6 permits since 2000: 3 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2022 | Never finaled issued Sep 2022, no final | 3251 20th Av | unit 101: demo of (e) sales floor fixtures, ceilings, flooring, & partition walls for future t.i. by others. electrical panels, hvac system & restroom to remain as is.Details
unit 101: demo of (e) sales floor fixtures, ceilings, flooring, & partition walls for future t.i. by others. electrical panels, hvac system & restroom to remain as is. | $76,000 |
| Oct 26, 2021 | Completed final sign-off Mar 2023 | 285 Winston Dr | provide new openings in (e) parking garage egress stair. additional deferred maintenance/ finish upgrades to stai. interior are also included in scope of work. fire sprinklers & alarms deferred.Details
provide new openings in (e) parking garage egress stair. additional deferred maintenance/ finish upgrades to stai. interior are also included in scope of work. fire sprinklers & alarms deferred. | $190,000 |
| Dec 6, 2019 | Completed final sign-off Jan 2025 | 3251 20th Av | certifcationab-56 path of travel certification.Details
certifcationab-56 path of travel certification. | $97,848 |
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 3251 20th Av | grd fl: approximately 26,000 sqft of demolition of wall, floors, ceiling, plumbing, electrical, hvac. under ab-017. alarm/sprinkler deferred.Details
grd fl: approximately 26,000 sqft of demolition of wall, floors, ceiling, plumbing, electrical, hvac. under ab-017. alarm/sprinkler deferred. | $196,000 |
| Jun 7, 2016 | Never finaled issued Jul 2016, no final | 3251 20th Av | space #151- t.i. brookstone, 3500 sq.ft., fixtures, restroom (replace) & storefront (interior).Details
space #151- t.i. brookstone, 3500 sq.ft., fixtures, restroom (replace) & storefront (interior). | $195,000 |
| Sep 17, 2012 | Completed final sign-off Dec 2012 | 3251 20th Av | 1/f- barrier removal, replace of all floor, walls, ceiling, finishes, plumbing fixtures, toilet compartments, toilet accessories, lighting at the women's & men's public restrooms located in stonestown galleria. fire, mechanical, electrical, engineering will be performed by design build contractorsDetails
1/f- barrier removal, replace of all floor, walls, ceiling, finishes, plumbing fixtures, toilet compartments, toilet accessories, lighting at the women's & men's public restrooms located in stonestown galleria. fire, mechanical, electrical, engineering will be performed by design build contractors | $60,000 |