n) opening at demising wall between tenant & 2 warehouse spaces. n/a ordinance #155-13. | |
| Feb 4, 2015 | Completed final sign-off Feb 2016 | 901 Rankin St | Principal Builders Inc. | t.i. for warehouse & office use. general demolition & construction of interior partitions, new int doors and int windows. install windows in extg dock openings for architectural work only. refreg, sprnklers, storefront, structural, fire alarm under seper. submittal. n/a for the maher.Details
t.i. for warehouse & office use. general demolition & construction of interior partitions, new int doors and int windows. install windows in extg dock openings for architectural work only. refreg, sprnklers, storefront, structural, fire alarm under seper. submittal. n/a for the maher. | $250,000 |
| Jun 18, 2013 | Never finaled issued Jun 2013, no final | 3251 20th Av | space 115. project involves demolishing a protion of the existing improvement in a tenant space and enclosing a portion of space to be maintained by the landlord. mechanical, electrical, sprinkler and fire life safety by contractor. a 36" wide door will be added to a full height wall.Details
space 115. project involves demolishing a protion of the existing improvement in a tenant space and enclosing a portion of space to be maintained by the landlord. mechanical, electrical, sprinkler and fire life safety by contractor. a 36" wide door will be added to a full height wall. | $5,000 | |
| Sep 17, 2012 | Completed final sign-off Dec 2012 | 3251 20th Av | Culp Construction Company | 1/f- barrier removal, replace of all floor, walls, ceiling, finishes, plumbing fixtures, toilet compartments, toilet accessories, lighting at the women's & men's public restrooms located in stonestown galleria. fire, mechanical, electrical, engineering will be performed by design build contractorsDetails
1/f- barrier removal, replace of all floor, walls, ceiling, finishes, plumbing fixtures, toilet compartments, toilet accessories, lighting at the women's & men's public restrooms located in stonestown galleria. fire, mechanical, electrical, engineering will be performed by design build contractors | $60,000 |
| Oct 19, 2011 | Completed final sign-off Jun 2012 | 3251 20th Av | Webcor Construction Lp | replacement of all floor, wall & ceiling finishes, plmg fixtures toilet compartments, toilet accessories, lighting at womens and mens restrooms adjacent to the food court at the stonestown galleria. electrical and mechanical will be design-build @ second floor.Details
replacement of all floor, wall & ceiling finishes, plmg fixtures toilet compartments, toilet accessories, lighting at womens and mens restrooms adjacent to the food court at the stonestown galleria. electrical and mechanical will be design-build @ second floor. | $90,000 |
| Sep 9, 2010 | Completed final sign-off Jul 2011 | 180 Holladay Av | R B C General Contractors Inc. | exterior repairs and facade improvements.demo of (e)siding that is water damaged/dry rotted. replacement of water damaged /dry rotted wood elements,as req'd. (n)waterproofinmg,(n)siding, (n) waterproof membrane@roof,(n)entry canopy,(n)windows@(e)openings on 2nd&3rd levels and one modified(e)windowDetails
exterior repairs and facade improvements.demo of (e)siding that is water damaged/dry rotted. replacement of water damaged /dry rotted wood elements,as req'd. (n)waterproofinmg,(n)siding, (n) waterproof membrane@roof,(n)entry canopy,(n)windows@(e)openings on 2nd&3rd levels and one modified(e)window | $50,000 |
| Oct 29, 2009 | Completed final sign-off Dec 2011 | 1525 18th St | construction of a 1 story addition at the location of the (e) rear yard (at side of property), the addition will house 2 new rooms ( 1 bedroom), a roof deck will be located on top of the addition.Details
construction of a 1 story addition at the location of the (e) rear yard (at side of property), the addition will house 2 new rooms ( 1 bedroom), a roof deck will be located on top of the addition. | $115,000 | |
| Aug 1, 2006 | Completed final sign-off Apr 2007 | 1425 20th St | demolish *eo eck due to dry rot, build new self supporting deck to replace, reduce size, no work to existing house, in front or rearDetails
demolish *eo eck due to dry rot, build new self supporting deck to replace, reduce size, no work to existing house, in front or rear | $15,000 |